US4301121A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for leaching metal bearing ores
Assignee: Individual
•
Filing: 1980-11-10
•
Granted: 1981-11-17
•
Expires: 2000-11-10
Abstract
Abstract Disclosed is a method for above-ground leaching of metal bearing ores comprising (a) providing an ore body to be leached having positioned therein void-creating members, said members being positioned substantially vertical or at an angle to the horizontal plane in order that they are capable of being pulled out of said ore body in a substantially upward direction; (b) partially performing the leaching; (c) removing said members by pulling out in a substantially upward direction, thereby creating internal voids and causing shifting of ore in said ore body; and (d) completing the leaching.
Inventors
- 👤 Henry Von Kohorn
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 23:44
CPC Classifications
C; C22; C22B; C22B3/00; C22B3/04; Y; Y02; Y02P; Y02P10/00; Y02P10/20
Claims Analysis
Total Claims: 52
Claim 1
Independent Claim
92 words
A method for above-ground leaching of metal bearing ores which comprises: (a) providing an ore body to be leached having positioned therein void-creating members, said members being positioned substantially vertical or at an angle to the horizontal plane in order that they are capable of being pulled out of said ore body in a substantially upward direction; (b) partially performing the leaching; (c) removing said members by pulling out in a substantially upward direction, thereby creating internal voids and causing shifting of ore in said ore body; and (d) completing the leaching.
Claim 2
Independent Claim
92 words
A method for above-ground leaching of metal bearing ores which comprises: (a) providing an ore body to be leached having positioned therein void-creating members, said members being positioned substantially vertical or at an angle to the horizontal plane in order that they are capable of being pulled out of said ore body in a substantially upward direction; (b) partially performing the leaching; (c) removing said members by pulling out in a substantially upward direction, thereby creating internal voids and causing shifting of ore in said ore body; and (d) completing the leaching.
Claim 3
Dependent Claim
81 words
The method of claim 1 wherein a layer of metal bearing ore is first deposited on a leach pad and wherein construction of the ore body is then completed, said ore body having placed therein in a horizontally spaced relationship a plurality of void-creating members, said members resting on said ore body substantially vertical or at an angle to the horizontal plane in order that they are capable of being pulled out of said ore body in a substantially upward direction.
Claim 4
Dependent Claim
16 words
The method of claim 1 wherein the cross-sections of said void-creating members have a rounded configuration.
Claim 5
Dependent Claim
14 words
The method of claim 1 wherein said void-creating members have a substantially cylindrical shape.
Claim 6
Dependent Claim
36 words
The method of claim 4 wherein the diameter of the cylindrical void-creating members is sufficiently large to give said members sufficient stability unsupportedly to withstand the piling up of ore against and between them without toppling.
Claim 7
Dependent Claim
14 words
The method of claim 1 wherein said void-creating membershave triangular, square or rectangular cross-sections.
Claim 8
Dependent Claim
14 words
The method of claim 1 wherein said void-creating members are provided with internal struts.
Claim 9
Dependent Claim
26 words
The method of claim 1 wherein said void-creating members are positioned in said ore body by holding them in place during construction of said ore body.
Claim 10
Dependent Claim
22 words
The method of claim 1 wherein said void-creating members extend to or protrude from the top of said ore body during leaching.
Claim 11
Dependent Claim
15 words
The method of claim 1 wherein said void-creating members are upwardly pulled out by hoists.
Claim 12
Dependent Claim
12 words
The method of claim 1 wherein said void-creating members are open-ended pipes.
Claim 13
Dependent Claim
13 words
The method of claim 1 wherein said void-creating members are closed hollow cylinders.
Claim 14
Dependent Claim
24 words
The method of claim 1 wherein said void-creating members are tapered, having a smaller cross-section nearer their lower end than near their upper end.
Claim 15
Dependent Claim
24 words
The method of claim 1 wherein at least a portion of said void-creating members have perforations along at least a portion of their length.
Claim 16
Dependent Claim
22 words
The method of claim 14 wherein the cross sections of said perforations are larger near the upper end of said void-creating members.
Claim 17
Dependent Claim
20 words
The method of claim 14 wherein said perforations are along the lower portion of the length of the void-creating member.
Claim 18
Dependent Claim
15 words
The method of claim 14 wherein the lower ends of said void-creating members are closed.
Claim 19
Dependent Claim
10 words
The method of claim 17 wherein said members are hollow.
Claim 20
Dependent Claim
12 words
The method of claim 17 wherein the closed lower ends have perforations.
Claim 21
Dependent Claim
28 words
The method of claim 19 wherein the perforated pipes and their perforated lower ends are raised above the leach pad by unperforated downward extensions of the pipe walls.
Claim 22
Dependent Claim
25 words
The method of claim 19 wherein said perforations are smaller than the nominal size of the crushed ore particles used in constructing the ore body.
Claim 23
Dependent Claim
21 words
The method of claim 14 wherein the size of sid perforations progressively increases upwardly from the lower end of said pipes.
Claim 24
Dependent Claim
24 words
The method of claim 1 wherein said void-creating members are closed at their upper ends by removable covers during construction of said ore body.
Claim 25
Dependent Claim
20 words
The method of claim 1 wherein said void-creating members are provided with means to engage hoisting means for pulling out.
Claim 26
Dependent Claim
29 words
The method of claim 1 wherein the upper ends of said void-creating members are open and wherein leaching is partially performed by feeding leach liquor into said upper ends.
Claim 27
Dependent Claim
20 words
The method of claim 1 wherein ore is stacked around and between said void-creating members to construct an ore body.
Claim 28
Dependent Claim
14 words
The method of claim 1 wherein said void-creating members are substantially cylindrical elongated pipes.
Claim 29
Dependent Claim
18 words
The method of claim 1 wherein said void-creating members are in a horizontally spaced relationship to one another.
Claim 30
Dependent Claim
48 words
The method of claim 1 wherein a layer of metal bearing ore is deposited on a leach pad; said void-creating members are positioned on said layer in a horizontally spaced relationship; and construction of the ore body is completed by stacking additional ore against and between said members.
Claim 31
Dependent Claim
30 words
The method of claim 29 wherein said layer of metal bearing ore has a depth equal to about 1/8 to about 1/2 of the height of the completed ore body.
Claim 32
Dependent Claim
48 words
The method of claim 1 wherein the void-creating members are positioned in the ore by simultaneously suspending two or more members from a crane, equipped with a device capable of engaging and holding in place a plurality of members, while ore is being deposited around and between them.
Claim 33
Dependent Claim
32 words
The method of claim 1 wherein said void-creating members are held in a horizontal spaced relationship to each other by connecting means, the integrity of said means being destroyed upon partial leaching.
Claim 34
Dependent Claim
23 words
The method of claim 1 wherein the void-creating members are rotated one or more times during the leaching cycle before being pulled out.
Claim 35
Dependent Claim
117 words
The method of claim 1 wherein each of said void-creating members is held in place during the construction of the heap by a plurality of rigid, elongated support members; each of the support members is longer than the void-creating member; the upper ends of the support members are detachably attached to the upper ends of the void-creating members; the lower ends of the support members are spread outwardly from the void-creating members to create a multi-leg support base for each void-creating member; the void-creating members and support members automatically detach from each other when the void-creating member is pulled out; and the support members remain in the leach pile after the void-creating members have been pulled out.
Claim 36
Dependent Claim
25 words
The method of claim 34 wherein the support members are perforated pipes and during the leaching are charged with leaching solution at their upper ends.
Claim 37
Dependent Claim
20 words
The method of claim 1 wherein said void-creating members are pulled out in at least two partial, chronologically separated steps.
Claim 38
Independent Claim
106 words
A method for the extraction and recovery of metals from ores by above-ground leaching comprising: 1. providing a plurality of sets of removable void-creating members inserted in the ore body to be leached, wherein: a. each set of said members comprises at least two hollow, elongated members of which a first inner member having a smaller cross-section has been inserted into a second outer member having a larger cross-section, b. a void space is created between said inner and outer members, and c. said sets of members are positioned in the ore body in a vertical attitude or at an acute angle to the vertical plane;
Claim 39
Independent Claim
106 words
A method for the extraction and recovery of metals from ores by above-ground leaching comprising: 1. providing a plurality of sets of removable void-creating members inserted in the ore body to be leached, wherein: a. each set of said members comprises at least two hollow, elongated members of which a first inner member having a smaller cross-section has been inserted into a second outer member having a larger cross-section, b. a void space is created between said inner and outer members, and c. said sets of members are positioned in the ore body in a vertical attitude or at an acute angle to the vertical plane;
Claim 40
Dependent Claim
85 words
partially leaching the ore; 3. removing said outer members by pulling them out upwardly so as to create a void directly between the ore and the said inner members, causing movement of ore filling said void and of nearby ore; 4. Continuing partial leaching of the ore; 5. removing said inner members by pulling them out upwardly, so as to create a second void in the ore, causing additional movement of ore filling said second void and of nearby ore; and 6. completing the leaching.
Claim 41
Dependent Claim
85 words
partially leaching the ore; 3. removing said outer members by pulling them out upwardly so as to create a void directly between the ore and the said inner members, causing movement of ore filling said void and of nearby ore; 4. Continuing partial leaching of the ore; 5. removing said inner members by pulling them out upwardly, so as to create a second void in the ore, causing additional movement of ore filling said second void and of nearby ore; and 6. completing the leaching.
Claim 42
Independent Claim
59 words
The method of extracting metals from ores by above-ground heap leaching, wherein during the leaching the crushed ore pieces are caused to shift slightly at least twice at chronologically separated points in time by providing void-creating members in the ore body to be leached and removing said members by pulling them out in two or more chronologically separated steps.
Claim 43
Independent Claim
59 words
The method of extracting metals from ores by above-ground heap leaching, wherein during the leaching the crushed ore pieces are caused to shift slightly at least twice at chronologically separated points in time by providing void-creating members in the ore body to be leached and removing said members by pulling them out in two or more chronologically separated steps.
Claim 44
Independent Claim
155 words
A method for the extraction of metals from ores by above ground leaching, comprising: 1. commencing the construction of an ore body by depositing on a leach pad a layer of crushed ore, said layer having a plurality of peaks or ridges separated by hollows; 2. placing upon said peaks or ridges a plurality of rigid sheets, each sheet being supported by at least two peaks or ridges, so as to create voids below said sheets wherein said sheets; a. cover at least a major area of said ore layer, b. have perforations permitting the leaching solution, but not the ore pieces, to pass through them, c. are strong enough to support the weight of the ore deposited thereon in completing the ore body, and d. are subject at least in part to corrosion by the leaching solution, 3. completing the construction of the ore body by depositing additional crushed ore on said sheets, and
Claim 45
Independent Claim
155 words
A method for the extraction of metals from ores by above ground leaching, comprising: 1. commencing the construction of an ore body by depositing on a leach pad a layer of crushed ore, said layer having a plurality of peaks or ridges separated by hollows; 2. placing upon said peaks or ridges a plurality of rigid sheets, each sheet being supported by at least two peaks or ridges, so as to create voids below said sheets wherein said sheets; a. cover at least a major area of said ore layer, b. have perforations permitting the leaching solution, but not the ore pieces, to pass through them, c. are strong enough to support the weight of the ore deposited thereon in completing the ore body, and d. are subject at least in part to corrosion by the leaching solution, 3. completing the construction of the ore body by depositing additional crushed ore on said sheets, and
Claim 46
Dependent Claim
51 words
leaching the ore, thereby, during the leaching, impairing the structural integrity of said sheets by the corrosive effect of the leaching solution to such an extent as to cause their breaking up under the weight of the ore, thus causing movement of the individual crushed ore pieces in filling said voids.
Claim 47
Dependent Claim
51 words
leaching the ore, thereby, during the leaching, impairing the structural integrity of said sheets by the corrosive effect of the leaching solution to such an extent as to cause their breaking up under the weight of the ore, thus causing movement of the individual crushed ore pieces in filling said voids.
Claim 48
Dependent Claim
31 words
The method of claim 39 wherein the rigid perforated sheets comprise one or more materials, different parts of said sheets being subject to corrosion by the leaching solution at different rates.
Claim 49
Independent Claim
145 words
A method for the extraction of metals from ores by above ground leaching, comprising: 1. providing on a leach pad or on an ore layer previously deposited on a leach pad, rigid sheets, said sheets resting on a plurality of spacing support members so as to create voids below said sheets, wherein said sheets: a. cover at least a major area of the leach pad b. have perforations permitting the leaching solution, but not crushed ore pieces of nominal size, to pass through them, and c. are strong enough to support the weight of the ore deposited thereon in completing the ore body, and wherein said support members; a. prior to leaching, are strong enough to support the weight of the ore deposited on the sheets in completing the ore body, and b. are subject at least in part to corrosion by the leaching solution;
Claim 50
Independent Claim
145 words
A method for the extraction of metals from ores by above ground leaching, comprising: 1. providing on a leach pad or on an ore layer previously deposited on a leach pad, rigid sheets, said sheets resting on a plurality of spacing support members so as to create voids below said sheets, wherein said sheets: a. cover at least a major area of the leach pad b. have perforations permitting the leaching solution, but not crushed ore pieces of nominal size, to pass through them, and c. are strong enough to support the weight of the ore deposited thereon in completing the ore body, and wherein said support members; a. prior to leaching, are strong enough to support the weight of the ore deposited on the sheets in completing the ore body, and b. are subject at least in part to corrosion by the leaching solution;
Claim 51
Dependent Claim
65 words
completing the construction of the ore body by depositing crushed ore on said sheets; and 3. leaching the ore, wherein, during the leaching, the structural integrity of said support members is impaired by the corrosive effect of the leaching solution to such an extent as to cause their breaking up under the weight of the ore, causing movement of the ore in filling said voids.
Claim 52
Dependent Claim
65 words
completing the construction of the ore body by depositing crushed ore on said sheets; and 3. leaching the ore, wherein, during the leaching, the structural integrity of said support members is impaired by the corrosive effect of the leaching solution to such an extent as to cause their breaking up under the weight of the ore, causing movement of the ore in filling said voids.
References Cited (Backward Citations)
US3639003A
Cited
US3840365A
Cited
US3809430A
Cited
US3834760A
Cited
US4017309A
Cited
US4091070A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-11-16 | 1985-05-18 | 1985-11-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-11-16 | 1989-05-18 | 1989-11-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-11-16 | 1993-05-18 | 1993-11-17 | $7700.00 | Window Closed / Lapsed |