Abstract
Abstract A vibrating concrete screed utilizes a plurality of air-driven vibrators which are mounted on an elongated frame in a manner designed to achieve a unique vibration pattern throughout the length of the frame. An air-driven winch on the screed enables the screed to be winched automatically and at a controlled speed while the screed is being vibrated.
Inventors
- 👤 Donald R. Morrison
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 22:46
CPC Classifications
E; E04; E04G; E04G21/00; E04G21/02; E04G21/10; B; B28; B28B; B28B1/00; B28B1/08; B28B1/093; B28B1/29; E01; E01C; E01C19/00; E01C19/22; E01C19/30; E01C19/34; E01C19/40
Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
189 words
A vibrating concrete screed comprising: (a) an elongate open structure frame in the form of an isosceles triangle in cross section including: (i) a pair of parallel spaced apart screed plates positioned at the lower corners of said triangle and adapted to engage and level concrete as said screed is moved over the concrete; (ii) a hollow structurally strengthening ridge tube positioned at the apex of said triangle and extending with its bore for the length of said frame; (iii) side braces fixed to and extending between said screed plates and said ridge tube; (iv) angled base braces extending between said screed plates and fixed thereto at respective non-opposed points of securement; (b) a set of air-operated vibrators spaced along the length of said frame and each being centrally located on a said angled brace; (c) conduit means communicating each said vibrator to a selected location in the bore of said tube; and (d) a pressurized air source communicating with said ridge tube bore for energizing said vibrators whereby to establish points of vibrations in said screed plates at each said point of securement of said angled braces thereto.
Claim 2
Dependent Claim
189 words
A vibrating concrete screed comprising: (a) an elongate open structure frame in the form of an isosceles triangle in cross section including: (i) a pair of parallel spaced apart screed plates positioned at the lower corners of said triangle and adapted to engage and level concrete as said screed is moved over the concrete; (ii) a hollow structurally strengthening ridge tube positioned at the apex of said triangle and extending with its bore for the length of said frame; (iii) side braces fixed to and extending between said screed plates and said ridge tube; (iv) angled base braces extending between said screed plates and fixed thereto at respective non-opposed points of securement; (b) a set of air-operated vibrators spaced along the length of said frame and each being centrally located on a said angled brace; (c) conduit means communicating each said vibrator to a selected location in the bore of said tube; and (d) a pressurized air source communicating with said ridge tube bore for energizing said vibrators whereby to establish points of vibrations in said screed plates at each said point of securement of said angled braces thereto.
Claim 3
Dependent Claim
33 words
A screed as claimed in claim 1 wherein the central axis of each said angled cross brace forms an included angle of between 15° to 45° with the longitudinal axis of said plates.
Claim 4
Dependent Claim
63 words
A screed as claimed in claim 1 wherein each said angled base brace is formed in an X-pattern, is secured at four non-opposed points of securement to said plates and each mounts and said air vibrator centrally of said X-pattern whereby to establish two points of vibration on one plate which are non-opposed to two points of vibration established on the other plate.
Claim 5
Dependent Claim
68 words
A screed as claimed in claim 1 including an air-operated winching means secured to said screed and dependent for an air supply on conduit means communicating with the bore of said ridge tube whereby said air source is enabled to simultaneously communicate pressurized air through said ridge tube to said vibrators to achieve vibration of said frame and to said winching means to achieve winching of said frame.
Claim 6
Dependent Claim
47 words
A screed as claimed in claim 1 wherein said ridge tube is formed with downwardly and outwardly extending flange portions and the upper ends of said side braces are adapted to be overlapped by and bolted to said flange portions to strengthen and secure said frame together.
Claim 7
Dependent Claim
179 words
A vibrating concrete screed comprising: (a) an elongate open structure frame including: (i) a pair of parallel spaced apart screed plates positioned at lower base corners of said frame and adapted to engage and level concrete as said screed is moved over the concrete; (ii) a hollow tube member extending with its bore for the length of said frame; (iii) side braces fixed to and extending between said screed plates and the upper structure of said frame; (iv) angled base braces extending between said screed plates and fixed thereto at respective non-opposed points of securement; (b) a set of air-operated vibrators spaced along the length of said frame and each being located on a said angled brace at a position intermediate the length thereof; (c) conduit means communicating each said vibrator to a selected location in the bore of said tube member; and (d) a pressurized air source communicating with said tube member bore for energizing said vibrators whereby to establish points of vibrations in said screed plates at each said point of securement of said angled braces thereto.
Claim 8
Dependent Claim
179 words
A vibrating concrete screed comprising: (a) an elongate open structure frame including: (i) a pair of parallel spaced apart screed plates positioned at lower base corners of said frame and adapted to engage and level concrete as said screed is moved over the concrete; (ii) a hollow tube member extending with its bore for the length of said frame; (iii) side braces fixed to and extending between said screed plates and the upper structure of said frame; (iv) angled base braces extending between said screed plates and fixed thereto at respective non-opposed points of securement; (b) a set of air-operated vibrators spaced along the length of said frame and each being located on a said angled brace at a position intermediate the length thereof; (c) conduit means communicating each said vibrator to a selected location in the bore of said tube member; and (d) a pressurized air source communicating with said tube member bore for energizing said vibrators whereby to establish points of vibrations in said screed plates at each said point of securement of said angled braces thereto.
Claim 9
Dependent Claim
60 words
A vibrating concrete screed as claimed in claim 6: (a) wherein said elongated frame is in the form of an isosceles triangle in cross section; (b) wherein said screed plates are positioned at the lower corners of said triangle; and (c) said tube member comprises a structural tube member at the apex and extending for the length of said frame.
Claim 10
Dependent Claim
68 words
A screed as claimed in claim 6 including an air-operated winching means secured to said screed and dependent for an air supply on conduit means communicating with the bore of said tube member whereby said air source is enabled to simultaneously communicate pressurized air through said tube member to said vibrators to achieve vibration of said frame and to said winching means to achieve winching of said frame.
Claim 11
Dependent Claim
103 words
A vibrating concrete screed as claimed in claim 6: (a) wherein said elongate open frame structure comprises at least a pair of separable frame units each having its own said screed plates, tube member, side and angled braces, vibrators and conduit means; (b) including means removably connecting together adjacent end portions of adjacent frame units in fixed relationship to each other; and (c) including means interconnecting and communicating the respective said tube members and their respective bores to said air source such that said points of vibration are established at each said point of securement of said angled braces in all said units.
Claim 12
Dependent Claim
60 words
A vibrating concrete screed as claimed in claim 9 wherein said means interconnecting and communicating said respective tube members for each said pair of separable frame units includes adjustment means for varying the angular relationship of each frame unit relative to each other frame unit to which it is connected while maintaining air communication through the respective said tube members.
Claim 13
Dependent Claim
129 words
A screed as claimed in claim 7 wherein said elongate open frame structure comprises at least a pair of said separable frame units on either end of a base said frame unit and wherein each said frame unit at the end of said base unit includes an air-operated winching means secured to the respective said frame unit and dependent for an air supply on conduit means communicating with the bore of the tube member of the respective said frame unit on which said winching means is secured whereby said air source is enabled to simultaneously communicate pressurized air through said tube member to said vibrators to achieve vibration of said frame and to each said winching means to achieve winching of said frame at the outer extreme ends thereof.
References Cited (Backward Citations)
CA510260A
Cited
US1390479A
Cited
US2592960A
Cited
US3377933A
Cited
US3412658A
Cited
US3453988A
Cited
US3767312A
Cited
US4030873A
Cited
US4132492A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-04-13 | 1984-10-13 | 1985-04-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-04-13 | 1988-10-13 | 1989-04-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-04-13 | 1992-10-13 | 1993-04-14 | $7700.00 | Window Closed / Lapsed |