US4281496A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of forming concrete floors and product of the method
Assignee: Individual
•
Filing: 1979-07-06
•
Granted: 1981-08-04
•
Expires: 1999-07-06
Abstract
Abstract A method for forming a concrete floor as a monolithic unit is disclosed wherein wet concrete mix is deposited and screeded to achieve a generally uniform thickness of concrete with the aggregate being densified or settled to produce a thin upper layer formed substantially from sand and cement, thereafter floating the concrete to substantially remove surface irregularities, and then grinding the upper surface of the concrete floor after it is hardened to produce a flat surface having a "sanded" finish.
Inventors
- 👤 Jan O. Danielsson
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 21:43
CPC Classifications
E; E04; E04F; E04F15/00; E04F15/12
Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
131 words
In a method for forming a concrete floor, the steps comprising depositing wet concrete mix and roughly leveling the concrete and then floating the surface of the concrete to produce a more level surface, the step of depositing the concrete being performed according to a predetermined pattern selected to form the floor as substantially a monolithic unit, the combination of the steps of depositing, rough leveling and floating the concrete being selected in order to effectively densify the concrete and produce a thin upper layer formed substantially of water, sand and cement, allowing the concrete to stand for a period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder in order to produce a flat, porous surface having a sanded quality.
Claim 2
Dependent Claim
131 words
In a method for forming a concrete floor, the steps comprising depositing wet concrete mix and roughly leveling the concrete and then floating the surface of the concrete to produce a more level surface, the step of depositing the concrete being performed according to a predetermined pattern selected to form the floor as substantially a monolithic unit, the combination of the steps of depositing, rough leveling and floating the concrete being selected in order to effectively densify the concrete and produce a thin upper layer formed substantially of water, sand and cement, allowing the concrete to stand for a period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder in order to produce a flat, porous surface having a sanded quality.
Claim 3
Dependent Claim
50 words
The method of claim 1 wherein the concrete is densified in a first float operation carried out after the concrete is deposited and rough leveled, the concrete thereafter being smooth floated prior to allowing the concrete to stand and then having a thin surface portion removed in a grinding operation.
Claim 4
Dependent Claim
30 words
The method of claim 2 wherein the first densification float step is performed with a corrugated bull float or the like in order to mechanically settle aggregate within the concrete.
Claim 5
Dependent Claim
20 words
The method of claim 3 wherein the second float operation is carried out by means of a smooth bull float.
Claim 6
Dependent Claim
28 words
The method of claim 2 wherein the first densification float step is performed with a smooth float operated with a tamping action to settle aggregate within the concrete.
Claim 7
Dependent Claim
18 words
The method of claim 5 wherein the second float operation is then performed with a smooth float device.
Claim 8
Dependent Claim
59 words
The method of claim 2 wherein the second float step is delayed until after bleed water has risen in the concrete and the concrete is sufficiently set up to support the weight of an operator, the second float operation then being carried out by means of a power float in order to permit working of the reduced plasticity concrete.
Claim 9
Dependent Claim
58 words
The method of claim 1 wherein the float operation is delayed until after bleed water has risen in the concrete and the concrete is sufficiently set up to support the weight of an operator, the second float operation then being carried out by means of a power float in order to permit working of the reduced plasticity concrete.
Claim 10
Dependent Claim
32 words
The method of claim 1 wherein densification is accomplished by adding excess water to the concrete prior to or at the time of deposition in order to settle aggregate within the concrete.
Claim 11
Dependent Claim
35 words
The method of claim 1 wherein the rough leveling operation is performed by means of an unsupported, manual screed wherein the rough level of the concrete is visually determined by an operator for the screed.
Claim 12
Dependent Claim
137 words
A concrete floor formed as a product of a process comprising the steps of depositing wet concrete mix and roughly leveling the concrete and then floating the surface of the concrete to produce a more level surface, the step of depositing the concrete being performed according to a predetermined pattern selected to form the floor substantially as a monolithic unit, the combination of the steps of depositing, rough leveling and floating the concrete being selected in order to effectively densify the concrete and produce a thin upper layer formed substantially of water, sand and cement, allowing the concrete to stand for a period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder, the concrete floor being further characterized by a flat, porous surface having a sanded quality.
Claim 13
Dependent Claim
137 words
A concrete floor formed as a product of a process comprising the steps of depositing wet concrete mix and roughly leveling the concrete and then floating the surface of the concrete to produce a more level surface, the step of depositing the concrete being performed according to a predetermined pattern selected to form the floor substantially as a monolithic unit, the combination of the steps of depositing, rough leveling and floating the concrete being selected in order to effectively densify the concrete and produce a thin upper layer formed substantially of water, sand and cement, allowing the concrete to stand for a period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder, the concrete floor being further characterized by a flat, porous surface having a sanded quality.
Claim 14
Dependent Claim
184 words
In a method for forming a concrete floor in a large unobstructed area, the steps comprising simultaneously depositing, rough leveling and densifying wet concrete mix with a vibrating screed supported by forms extending along opposite sides of the floor area in order to produce an upper layer of wet concrete with a thin upper layer being formed substantially of water, sand and cement, the simultaneous step of depositing, rough leveling and densifying the concrete being continued across the entire expanse of the area in order to form the concrete floor as a monolithic unit, allowing the concrete to stand until bleed water has risen to the surface and the concrete is sufficiently set up to support the weight of an operator, then floating the surface of the concrete by means of a power float in order to permit working of concrete having reduced plasticity, allowing the concrete to stand for an additional period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder in order to produce a flat, porous surface having a sanded quality.
Claim 15
Dependent Claim
184 words
In a method for forming a concrete floor in a large unobstructed area, the steps comprising simultaneously depositing, rough leveling and densifying wet concrete mix with a vibrating screed supported by forms extending along opposite sides of the floor area in order to produce an upper layer of wet concrete with a thin upper layer being formed substantially of water, sand and cement, the simultaneous step of depositing, rough leveling and densifying the concrete being continued across the entire expanse of the area in order to form the concrete floor as a monolithic unit, allowing the concrete to stand until bleed water has risen to the surface and the concrete is sufficiently set up to support the weight of an operator, then floating the surface of the concrete by means of a power float in order to permit working of concrete having reduced plasticity, allowing the concrete to stand for an additional period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder in order to produce a flat, porous surface having a sanded quality.
Claim 16
Dependent Claim
188 words
A concrete floor formed within an unobstructed area as a product of a process comprising the steps of simultaneously depositing, rough leveling and densifying wet concrete mix with a vibrating screed supported by forms extending along opposite sides of the floor area in order to produce a layer of wet concrete with a thin upper layer being formed substantially of water, sand and cement, the simultaneous steps of depositing, rough leveling and densifying the concrete being continued across the entire expanse of the area in order to form the concrete floor as a monolithic unit, allowing the concrete to stand until bleed water has risen to the surface and the concrete is sufficiently set up to support the weight of an operator, then floating the surface of the concrete by means of a power float in order to permit working of concrete with reduced plasticity, allowing the concrete to stand for an additional period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder, the finished concrete floor being characterized by a flat, porous surface having a sanded quality.
Claim 17
Dependent Claim
188 words
A concrete floor formed within an unobstructed area as a product of a process comprising the steps of simultaneously depositing, rough leveling and densifying wet concrete mix with a vibrating screed supported by forms extending along opposite sides of the floor area in order to produce a layer of wet concrete with a thin upper layer being formed substantially of water, sand and cement, the simultaneous steps of depositing, rough leveling and densifying the concrete being continued across the entire expanse of the area in order to form the concrete floor as a monolithic unit, allowing the concrete to stand until bleed water has risen to the surface and the concrete is sufficiently set up to support the weight of an operator, then floating the surface of the concrete by means of a power float in order to permit working of concrete with reduced plasticity, allowing the concrete to stand for an additional period of at least approximately 24 hours and then removing a thin surface portion from the concrete with a grinder, the finished concrete floor being characterized by a flat, porous surface having a sanded quality.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-08-03 | 1985-02-02 | 1985-08-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-08-03 | 1989-02-02 | 1989-08-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-08-03 | 1993-02-02 | 1993-08-04 | $7700.00 | Window Closed / Lapsed |