US4297575A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Simultaneous gamma ray measurement of formation bulk density and casing thickness
Assignee: Halliburton Co
•
Filing: 1979-08-13
•
Granted: 1981-10-27
•
Expires: 1999-08-13
Abstract
Abstract A method for simultaneously measuring the formation bulk density and the thickness of casing in a cased well borehole is disclosed. Low energy gamma rays are emitted into the casing and formation in a cased borehole. Two longitudinally spaced detectors detect gamma rays scattered back into the borehole by the casing and surrounding earth materials. The count rate signals from the two detectors are appropriately combined according to predetermined relationships to produce the formation bulk density and the casing thickness, which are recorded as a function of borehole depth.
Inventors
- 👤 Harry D. Smith, Jr.
- 👤 Dan M. Arnold
- 👤 Kenneth J. Smith
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-24 12:40
CPC Classifications
G; G01; G01V; G01V5/00; G01V5/04; G01V5/08; G01V5/12; G01V5/125; E; E21; E21B; E21B47/00; E21B47/08; E21B47/085
Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
215 words
A method for logging a cased well borehole to determine simultaneously the bulk density of earth formations behind the wall casing and the thickness of the well casing, comprising the steps of: emitting low energy gamma radiation from a source of such radiation in a well borehole into the casing and earth formations surrounding a cased well borehole; detecting at a first, longitudinally spaced distance from said source, gamma radiation scattered back into the borehole by the casing and earth formations and generating first count rate signals representative thereof; detecting at a second, differently longitudinally spaced distance from said source, gamma radiation scattered back into the borehole by the casing and earth formations and generating secound count rate signals representative thereof; combining said first and second count rate signals according to a predetermined relationship to derive a third signal representative of the earth formation bulk density compensated for detector standoff from the earth formation caused by the casing and a fourth correction signal representing the correction required to compensate said third signal for the standoff; combining said third and fourth signals according to a second, different predetermined relationship, to derive a fifth signal representative of the thickness of the casing in the vicinity of said detectors; and recording at least said third and fifth signals.
Claim 2
Independent Claim
215 words
A method for logging a cased well borehole to determine simultaneously the bulk density of earth formations behind the wall casing and the thickness of the well casing, comprising the steps of: emitting low energy gamma radiation from a source of such radiation in a well borehole into the casing and earth formations surrounding a cased well borehole; detecting at a first, longitudinally spaced distance from said source, gamma radiation scattered back into the borehole by the casing and earth formations and generating first count rate signals representative thereof; detecting at a second, differently longitudinally spaced distance from said source, gamma radiation scattered back into the borehole by the casing and earth formations and generating secound count rate signals representative thereof; combining said first and second count rate signals according to a predetermined relationship to derive a third signal representative of the earth formation bulk density compensated for detector standoff from the earth formation caused by the casing and a fourth correction signal representing the correction required to compensate said third signal for the standoff; combining said third and fourth signals according to a second, different predetermined relationship, to derive a fifth signal representative of the thickness of the casing in the vicinity of said detectors; and recording at least said third and fifth signals.
Claim 3
Dependent Claim
35 words
A method of claim 1 wherein said steps are performed repetitively as said source and said detectors are moved through a cased well borehole and said recorded signals are recorded as function of borehole depth.
Claim 4
Dependent Claim
23 words
The method of claim 1 wherein said gamma ray source comprises a cesium 137 source which emits approximately 0.66 MEV gamma rays predominantly.
Claim 5
Dependent Claim
18 words
The method of claim 1 wherein at least one of said gamma ray detectors comprises a Geiger-Muller tube.
Claim 6
Dependent Claim
20 words
The method of claim 1 wherein at least one of said detectors comprises a thallium activated sodium iodide scintillation detector.
Claim 7
Dependent Claim
32 words
The method of claim 1 wherein said first predetermined relationship comprises an empirically derived relationship relating said first and second count rate signals to formation bulk density in a cased well borehole.
Claim 8
Dependent Claim
31 words
The method of claim 1 wherein said second predetermined relationship comprises an empirically derived relationship relating said correction signal and said formation bulk density signal to the thickness of said casing.
Claim 9
Dependent Claim
24 words
The method of claim 1 wherein said emitting and detecting steps are performed with said source and said detectors urged against the borehole wall.
Claim 10
Independent Claim
130 words
A method for simultaneously measuring formation bulk density and casing thickness in a cased well borehole comprising the steps of: irradiating earth formations in the vicinity of a cased well borehole with gamma radiation from a continuous gamma ray source disposed in the borehole; detecting at first and second longitudinally spaced distances in the borehole from said source, gamma rays scattered back into the borehole by earth formations and casing and generating first and second detector signals representative thereof; combining said detector signals according to a predetermined empirical relationship to derive a corrected formation bulk density signal and a standoff correction signal; and combining said detector signals according to a second predetermined empirical relationship to derive a signal indicative of the thickness of the casing in the cased well borehole.
Claim 11
Independent Claim
130 words
A method for simultaneously measuring formation bulk density and casing thickness in a cased well borehole comprising the steps of: irradiating earth formations in the vicinity of a cased well borehole with gamma radiation from a continuous gamma ray source disposed in the borehole; detecting at first and second longitudinally spaced distances in the borehole from said source, gamma rays scattered back into the borehole by earth formations and casing and generating first and second detector signals representative thereof; combining said detector signals according to a predetermined empirical relationship to derive a corrected formation bulk density signal and a standoff correction signal; and combining said detector signals according to a second predetermined empirical relationship to derive a signal indicative of the thickness of the casing in the cased well borehole.
Claim 12
Dependent Claim
33 words
The method of claim 9 and further including repeating the steps at different depth levels in a well borehole and recording at least two of said signals as a function of borehole depth.
Claim 13
Dependent Claim
23 words
The method of claim 9 wherein the irradiating step is performed with a relatively low energy gamma ray source to avoid pair production.
Claim 14
Dependent Claim
13 words
The method of claim 11 wherein said source comprises a cesium 137 source.
Claim 15
Dependent Claim
18 words
The method of claim 9 wherein said detecting steps are performed with at least one Geiger-Muller tube detector.
Claim 16
Dependent Claim
21 words
The method of claim 9 wherein said detecting steps are performed with at least one sodium iodide thallium activated scintillation detector.
Claim 17
Dependent Claim
29 words
The method of claim 9 wherein said empirical relationships are derived by calibrating said source and detectors configuration in cased boreholes having known properties prior to making said measurements.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-10-26 | 1985-04-27 | 1985-10-27 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-10-26 | 1989-04-27 | 1989-10-27 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-10-26 | 1993-04-27 | 1993-10-27 | $7700.00 | Window Closed / Lapsed |