← Back to Patent Explorer
US4223729A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for producing a geothermal reservoir in a hot dry rock formation for the recovery of geothermal energy

Assignee: Individual
•
Filing: 1979-01-12
•
Granted: 1980-09-23
•
Expires: 1999-01-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for creating a hot dry rock oven for the extraction of heat energy is disclosed wherein the geothermal fluid injection and withdrawal wells are brought into positive hydraulic communication during the creation of the hot dry rock oven. The oven complex is produced by fracturing the formation from a plurality of bore holes simultaneously.

Inventors

  • 👤 John W. Foster

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 04:11
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/17; F; F24; F24T; F24T10/00; F24T10/20; Y; Y02; Y02E; Y02E10/00; Y02E10/10

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 130 words
A process for creating a fracture complex in a hot dry rock formation, comprising the steps of: (a) drilling at least one fluid injection well and one fluid withdrawal well which are approximately vertical to the approximate location within a crystalline rock formation at which a temperature exists from which useful heat energy may be extracted; (b) deviating said wells from their vertical orientation in a direction approximately perpendicular to the compass direction of the most likely fracture plane of said formation such that said withdrawal well lies above, parallel to and in approximately the same vertical plane as the fluid injection well; (c) simultaneously fracturing said formation from said injection and withdrawal wells to produce a single interconnecting fracture of large surface area connecting said wells for hydraulic communication.
Claim 2
Dependent Claim 130 words
A process for creating a fracture complex in a hot dry rock formation, comprising the steps of: (a) drilling at least one fluid injection well and one fluid withdrawal well which are approximately vertical to the approximate location within a crystalline rock formation at which a temperature exists from which useful heat energy may be extracted; (b) deviating said wells from their vertical orientation in a direction approximately perpendicular to the compass direction of the most likely fracture plane of said formation such that said withdrawal well lies above, parallel to and in approximately the same vertical plane as the fluid injection well; (c) simultaneously fracturing said formation from said injection and withdrawal wells to produce a single interconnecting fracture of large surface area connecting said wells for hydraulic communication.
Claim 3
Dependent Claim 33 words
The process of claim 1, further comprising: orientating means for fracturing said formation within said injection and withdrawal wells in alignment with the vertical direction of the anticipated fracture plane of said formation.
Claim 4
Dependent Claim 27 words
The process of claim 2, further comprising: gradually and contemporaneously pressuring the fracture means to the rock failure pressure to simultaneously fracture the formation from said wells.
Claim 5
Dependent Claim 27 words
The process of claim 3, wherein the pressure of the fracture means are contemporaneously increased over a period of time from about 10 to about 30 minutes.
Claim 6
Dependent Claim 31 words
The process of claim 1, wherein simultaneous fracturing is repeated at a plurality of parallel positions along the deviated portions of said injection and withdrawal wells to create a fracture complex.
Claim 7
Dependent Claim 21 words
The process of claim 5, wherein the separation between the plurality of fractures is from about 20 to about 50 meters.
Claim 8
Dependent Claim 38 words
The process of claim 1, where the injection and withdrawal wells are separated along their deviated portions by a distance slightly less than approximately twice that of the distance a singularly induced fracture will propagate within the formation.

References Cited (Backward Citations)

US2788956A Cited
US3228468A Cited
US3223158A Cited
US3285335A Cited
US3270816A Cited
US3637020A Cited
US3878884A Cited
US3835928A Cited
US3848674A Cited
US3863709A Cited
US4015663A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-09-23 1984-03-24 1984-09-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-09-23 1988-03-24 1988-09-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1991-09-23 1992-03-24 1992-09-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag