Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
358 words
In a drilling rig for forming boreholes which has a pipe rack situated in spaced relationship to a rig floor and means by which piping is run into and out of the borehole, the combination with said drilling rig of a pipe-conveying apparatus by which pipe is transported from the pipe rack to the rig floor, and vice versa; said pipe-conveying apparatus having an elongated, ground-supported main frame, an elongated boom supported by said main frame, said boom and said main frame having a remote end opposed to a near end, the near end being the end closest to the drilling rig; a ramp having an upper and a lower end, said ramp includes an inclined track means, said upper end of the ramp being attached to the rig floor and said lower end of the ramp being attached to the near end of the main frame, a boom guide captured by the track means and connected to the near end of the boom, means for moving said boom guide along the track means so that when the boom guide is moved up the track means, the near end of the boom is elevated into close proximity of the drill floor and vertically positioned above the far end of the boom; means connecting said remote end of said boom to the remote end of said main frame to cause the remote end of the boom to be lifted vertically upwards and towards the rig floor concurrently with upward movement of said boom guide; a stinger having an upper surface in the form of a pipe-receiving trough; said stinger having a near end and a far end, means by which said stinger is reciprocatingly supported respective to said boom in a manner that the stinger can be telescoped into the boom and a marginal end thereof extended therefrom; means for moving the stinger respective to the boom; so that when the boom is elevated by the boom guide, the stinger can be extended from the boom so that the near marginal end of a pipe supported within the trough is disposed in overlying relationship respective to the rig floor.
Claim 2
Dependent Claim
358 words
In a drilling rig for forming boreholes which has a pipe rack situated in spaced relationship to a rig floor and means by which piping is run into and out of the borehole, the combination with said drilling rig of a pipe-conveying apparatus by which pipe is transported from the pipe rack to the rig floor, and vice versa; said pipe-conveying apparatus having an elongated, ground-supported main frame, an elongated boom supported by said main frame, said boom and said main frame having a remote end opposed to a near end, the near end being the end closest to the drilling rig; a ramp having an upper and a lower end, said ramp includes an inclined track means, said upper end of the ramp being attached to the rig floor and said lower end of the ramp being attached to the near end of the main frame, a boom guide captured by the track means and connected to the near end of the boom, means for moving said boom guide along the track means so that when the boom guide is moved up the track means, the near end of the boom is elevated into close proximity of the drill floor and vertically positioned above the far end of the boom; means connecting said remote end of said boom to the remote end of said main frame to cause the remote end of the boom to be lifted vertically upwards and towards the rig floor concurrently with upward movement of said boom guide; a stinger having an upper surface in the form of a pipe-receiving trough; said stinger having a near end and a far end, means by which said stinger is reciprocatingly supported respective to said boom in a manner that the stinger can be telescoped into the boom and a marginal end thereof extended therefrom; means for moving the stinger respective to the boom; so that when the boom is elevated by the boom guide, the stinger can be extended from the boom so that the near marginal end of a pipe supported within the trough is disposed in overlying relationship respective to the rig floor.
Claim 3
Dependent Claim
118 words
The combination of claim 1 wherein said means connecting said remote end of said boom to the remote end of said main frame includes a swing arm assembly, said swing arm assembly has opposed ends with a journal formed at each of said opposed ends, one opposed end being journaled to said main frame and the other of said opposed ends being journaled to said boom; said main frame and boom form opposed sides of a polygon while said ramp and said swing arm assembly form opposed, connecting sides of said polygon when said boom is in the extended configuration; and when said boom guide is at its lowermost position, said boom is retracted into said main frame.
Claim 4
Dependent Claim
56 words
The combination of claim 2 wherein said ramp is pivotally attached to the near end of said main frame and removably attached to said rig floor so that said ramp can be folded down onto said main frame to thereby provide a low profile package which can be easily transported from one drill site to another.
Claim 5
Dependent Claim
50 words
The combination of claim 3 wherein said boom guide supports the near end of said boom and underlies said boom, rollers disposed on opposed sides of said boom guide in underlying relationship to said boom, said track being located on opposed sides of the ramp and capture said rollers therewithin.
Claim 6
Dependent Claim
54 words
The combination of claim 4 wherein said boom guide is actuated by a cable means roved about a pulley located at the upper extremity of said track and roved to a winch located within said main frame; said stinger is telescoped out of and into said boom by means of a winch-operated cable means.
Claim 7
Dependent Claim
66 words
The combination of claim 2 wherein said swing arm assembly is a hydraulically actuated piston and cylinder, means for extending said piston during the extension of the boom from the main frame so that the length of the swing arm assembly can be increased and thereby lower the near end of the stinger relative to the derrick floor when the boom is in the extended configuration.
Claim 8
Dependent Claim
315 words
A pipe-conveying apparatus for moving pipe between a rig floor and a pipe rack which is spaced vertically below and horizontally away from the rig floor; said apparatus includes a ground-supported main structure, a boom, a swing arm assembly, an elevator; and a pipe-receiving stinger; said boom and said main structure having a near end adapted to be placed near a drilling rig and a far end remote from said near end, means by which one end of said elevator can be attached to the near end of said main structure and the other end of said elevator can be attached to a rig floor of a drilling rig; said elevator includes a boom guide attached to said near end of said boom so that the near end of the boom can be moved vertically upwardly and at the same time horizontally away from said far end of said main structure, whereupon the near end of the boom can be elevated into proximity of a rig floor; means for moving said boom guide respective to the main structure; said swing arm assembly has a swing end and a pivoted end, said swing end being journaled to the far end of said boom, said pivoted end being journaled to the marginal, far end of said main structure so that when the elevator lifts the near end of the boom, the far end thereof is lifted vertically up and horizontally towards the near end of the main structure; means by which said stinger is supported for reciprocal movement respective to said boom, so that a pipe which is supported by the stinger can be telescopingly moved in a direction towards and away from said far end of said boom, whereupon the boom is elevated and the stinger extended over a rig floor; thereby enabling a pipe to be transported between a pipe rack and a rig floor.
Claim 9
Dependent Claim
315 words
A pipe-conveying apparatus for moving pipe between a rig floor and a pipe rack which is spaced vertically below and horizontally away from the rig floor; said apparatus includes a ground-supported main structure, a boom, a swing arm assembly, an elevator; and a pipe-receiving stinger; said boom and said main structure having a near end adapted to be placed near a drilling rig and a far end remote from said near end, means by which one end of said elevator can be attached to the near end of said main structure and the other end of said elevator can be attached to a rig floor of a drilling rig; said elevator includes a boom guide attached to said near end of said boom so that the near end of the boom can be moved vertically upwardly and at the same time horizontally away from said far end of said main structure, whereupon the near end of the boom can be elevated into proximity of a rig floor; means for moving said boom guide respective to the main structure; said swing arm assembly has a swing end and a pivoted end, said swing end being journaled to the far end of said boom, said pivoted end being journaled to the marginal, far end of said main structure so that when the elevator lifts the near end of the boom, the far end thereof is lifted vertically up and horizontally towards the near end of the main structure; means by which said stinger is supported for reciprocal movement respective to said boom, so that a pipe which is supported by the stinger can be telescopingly moved in a direction towards and away from said far end of said boom, whereupon the boom is elevated and the stinger extended over a rig floor; thereby enabling a pipe to be transported between a pipe rack and a rig floor.
Claim 10
Dependent Claim
48 words
The apparatus of claim 7 wherein said boom, swing arm assembly, elevator, and main structure each form one side of a polygon when the apparatus is in the extended configuration; and said boom is positioned parallel to said main structure when the boom is in the retracted configuration.
Claim 11
Dependent Claim
22 words
The apparatus of claim 8 wherein said boom is received within said main structure when the apparatus is in the retracted configuration.
Claim 12
Dependent Claim
40 words
The apparatus of claim 7 wherein said swing arm assembly includes two spaced-apart, telescoping members placed on opposed sides of the boom, means for extending the length of the swing arms as the boom is extended from the main structure.