Abstract Processes and apparatus for the heat treatment of fine-grained material, particularly for the production of cement, wherein the material is preheated in a preheater, further heated in a precalcination zone using additional fuel, calcined to completion in a rotary kiln, and cooled in a cooler, the preheated material being introduced into a cooling air stream run off from the cooler and the resulting mixture of gas and solids being introduced from the side into a gas pipe which connects the rotary kiln to the preheater and through which the kiln exhaust gases flow in the upward direction.

Inventors

  • 👤 Horst Ritzmann
  • 👤 Klaus Bauer
  • 👤 Heinz-Herbert Schmits
  • 👤 Wolf Goldmann
  • 👤 Hennig Korn

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 12:58
CPC Classifications
C; C04; C04B; C04B7/00; C04B7/36; C04B7/43; C04B7/434; F; F27; F27B; F27B7/00; F27B7/20; F27B7/2016; F27B7/2025; F27B7/2033

Claims Analysis

Total Claims: 23
Claim 1
Independent Claim 161 words
In a process for the heat treatment of fine-grained material such as cement wherein the material is preheated by kiln exhaust gases in a multistage cyclone preheater, further heated in a precalcination zone, burned in a kiln below said preheater, and cooled in a cooler, and wherein a cooling gas stream from the cooler is introduced into a gas pipe connecting the kiln to the preheater and through which the kiln exhaust gases flow upwardly toward the preheater, said gas pipe defining said precalcination zone between said kiln and said preheater, the improvement comprising dividing the cooling gas stream into a plurality of component streams; introducing said component streams into said gas pipe at peripherally spaced points in the region of said precalcination zone and at a downward inclination to the horizontal introducing preheated material from the penultimate cyclone stage of the preheater into each of said component streams upstream from said gas pipe; and combusting fuel in said precalcination zone.
Claim 2
Dependent Claim 161 words
In a process for the heat treatment of fine-grained material such as cement wherein the material is preheated by kiln exhaust gases in a multistage cyclone preheater, further heated in a precalcination zone, burned in a kiln below said preheater, and cooled in a cooler, and wherein a cooling gas stream from the cooler is introduced into a gas pipe connecting the kiln to the preheater and through which the kiln exhaust gases flow upwardly toward the preheater, said gas pipe defining said precalcination zone between said kiln and said preheater, the improvement comprising dividing the cooling gas stream into a plurality of component streams; introducing said component streams into said gas pipe at peripherally spaced points in the region of said precalcination zone and at a downward inclination to the horizontal introducing preheated material from the penultimate cyclone stage of the preheater into each of said component streams upstream from said gas pipe; and combusting fuel in said precalcination zone.
Claim 3
Dependent Claim 23 words
Process according to claim 1 wherein said component streams are downwardly inclined at an angle of between 20° and 60° to the horizontal.
Claim 4
Dependent Claim 29 words
Process according to claim 1 including introducing said preheated material into said component streams at an angle of between 50° and 85° to the flow path of said streams.
Claim 5
Dependent Claim 29 words
Process according to claim 1 including introducing said preheated material into said component streams at an angle of between 60° and 80° to the flow path of said streams.
Claim 6
Dependent Claim 40 words
Process according to claim 1 including introducing said preheated material to each of said component streams at a distance from said gas pipe of between 0.4 and 1.2 times the square root of the cross-sectional area of such component stream.
Claim 7
Dependent Claim 40 words
Process according to claim 1 including introducing said preheated material to each of said component streams at a distance from said gas pipe of between 0.6 and 0.9 times the square root of the cross-sectional area of such component stream.
Claim 8
Dependent Claim 19 words
Process according to claim 1 including introducing fuel into each of said component streams upstream from said gas pipe.
Claim 9
Dependent Claim 23 words
Process according to claim 7 including introducing fuel into each of said component streams downstream from the introduction thereto of said preheated material.
Claim 10
Dependent Claim 150 words
In apparatus for the heat treatment of fine-grained material such as cement having a multistage cyclone preheater for preheating such material, a kiln below said preheater for burning such material, a cooler for cooling burned material, a gas pipe extending between said kiln and said preheater for conducting kiln exhaust gases upwardly toward said preheater and forming a precalcining zone between said kiln and said preheater, and conduit means extending between said cooler and said gas pipe for delivering cooling gas to the latter, the improvement wherein said conduit means comprises a plurality of branches communicating with said gas pipe at peripherally spaced points in the region of said precalcination zone and downwardly inclined to the horizontal; means for delivering preheated material from the penultimate cyclone stage of said preheater to each of said branches and upstream from said gas pipe; and means for introducing fuel into said precalcining zone.
Claim 11
Dependent Claim 150 words
In apparatus for the heat treatment of fine-grained material such as cement having a multistage cyclone preheater for preheating such material, a kiln below said preheater for burning such material, a cooler for cooling burned material, a gas pipe extending between said kiln and said preheater for conducting kiln exhaust gases upwardly toward said preheater and forming a precalcining zone between said kiln and said preheater, and conduit means extending between said cooler and said gas pipe for delivering cooling gas to the latter, the improvement wherein said conduit means comprises a plurality of branches communicating with said gas pipe at peripherally spaced points in the region of said precalcination zone and downwardly inclined to the horizontal; means for delivering preheated material from the penultimate cyclone stage of said preheater to each of said branches and upstream from said gas pipe; and means for introducing fuel into said precalcining zone.
Claim 12
Dependent Claim 23 words
Apparatus according to claim 9 wherein said component streams are downwardly inclined at an angle of between 20° and 60° to the horizontal.
Claim 13
Dependent Claim 29 words
Apparatus according to claim 10 wherein the means for delivering preheated material to said branches is inclined at an angle of between 50° and 85° to the associated branch.
Claim 14
Dependent Claim 29 words
Apparatus according to claim 10 wherein the means for delivering preheated material to said branches is inclined at an angle of between 60° and 80° to the associated branch.
Claim 15
Dependent Claim 37 words
Apparatus according to claim 9 wherein upstream distance between said gas pipe and each of said preheated material delivering means is between 0.4 and 1.2 times the square root of the cross-sectional area of the associated branch.
Claim 16
Dependent Claim 37 words
Apparatus according to claim 9 wherein upstream distance between said gas pipe and each of said preheated material delivering means is between 0.6 and 0.9 times the square root of the cross-sectional area of the associated branch.
Claim 17
Dependent Claim 25 words
Apparatus according to claim 9 wherein the means for introducing fuel communicates with said gas pipe via said branches and upstream from said gas pipe.
Claim 18
Dependent Claim 27 words
Apparatus according to claim 15 wherein the means for introducing fuel communicates with said gas pipe via said branches and downstream from said preheated material delivering means.
Claim 19
Dependent Claim 36 words
Apparatus according to claim 16 wherein the distance between said material delivering means and said fuel delivering means amounts to between 0.5 and 1.0 times the distance from said material delivering means and said gas pipe.
Claim 20
Dependent Claim 36 words
Apparatus according to claim 16 wherein the distance between said material delivering means and said fuel delivering means amounts to between 0.6 and 0.8 times the distance from said material delivering means and said gas pipe.
Claim 21
Dependent Claim 49 words
Apparatus according to claim 9 wherein said penultimate stage of said preheater comprises a single cyclone having a discharge pipe joined to branch pipes corresponding in number to the number of said branches, and including adjustable distributor means at the juncture of said discharge pipe with said branch pipes.
Claim 22
Dependent Claim 43 words
Apparatus according to claim 9 wherein said gas pipe has a cross-sectional constriction at a level below that at which said branches communicate with said gas pipe, and wherein said constriction is defined by flat, opposed walls forming parts of said gas pipe.
Claim 23
Dependent Claim 20 words
Apparatus according to claim 9 including material deflector means in each of said branches adjacent the associated material delivering means.

References Cited (Backward Citations)

US3873331A Cited
US3904353A Cited
US4004876A Cited
FR2272359B3 Cited
US4014641A Cited
US4105396A Cited
US4094626A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-03-23 1984-09-22 1985-03-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-03-23 1988-09-22 1989-03-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-03-23 1992-09-22 1993-03-24 $7700.00 Window Closed / Lapsed