Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
195 words
In a method of constructing a swimming pool of the type in which an excavation is formed in the ground, in which the excavation has a bottom and a horizontal footing area which supports a vertical wall member that forms at least a portion of a wall of the swimming pool, and in which the wall member has a bottom portion; the improvement which includes the steps of: (a) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; (b) attaching removable groove-forming means generally horizontally to the vertical wall member at a desired distance above the concrete footing; (c) pouring additional concrete over at least a portion of the concrete footing and upwardly against a portion of the vertical wall member to a position in which a portion of the groove-forming means is embedded in the additional concrete; (d) removing the groove-forming means from the vertical wall member to expose a groove formed in the additional poured concrete; and (e) filling the groove with waterproof caulking material to seal a seam formed between the additional concrete and the vertical wall member.
Claim 2
Dependent Claim
195 words
In a method of constructing a swimming pool of the type in which an excavation is formed in the ground, in which the excavation has a bottom and a horizontal footing area which supports a vertical wall member that forms at least a portion of a wall of the swimming pool, and in which the wall member has a bottom portion; the improvement which includes the steps of: (a) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; (b) attaching removable groove-forming means generally horizontally to the vertical wall member at a desired distance above the concrete footing; (c) pouring additional concrete over at least a portion of the concrete footing and upwardly against a portion of the vertical wall member to a position in which a portion of the groove-forming means is embedded in the additional concrete; (d) removing the groove-forming means from the vertical wall member to expose a groove formed in the additional poured concrete; and (e) filling the groove with waterproof caulking material to seal a seam formed between the additional concrete and the vertical wall member.
Claim 3
Dependent Claim
48 words
The method of constructing a swimming pool as set forth in claim 1, which includes the step of placing waterproof sheeting over at least a portion of the footing area and a portion of the bottom of the excavation prior to the step of forming a concrete footing.
Claim 4
Dependent Claim
133 words
In a method of constructing a swimming pool, the steps of: (a) forming an excavation in the ground, the excavation including a side, a horizontal footing area, and a bottom, with the footing area extending between the bottom and the side; (b) placing waterproof sheeting over at least a portion of the footing area and a portion of the bottom; (c) supporting a vertical wall member having a bottom portion upon the footing area; (d) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; and (e) applying a bottom finish material over at least a portion of the footing and upwardly against a portion of the vertical wall member, and over at least a portion of the excavation bottom.
Claim 5
Dependent Claim
133 words
In a method of constructing a swimming pool, the steps of: (a) forming an excavation in the ground, the excavation including a side, a horizontal footing area, and a bottom, with the footing area extending between the bottom and the side; (b) placing waterproof sheeting over at least a portion of the footing area and a portion of the bottom; (c) supporting a vertical wall member having a bottom portion upon the footing area; (d) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; and (e) applying a bottom finish material over at least a portion of the footing and upwardly against a portion of the vertical wall member, and over at least a portion of the excavation bottom.
Claim 6
Dependent Claim
21 words
The method of constructing a swimming pool as set forth in claim 3 in which the bottom finish material is concrete.
Claim 7
Dependent Claim
23 words
The method of constructing a swimming pool as set forth in claim 3 in which the bottom finish material is sprayed polyurethane foam.
Claim 8
Dependent Claim
91 words
The method of constructing a swimming pool as set forth in claim 3 which includes the steps of attaching removable groove-forming means to the vertical wall member at a desired distance above the concrete footing after the concrete footing has been formed, and removing the groove-forming means from the vertical wall member to expose a groove formed in the additional poured concrete after the bottom finish material has been applied; and filling the groove with waterproof caulking material to seal a seam formed between additional concrete and the vertical wall member.
Claim 9
Independent Claim
206 words
A method of constructing a swimming pool or the like including the steps of: (a) forming an excavation in the ground, the excavation including a side, a horizontal footing area, and a bottom, with the footing area extending between the bottom and the side; (b) placing waterproof sheeting over at least a portion of the footing area and a portion of the bottom; (c) supporting a vertical wall member having a bottom portion upon the footing area; (d) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; (e) attaching removable groove-forming means generally horizontally to the vertical wall member at a desired distance above the concrete footing; (f) pouring additional concrete over at least a portion of the concrete footing and upwardly against a portion of the vertical wall member to a position in which at least a portion of the groove-forming means is embedded in the additional concrete; (g) removing the groove-forming means from the vertical wall member to expose a groove formed in the additional poured concrete; and (h) filling the groove with waterproof caulking material to seal a seam formed between the additional concrete and the vertical wall member.
Claim 10
Independent Claim
206 words
A method of constructing a swimming pool or the like including the steps of: (a) forming an excavation in the ground, the excavation including a side, a horizontal footing area, and a bottom, with the footing area extending between the bottom and the side; (b) placing waterproof sheeting over at least a portion of the footing area and a portion of the bottom; (c) supporting a vertical wall member having a bottom portion upon the footing area; (d) forming a concrete footing on the horizontal footing area with the bottom portion of the vertical wall member embedded in the concrete footing; (e) attaching removable groove-forming means generally horizontally to the vertical wall member at a desired distance above the concrete footing; (f) pouring additional concrete over at least a portion of the concrete footing and upwardly against a portion of the vertical wall member to a position in which at least a portion of the groove-forming means is embedded in the additional concrete; (g) removing the groove-forming means from the vertical wall member to expose a groove formed in the additional poured concrete; and (h) filling the groove with waterproof caulking material to seal a seam formed between the additional concrete and the vertical wall member.