← Back to Patent Explorer
US4248625A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of operating a blast furnace

Assignee: JFE Steel Corp
•
Filing: 1979-08-06
•
Granted: 1981-02-03
•
Expires: 1999-08-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of operating a blast furnace comprising the steps of selecting sight factors mathematically and statistically as effective in determining the operating condition of a blast furnace, sensing the eight factors as sample data, converting the sample data into variable factors, comparing the sample data and the variable factors with predetermined limiting factors, generating numerical non-dimension values corresponding to the level of satisfaction between the sample date or variable factors and the corresponding limiting values, multiplying the numerical non-dimensional values by predetermined corresponding weight allocation indices, summing separately the results of the multiplication for the sample data and the variable factors to form a numerical factor grand addition output and a variable factors grand addition output, summing the numerical factors grand addition output and the variable factors grand addition output to form an overall grand addition output and taking appropriate action to control the furnace based upon the values of the overall grand addition output, numerical factors and variable factors grand addition outputs and the numerical non-dimensional values.

Inventors

  • 👤 Sakae Tamura
  • 👤 Kyoji Okabe
  • 👤 Tsuyoshi Fukutake
  • 👤 Seiji Taguchi
  • 👤 Tamotsu Nagai
  • 👤 Mitsuo Saino
  • 👤 Tadaaki Iwamura

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 00:32
CPC Classifications
G; G05; G05B; G05B13/00; G05B13/02; G05B13/0265; C; C21; C21B; C21B5/00; C21B5/006

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 357 words
A method of operating a blast furnace characterized in that said method comprises the steps of: detecting from a blast furnace as sample data factors comprising total pressure drop, pressure drop between shaft and furnace top, burden descent, top gas utilization, top gas temperature, shaft wall temperature, thermal state in furnace and input and output balance of iron and slag; determining from said sample data variable factors corresponding to each of said detective factors; comparing said sample data for each factor with predetermined limiting values corresponding to the respective factors; generating a numerical non-dimensional output for each comparison corresponding to the level of satisfaction between the respective sample data and the respective predetermined limiting values; multiplying the numerical non-dimensional output for each comparison by predetermined weight allocations and generating an output corresponding to the numerical non-dimensional values multiplied by the predetermined weight allocations for each of the numerical non-dimensional outputs; summing the outputs as a result of the multiplication and generating a numerical factor grand addition output corresponding to the summation of said outputs as a result of said multiplication; comparing said variable factors with variable factor limiting values corresponding to each of said variable factors; generating a variable factor numerical non-dimensional output for each comparison corresponding to the level of satisfaction between the variable factors and the corresponding predetermined limiting value; multiplying each of the variable factor numerical non-dimensional outputs by a predetermined weight allocation; multiplying each of the variable factor numerical non-dimensional outputs by a predetermined weight allocation; summing each of the variable factors numerical non-dimensional outputs which have been multiplied by a corresponding predetermined weight allocation to form a variable factor grand addition output; summing both the numerical factor grand addition output and the variable factor grand addition output to form an overall grand addition output indicative of the operation of the blast furnace; and taking appropriate action to control the operating condition of the blast furnace based on the value of the overall grand addition, numerical factor grand addition, variable factors grand addition and the numerical non-dimensional outputs as a result of the comparisons for both the sample data and the variable factors.
Claim 2
Independent Claim 357 words
A method of operating a blast furnace characterized in that said method comprises the steps of: detecting from a blast furnace as sample data factors comprising total pressure drop, pressure drop between shaft and furnace top, burden descent, top gas utilization, top gas temperature, shaft wall temperature, thermal state in furnace and input and output balance of iron and slag; determining from said sample data variable factors corresponding to each of said detective factors; comparing said sample data for each factor with predetermined limiting values corresponding to the respective factors; generating a numerical non-dimensional output for each comparison corresponding to the level of satisfaction between the respective sample data and the respective predetermined limiting values; multiplying the numerical non-dimensional output for each comparison by predetermined weight allocations and generating an output corresponding to the numerical non-dimensional values multiplied by the predetermined weight allocations for each of the numerical non-dimensional outputs; summing the outputs as a result of the multiplication and generating a numerical factor grand addition output corresponding to the summation of said outputs as a result of said multiplication; comparing said variable factors with variable factor limiting values corresponding to each of said variable factors; generating a variable factor numerical non-dimensional output for each comparison corresponding to the level of satisfaction between the variable factors and the corresponding predetermined limiting value; multiplying each of the variable factor numerical non-dimensional outputs by a predetermined weight allocation; multiplying each of the variable factor numerical non-dimensional outputs by a predetermined weight allocation; summing each of the variable factors numerical non-dimensional outputs which have been multiplied by a corresponding predetermined weight allocation to form a variable factor grand addition output; summing both the numerical factor grand addition output and the variable factor grand addition output to form an overall grand addition output indicative of the operation of the blast furnace; and taking appropriate action to control the operating condition of the blast furnace based on the value of the overall grand addition, numerical factor grand addition, variable factors grand addition and the numerical non-dimensional outputs as a result of the comparisons for both the sample data and the variable factors.
Claim 3
Dependent Claim 21 words
A method according to claim 1 wherein each of the sample data is compared with predetermined limiting values in a comparitor.
Claim 4
Dependent Claim 18 words
A method according to claim 1 wherein there are three numerical non-dimensional values corresponding to levels of satisfaction.
Claim 5
Dependent Claim 17 words
A method according to claim 3 wherein the three levels of satisfaction are "good," "worse" and "bad."
Claim 6
Dependent Claim 19 words
A method according to claim 2 wherein said predetermined weight allocations are stored in a weight allocation index generator.

References Cited (Backward Citations)

US3304171A Cited
BE751721A Cited
US3690632A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-02-03 1984-08-04 1985-02-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-02-03 1988-08-04 1989-02-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-02-03 1992-08-04 1993-02-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag