Apparatus and process for the operation of an environmentally satisfactory coal fired plant
Assignee: SCHOPPE FRITZ MAX-RUTTGERS-STR24 8026 EBENHAUSEN/ISARTAL WEST GERMANY
•
Filing: 1979-12-14
•
Granted: 1981-11-17
•
Expires: 1999-12-14
Abstract
Abstract The invention concerns a process for operating a coal-dust fired power plant in environmentally sound fashion and arrangements for accomplishment of the process pursuant to the invention. The same relates in particular to the reduction of the emission of gases harmful to the environment such as NO x and SO 2 . A particularly surface-active coal dust is used and is heated extremely rapidly in a burner muffle before being mixed with combustion air. After combustion the flame gases are very rapidly cooled down to a temperature under 1000° C. before being discharged from the burner muffle.
Inventors
- 👤 Fritz Schoppe
- 👤 Wilhelm Wenz
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 23:12
CPC Classifications
F; F22; F22B; F22B31/00; F22B31/04; F23; F23C; F23C3/00; F23C5/00; F23C9/00; F23C9/006; F23C2900/00; F23C2900/03006
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
242 words
The process for operating a coal-fixed power plant in environmentally sound fashion by reduction of the emission of NO x and SO 2 , said power plant being provided with a boiler structure having at least one firing chamber, said at least one chamber having cooled walls and a burner muffle and an accelerating nozzle, and means for firing said chamber with a coal dust fuel whereby said fuel is heated rapidly before being mixed with combustion air and is rapidly cooled by said walls before being discharged, the steps comprising: preparing a coal dust fuel having a surface-active ash, injecting said fuel into the return flow of a flame in said burner muffle, said firing chamber having a load of 5-15×10 6 kcal/m 3 hr, heating said coal dust at a rate of at least 1000° C./sec. to a temperature above the ignition point of the coal dust with combustion air at an intensity such that a firing-chamber load of 5-15×10 6 kcal/m 3 hr with respect to said burner muffle and said accelerating nozzle is obtained, producing a flame jet in the accelerating nozzle at a velocity of at least 100 m/sec., cooling the flame jet by intermixture with cooled flame gases from the firing chamber in less than 0.1 sec. to less than 1000° C. gas temperature, and discharging the cooled flame gases with at least part of the ash in the form of dust from the firing chamber.
Claim 2
Dependent Claim
242 words
The process for operating a coal-fixed power plant in environmentally sound fashion by reduction of the emission of NO x and SO 2 , said power plant being provided with a boiler structure having at least one firing chamber, said at least one chamber having cooled walls and a burner muffle and an accelerating nozzle, and means for firing said chamber with a coal dust fuel whereby said fuel is heated rapidly before being mixed with combustion air and is rapidly cooled by said walls before being discharged, the steps comprising: preparing a coal dust fuel having a surface-active ash, injecting said fuel into the return flow of a flame in said burner muffle, said firing chamber having a load of 5-15×10 6 kcal/m 3 hr, heating said coal dust at a rate of at least 1000° C./sec. to a temperature above the ignition point of the coal dust with combustion air at an intensity such that a firing-chamber load of 5-15×10 6 kcal/m 3 hr with respect to said burner muffle and said accelerating nozzle is obtained, producing a flame jet in the accelerating nozzle at a velocity of at least 100 m/sec., cooling the flame jet by intermixture with cooled flame gases from the firing chamber in less than 0.1 sec. to less than 1000° C. gas temperature, and discharging the cooled flame gases with at least part of the ash in the form of dust from the firing chamber.
Claim 3
Dependent Claim
26 words
The process of claim 1, wherein said coal dust is a mixture of commercially available brown coal dust, and fine anthracite dust under 20-micron particle size.
Claim 4
Dependent Claim
28 words
The process of claim 1, or claim 2, wherein said coal dust is a mixture of more than 70% brown coal dust and less than 30% anthracite dust.
Claim 5
Dependent Claim
35 words
The process of claim 3, wherein, selection of the injector action of the flame jet and the dimensions of the firing chamber along the walls thereof results in gas velocities of more than 40 m/sec.
References Cited (Backward Citations)
US871070A
Cited
US2800175A
Cited
US3955909A
Cited
US4000978A
Cited
US4057021A
Cited
US4128388A
Cited
US4223615A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-11-16 | 1985-05-18 | 1985-11-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-11-16 | 1989-05-18 | 1989-11-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-11-16 | 1993-05-18 | 1993-11-17 | $7700.00 | Window Closed / Lapsed |