← Back to Patent Explorer
US4292543A Expired / Lapsed US ⏱️ 0.0 years remaining

Electrical energy management devices

Assignee: CEDCO Inc A CORP OF
•
Filing: 1979-09-21
•
Granted: 1981-09-29
•
Expires: 1999-09-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method and apparatus for minimizing the peak load usage in electrical systems having multiple electrical power loads when each load is provided electrical power from an electrical source and including first switch means disposed in the power supply to each individual load, operator means to selectively open and close the first switch means, control means to selectively control the operator means, real time clock means to supply real time to the control means where the control means is adapted to actuate and deactuate each operator means at a preselected time to correspondingly open and close the first switch means associated with the operator means where the control means prevents simultaneous actuation of more than one operator means within a selected time interval, power outage detector means in cooperative association with the power source means to detect a power interruption at the power source means, second control means actuated upon resumption of power after interruption including input means, where the second control means is actuated by the power interruption and is adapted to override the first control means to sequentially reactivate the first switch means and load means which are to be in active condition at the real time of power resumption and where such reactivation occurs at a selected time interval and in selected time interval and in selected sequence, and return control from the second control means to the first control means upon resumption of power to all selected load means.

Inventors

  • 👤 Jerry K. Reed, Sr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 22:52
CPC Classifications
H; H02; H02H; H02H3/00; H02H3/24; H02H3/247; H02H3/02; H02H3/06; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; H02J2105/57; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 284 words
Apparatus for minimizing peak load usage in selected electrical system having multiple electrical power loads where each load is provided electrical power source means by means of load power supply circuit means, including: first switch means disposed in selected load power supply circuit means, first switch operator means to selectively open and close said first switch means; real time clock means to supply real time to control means where the control means is adapted to actuate and deactuate each said first switch operator means at a preselected time to correspondingly open and close first switch means associated with the operator means where the control means prevents simultaneous actuation of more than one first switch operator means within a selected time interval; and power outage detector means to detect power interruption at the electrical power source means; second control means actuated by said control means upon resumption of power after power interruption, where the second control means is adapted to override the first control means in the event of power interruption and at the time of power resumption to sequentially reactivate said first switch means and load means which are to be in active condition at the real time of power resumption and where reactivation of said first switch means which can be activiated at time of power resumption occurs at selected time intervals and in selected sequence, and return control from the second control means to the first control means upon resumption of power to all switch means which are to be activated at time of power resumption; and alternate power supply means actuated by power interruption to supply power to said first and second control means during the period of rush power interruption.
Claim 2
Dependent Claim 284 words
Apparatus for minimizing peak load usage in selected electrical system having multiple electrical power loads where each load is provided electrical power source means by means of load power supply circuit means, including: first switch means disposed in selected load power supply circuit means, first switch operator means to selectively open and close said first switch means; real time clock means to supply real time to control means where the control means is adapted to actuate and deactuate each said first switch operator means at a preselected time to correspondingly open and close first switch means associated with the operator means where the control means prevents simultaneous actuation of more than one first switch operator means within a selected time interval; and power outage detector means to detect power interruption at the electrical power source means; second control means actuated by said control means upon resumption of power after power interruption, where the second control means is adapted to override the first control means in the event of power interruption and at the time of power resumption to sequentially reactivate said first switch means and load means which are to be in active condition at the real time of power resumption and where reactivation of said first switch means which can be activiated at time of power resumption occurs at selected time intervals and in selected sequence, and return control from the second control means to the first control means upon resumption of power to all switch means which are to be activated at time of power resumption; and alternate power supply means actuated by power interruption to supply power to said first and second control means during the period of rush power interruption.

References Cited (Backward Citations)

US4180744A Cited
US4189776A Cited
US4177388A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-09-28 1985-03-30 1985-09-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-09-28 1989-03-30 1989-09-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-09-28 1993-03-30 1993-09-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag