US4231171A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for mining nodules from beneath the sea
Assignee: Commissariat à l'Énergie Atomique et Aux Énergies Alternatives
•
Filing: 1978-01-13
•
Granted: 1980-11-04
•
Expires: 1998-01-13
Abstract
Abstract Polymetallic nodules are collected by means of a plurality of self-propelled vehicles which move upwards and downwards between the sea floor and a surface platform under the action of excess ballast which is partially and progressively released as the vehicle approaches the bottom. The vehicles are propelled along the sea floor by means of at least two supporting units each having at least one helical propulsion fin, the remainder of the ballast being released in order to return the vehicles upwards for docking, unloading and energy-recharging in the surface platform.
Inventors
- 👤 Pierre Balligand
- 👤 Yves Corfa
- 👤 Pierre Lemercier
- 👤 Paul Marchal
- 👤 Jean Vertut
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 01:57
CPC Classifications
E; E02; E02F; E02F9/00; E02F9/06; B; B63; B63B; B63B35/00; B63B35/40; B63C; B63C11/00; B63C11/34; B63C11/36; B63C11/40; B63H; B63H19/00; B63H19/08; E02F7/00; E02F7/005; E02F9/02; E02F9/026; E21; E21C; E21C50/00; E21C50/02; B63B2035/405
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
221 words
A method of exploitation of a deposit of polymetallic nodules on a sea floor from a platform located at the surface of the sea, said polymetallic nodules comprising metallic material and sterile material, said nodules being adapted to be treated for separating the sterile material from the metallic material, said method including the steps of, (a) charging with energy a plurality of self-propelled vehicles, said vehicles being provided with means for dredging and stocking said nodules, and loading said vehicles with releasable ballast, (b) downwardly displacing said vehicles into the sea from the platform under the action of excess ballast, (c) releasing a portion of said excess ballast at the vehicles' approach to the sea floor to make softer the landing of the vehicle on the sea floor, (d) propelling said vehicles on the sea floor by self-propelling means carried by the vehicles, the self-propelling means consisting of at least two supporting units of revolutions, each said unit being provided with at least one helical propulsion fin, in order to dredge and stock said nodules, and simultaneously and progressively releasing said ballast so that said released ballast permanently compensates for the added weight of the stocked nodules, (e) upwardly displacing said vehicles back to the platform by releasing the remaining portion of ballast, (f) discharging the stocked nodules on said platform.
Claim 2
Independent Claim
221 words
A method of exploitation of a deposit of polymetallic nodules on a sea floor from a platform located at the surface of the sea, said polymetallic nodules comprising metallic material and sterile material, said nodules being adapted to be treated for separating the sterile material from the metallic material, said method including the steps of, (a) charging with energy a plurality of self-propelled vehicles, said vehicles being provided with means for dredging and stocking said nodules, and loading said vehicles with releasable ballast, (b) downwardly displacing said vehicles into the sea from the platform under the action of excess ballast, (c) releasing a portion of said excess ballast at the vehicles' approach to the sea floor to make softer the landing of the vehicle on the sea floor, (d) propelling said vehicles on the sea floor by self-propelling means carried by the vehicles, the self-propelling means consisting of at least two supporting units of revolutions, each said unit being provided with at least one helical propulsion fin, in order to dredge and stock said nodules, and simultaneously and progressively releasing said ballast so that said released ballast permanently compensates for the added weight of the stocked nodules, (e) upwardly displacing said vehicles back to the platform by releasing the remaining portion of ballast, (f) discharging the stocked nodules on said platform.
Claim 3
Dependent Claim
22 words
A method according to claim 1 wherein the treatment of nodules is carried out by a plant located on the surface platform.
Claim 4
Dependent Claim
24 words
A method according to claim 1 wherein the paths of upward motion and downward motion of the vehicles are adjusted by means of tail-planes.
Claim 5
Dependent Claim
40 words
A method according to claim 1, wherein during operations involving landing on the sea floor or docking to the platform, the apparent weight of the vehicles is adjusted by acting on hydropneumatic ballasting system associated with the ballast releasing means.
Claim 6
Dependent Claim
40 words
A method according to claim 4, wherein at least one said vehicle is equipped with a buoyancy unit, the normal trim and zero buoyancy being restored to said vehicle during docking operations by releasing a part of the buoyancy unit.
Claim 7
Dependent Claim
53 words
A method according to claim 5 wherein the step of loading with ballast said vehicles consists in stocking the releasable ballast in two silos provided within each of said vehicles one silo being placed at the forward end of a vehicle the other being placed beneath the center of flotation of said vehicles.
Claim 8
Dependent Claim
53 words
A method according to claim 6 wherein the step of stocking said nodules within each of said vehicles consists of stocking said nodules within a further silo placed beneath the center of flotation and having an apparent weight capacity which is smaller than the sum of the capacity of the two silos aforesaid.
Claim 9
Dependent Claim
41 words
A method according to claim 6 wherein the step of releasing a portion of said excess ballast consists of opening the silo placed at the forward end of the vehicle when said vehicle approaches a predetermined distance from the sea floor.
Claim 10
Dependent Claim
74 words
A method according to claim 1 wherein the step of releasing a portion of said excess of ballast at the approach of said sea floor consists in suspending a weight to the vehicle by means of a cable, and providing said cable with such a length that, when said weight touches the sea floor, the force due to the weight is no longer applied to the vehicle, the weight is disconnected from the vehicle.
Claim 11
Dependent Claim
30 words
A method according to claim 1, wherein the releasable ballast loaded within said self-propelled vehicles is mostly constituted by the sterile material derived from the treatment of the nodules themselves.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-11-04 | 1984-05-05 | 1984-11-04 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-11-04 | 1988-05-05 | 1988-11-04 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-11-04 | 1992-05-05 | 1992-11-04 | $7700.00 | Window Closed / Lapsed |