Tube bundle removal method and apparatus

Assignee: Westinghouse Electric Co LLC
•
Filing: 1978-05-01
•
Granted: 1980-04-29
•
Expires: 1998-05-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method and apparatus for removing the tube bundle from a steam generator disposed in a nuclear steam power plant while preserving an environment seal between the inside of the generator and the containment vessel. The tube bundle severed from the tubesheet is withdrawn upwardly into a multi-section crane including metal cask placed over an opened upper end of the steam generator shell. Removal of the bundle-containing cask is effectuated by the plant's radius crane and the cask lowered onto a metal cover plate made secure to the bottom of the cask. By a series of manipulations by the cask and radius cranes and use of tube and wrapper cutting equipment, length sections of the tube bundle and its wrapper can be contained in respective sequentially-separated top-and-bottom covered cask length sections for removal from the containment vessel.

Inventors

  • 👤 Robert E. Meuschke
  • 👤 Robert W. Beer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 11:38
CPC Classifications
F; F28; F28D; F28D7/00; F28D7/06; B; B23; B23P; B23P19/00; B23P19/02; B23P19/022; B23P19/024; F22; F22B; F22B37/00; F22B37/002; F22B37/02; F22B37/58; G; G21; G21D; G21D1/00; G21D1/02; G21F; G21F9/00; G21F9/28; F28F; F28F2280/00; F28F2280/02; Y; Y02; Y02E; Y02E30/00; Y02E30/30; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/4935; Y10T29/49352; Y10T29/49815; Y10T29/49819; Y10T29/49822; Y10T29/53; Y10T29/53113

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 197 words
Method of removal of a tube bundle from an opened-top vertical cylindrical shell of a steam generator, comprising the steps of, placing an open-bottom hollow cask assembly onto the upper open end of said shell in coaxial extension upwardly therefrom, said cask assembly being reinforced longitudinally, having a tube-bundle-lifting crane means at its upper end, and having multiple longitudinal sections interconnected by removable means, effecting coupling of said crane means to the tube bundle within said shell and lifting of such bundle into said cask assembly after such bundle has been separated from the generator's tubesheet, lifting the tube-bundle-containing cask assembly from such shell and lowering same onto a bottom cover member at a nearby support deck site, effecting cutoff of a lower portion of said tube bundle for disposition within the lowermost longitudinal section of said cask means, disconnecting and lifting the remaining tube-bundle-containing cask means free of the lowermost cask section and placing such remaining cask means on a respective bottom cover member, repeating the preceding cutoff and lifting steps until the entire tube bundle is disposed in respective longitudinal sections of said cask means, and adding top cover members to the tube-bundle-section-containing cask sections.
Claim 2
Dependent Claim 197 words
Method of removal of a tube bundle from an opened-top vertical cylindrical shell of a steam generator, comprising the steps of, placing an open-bottom hollow cask assembly onto the upper open end of said shell in coaxial extension upwardly therefrom, said cask assembly being reinforced longitudinally, having a tube-bundle-lifting crane means at its upper end, and having multiple longitudinal sections interconnected by removable means, effecting coupling of said crane means to the tube bundle within said shell and lifting of such bundle into said cask assembly after such bundle has been separated from the generator's tubesheet, lifting the tube-bundle-containing cask assembly from such shell and lowering same onto a bottom cover member at a nearby support deck site, effecting cutoff of a lower portion of said tube bundle for disposition within the lowermost longitudinal section of said cask means, disconnecting and lifting the remaining tube-bundle-containing cask means free of the lowermost cask section and placing such remaining cask means on a respective bottom cover member, repeating the preceding cutoff and lifting steps until the entire tube bundle is disposed in respective longitudinal sections of said cask means, and adding top cover members to the tube-bundle-section-containing cask sections.
Claim 3
Dependent Claim 29 words
The method of claim 1, further including the steps of securing the top and bottom cover members to the respective tube-bundle-section-containing cask sections and removing same from the site.
Claim 4
Dependent Claim 20 words
The method of claim 1, including the cutoff and storage of lengths of a cylindrical wrapper encircling said tube bundle.
Claim 5
Dependent Claim 34 words
The method of claim 1, wherein the method is performed within the containment vessel of a nuclear power plant and a polar crane therein is used for lifting said cask means and its contents.

References Cited (Backward Citations)

US3857158A Cited
US4125928A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-04-29 1983-10-29 1984-04-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-04-29 1987-10-29 1988-04-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1991-04-29 1991-10-29 1992-04-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag