Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
351 words
A method for a shutdown and restarting of a combined plant comprising in combination a gas turbine, a waste heat recovery boiler heated by a heat of exhausts from said gas turbine to generate steam, and a steam turbine driven by the steam generated by said waste heat recovery boiler, said method comprising the steps, which are followed when the plant is restarted following temporary shutdown, of: (1) shutting down the steam turbine while the gas turbine is still operating at high load by reducing a load applied to the steam turbine before reducing the load applied to the gas turbine, when the load applied to the entire plant is to be reduced; (2) allowing excess main steam produced by the load reduction and shutdown of the steam turbine to flow through a bypass system to a condenser without causing the excess main steam to flow through the steam turbine; (3) maintaining metal of the steam turbine at a temperature level substantially equal to a temperature at which the metal is maintained during operation of the steam turbine by supplying steam, as gland sealing steam, of a temperature level substantially equal to a temperature level of the metal of the steam turbine in operation at the time of load reduction and shutdown of the steam turbine; (4) shutting down the gas turbine after further reducing the gas turbine load to a level lower than a level attained in said steam turbine shutting down step; (5) starting the gas turbine first to increase the load applied to the plant when the plant is to be restarted; (6) maintaining the metal of the steam turbine at a temperature level substantially equal to the temperature level of the metal of the steam turbine attained during operation of the latter, by supplying steam of a temperature level substantially equal to a temperature level of the metal of the steam turbine attained during operation of the latter as gland sealing steam for the steam turbine; and (7) starting the steam turbine by the steam generated by the waste heat recovery boiler to increase the plant load.
Claim 2
Independent Claim
351 words
A method for a shutdown and restarting of a combined plant comprising in combination a gas turbine, a waste heat recovery boiler heated by a heat of exhausts from said gas turbine to generate steam, and a steam turbine driven by the steam generated by said waste heat recovery boiler, said method comprising the steps, which are followed when the plant is restarted following temporary shutdown, of: (1) shutting down the steam turbine while the gas turbine is still operating at high load by reducing a load applied to the steam turbine before reducing the load applied to the gas turbine, when the load applied to the entire plant is to be reduced; (2) allowing excess main steam produced by the load reduction and shutdown of the steam turbine to flow through a bypass system to a condenser without causing the excess main steam to flow through the steam turbine; (3) maintaining metal of the steam turbine at a temperature level substantially equal to a temperature at which the metal is maintained during operation of the steam turbine by supplying steam, as gland sealing steam, of a temperature level substantially equal to a temperature level of the metal of the steam turbine in operation at the time of load reduction and shutdown of the steam turbine; (4) shutting down the gas turbine after further reducing the gas turbine load to a level lower than a level attained in said steam turbine shutting down step; (5) starting the gas turbine first to increase the load applied to the plant when the plant is to be restarted; (6) maintaining the metal of the steam turbine at a temperature level substantially equal to the temperature level of the metal of the steam turbine attained during operation of the latter, by supplying steam of a temperature level substantially equal to a temperature level of the metal of the steam turbine attained during operation of the latter as gland sealing steam for the steam turbine; and (7) starting the steam turbine by the steam generated by the waste heat recovery boiler to increase the plant load.
Claim 3
Dependent Claim
60 words
A method as claimed in claim 1, wherein said gland sealing steam for maintaining the steam turbine metal temperature in said steam turbine metal temperature maintaining steps is at least one of a steam generated by said waste heat recovery boiler, main steam, steam of other units, and a steam generated by an auxiliary boiler, and heated by a heater.
Claim 4
Dependent Claim
63 words
A method as claimed in claim 2, wherein said steam turbine includes a high-pressure turbine and a low-pressure turbine and said gland sealing steam is supplied to both high-pressure and low-pressure gland sections, and wherein said heating of said gland sealing steam by said heater is effected only to the gland sealing steam which is to be supplied to said high-pressure gland section.
Claim 5
Dependent Claim
53 words
A method as claimed in claim 2, wherein said steam turbine includes a high-pressure turbine and a low-pressure turbine, and wherein said gland sealing steam heated by said heater is supplied to said high-pressure gland section, while said heated gland sealing steam is supplied to low-pressure gland sections after it has been cooled.
Claim 6
Dependent Claim
33 words
A method as claimed in claim 1, wherein said first-mentioned metal temperature maintaining step, gas turbine shutting down step, gas turbine starting step and second-mentioned metal temperature maintaining step are carried out continuously.