US4200624A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Combined hydrogen storage and production process
Assignee: Compagnie Francaise de Raffinage SA
•
Filing: 1978-10-25
•
Granted: 1980-04-29
•
Expires: 1998-10-25
Abstract
Abstract In a combined process for the storage and production of hydrogen from a hydrogen reserve containing magnesium in the free or combined state, said process consisting of storing the hydrogen in the supply, decomposing the supply to produce hydrogen, and reconstituting the supply of hydrogenation; the use of a dope comprising two elements in the free or combined state selected from the group consisting of cerium, nickel, titanium and molybdenum. Said process may be applied to hydrogen reserves used to fuel internal-combustion engines and for similar applications.
Inventors
- 👤 Alain Muller
- 👤 Philippe Engelhard
- 👤 Joseph E. Weisang
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 00:06
CPC Classifications
C; C01; C01B; C01B3/00; C01B3/0005; C01B3/001; C01B3/0018; C01B3/0026; C01B3/0031; C01B3/0078; C01B6/00; C01B6/04; F; F17; F17C; F17C11/00; F17C11/005; Y; Y02; Y02E; Y02E60/00; Y02E60/30; Y02E60/32; Y02P; Y02P90/00; Y02P90/45; Y10; Y10S; Y10S420/00; Y10S420/90
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
65 words
In a combined process for the storage and production of hydrogen from a magnesium-containing hydrogen reserve by storing the hydrogen in the reserve by hydrogenation thereof, decomposing the reserve to produce hydrogen, and reconstituting the reserve by hydrogenation; the improvement comprising incorporating in said reserve from 1 to 99.9 wt. % of magnesium and a dope selected from the group consisting of titanium-nickel, and titanium-molybdenum.
Claim 2
Dependent Claim
65 words
In a combined process for the storage and production of hydrogen from a magnesium-containing hydrogen reserve by storing the hydrogen in the reserve by hydrogenation thereof, decomposing the reserve to produce hydrogen, and reconstituting the reserve by hydrogenation; the improvement comprising incorporating in said reserve from 1 to 99.9 wt. % of magnesium and a dope selected from the group consisting of titanium-nickel, and titanium-molybdenum.
Claim 3
Dependent Claim
13 words
Process in accordance with claim 1, wherein the dope is titanium and nickel.
Claim 4
Dependent Claim
31 words
Process in accordance with claim 2, wherein they hydrogen reserve is formed and reconstituted at a temperature between 150° and 380° C. and at a pressure between 10 and 100 bars.
Claim 5
Dependent Claim
13 words
Process in accordance with claim 1, wherein the dope is titanium and molybdenum.
Claim 6
Dependent Claim
31 words
Process in accordance with claim 4, wherein the hydrogen reserve is formed and reconstituted at a temperature between 150° and 380° C. and at a pressure between 10 and 100 bars.
Claim 7
Dependent Claim
18 words
Process in accordance with claim 1, wherein the reserve contains from 54 to 99.9 wt. % of magnesium.
Claim 8
Dependent Claim
31 words
Process in accordance with claim 6, wherein the hydrogen reserve is formed and reconstituted at a temperature between 20° and 500° C. and at a pressure between 0.1 and 200 bars.
Claim 9
Dependent Claim
30 words
Process in accordance with claim 7, wherein the hydrogen reserve is decomposed at a temperature comprised between 100° and 500° C. and at a pressure between 0.1 and 150 bars.
Claim 10
Dependent Claim
31 words
Process in accordance with claim 1, wherein the hydrogen reserve is formed and reconstituted at a temperature between 150° and 380° C. and at a pressure between 10 and 100 bars.
Claim 11
Dependent Claim
33 words
Process in accordance with claims 9, 3, or 5 wherein the hydrogen reserve is decomposed at a temperature comprised between 150° and 380° C. and at a pressure between 1 and 10 bars.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-04-29 | 1983-10-29 | 1984-04-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-04-29 | 1987-10-29 | 1988-04-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-04-29 | 1991-10-29 | 1992-04-29 | $7700.00 | Window Closed / Lapsed |