Abstract

Abstract A desuperheater is disposed in a steam supply line supplying superheated steam to a shell and tube reheater.

Inventors

  • 👤 George J. Silvestri, Jr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 12:54
CPC Classifications
F; F01; F01K; F01K3/00; F01K3/18; F01K3/26; F01K3/262

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 178 words
A power plant comprising in combination means for supplying superheated steam, a first turbine receiving said superheating steam and exhausting steam at a lower pressure and temperature, a second turbine receiving exhaust steam from said first turbine, said turbines being connected to a load, a reheater disposed between said first and second turbine to reheat the steam flowing from said first to said second turbine, said reheater utilizing superheated steam from within said power plant as the heating medium, a desuperheater disposed to desuperheat the superheated steam from within said power plant before it enters said reheater, a controller responsive to the pressure of said steam entering said desuperheater, the temperature of the steam leaving said desuperheater, the temperature of the steam entering said second turbine and said load to control said desuperheater and throttling means disposed to throttle the steam from within the power plant before it enters the desuperheater, said controller also controlling said throttling means, whereby the reheater may be operated with low temperature gradients reducing thermal shock and extending the life of the reheater.
Claim 2
Dependent Claim 178 words
A power plant comprising in combination means for supplying superheated steam, a first turbine receiving said superheating steam and exhausting steam at a lower pressure and temperature, a second turbine receiving exhaust steam from said first turbine, said turbines being connected to a load, a reheater disposed between said first and second turbine to reheat the steam flowing from said first to said second turbine, said reheater utilizing superheated steam from within said power plant as the heating medium, a desuperheater disposed to desuperheat the superheated steam from within said power plant before it enters said reheater, a controller responsive to the pressure of said steam entering said desuperheater, the temperature of the steam leaving said desuperheater, the temperature of the steam entering said second turbine and said load to control said desuperheater and throttling means disposed to throttle the steam from within the power plant before it enters the desuperheater, said controller also controlling said throttling means, whereby the reheater may be operated with low temperature gradients reducing thermal shock and extending the life of the reheater.
Claim 3
Dependent Claim 29 words
The combination as set forth in claim 1, wherein the reheater is a shell and tube reheater and the steam from within the power plant passes through the tubes.

References Cited (Backward Citations)

US2747373A Cited
US2902831A Cited
US3169374A Cited
US3898842A Cited
US3979914A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-06-22 1984-12-22 1985-06-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-06-22 1988-12-22 1989-06-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-06-22 1992-12-22 1993-06-23 $7700.00 Window Closed / Lapsed