Claims Analysis
Total Claims: 24
Claim 1
Independent Claim
206 words
Method for optimizing rate of penetration of a drill within a given medium based upon the drilling parameters of revolutions of the drill per given time period and the thrust applied to the drill parallel to the direction of penetration, said method comprising: applying a given preset start-up value for each drilling parameter to the drill; monitoring the rate of penetration of the drill into such medium based upon the two parametric values being input into the drill; applying incremental changes in the value of one of the drilling parameters to the drill, while keeping the other parameter value constant, until the penetration rate of the drill into such medium as monitored is maximized for such one parameter being incrementally changed; applying incremental changes in the value of the other of the drilling parameters to the drill, while keeping the first parameter value constant, until the penetration rate as monitored is maximized for such second parameter being changed; and continually alternatively applying incremental changes in the value of one of the drilling parameters to the drill while keeping the remaining parameter value constant until a maximized penetration rate as monitored is realized for the parameter being changed based upon prior changes made to the other parameter.
Claim 2
Dependent Claim
206 words
Method for optimizing rate of penetration of a drill within a given medium based upon the drilling parameters of revolutions of the drill per given time period and the thrust applied to the drill parallel to the direction of penetration, said method comprising: applying a given preset start-up value for each drilling parameter to the drill; monitoring the rate of penetration of the drill into such medium based upon the two parametric values being input into the drill; applying incremental changes in the value of one of the drilling parameters to the drill, while keeping the other parameter value constant, until the penetration rate of the drill into such medium as monitored is maximized for such one parameter being incrementally changed; applying incremental changes in the value of the other of the drilling parameters to the drill, while keeping the first parameter value constant, until the penetration rate as monitored is maximized for such second parameter being changed; and continually alternatively applying incremental changes in the value of one of the drilling parameters to the drill while keeping the remaining parameter value constant until a maximized penetration rate as monitored is realized for the parameter being changed based upon prior changes made to the other parameter.
Claim 3
Dependent Claim
27 words
The method according to claim 1 wherein the incremental changes effected in the value of one parameter are made independent of the value of the other parameter.
Claim 4
Dependent Claim
59 words
The method according to claim 1 wherein the step of monitoring the rate of penetration of the drill into the medium includes a deadband area of insensitivity for the monitoring of the penetration rate which precludes additional incremental changes in the parameter values due to minor instabilities which occur as a result of the nonlinear process dynamics of drilling.
Claim 5
Dependent Claim
34 words
The method according to claim 1 wherein the incremental changes made to the thrust values are equal to ±100 psi and the incremental changes made to the RPM parameter are equal to ±50 RPM.
Claim 6
Dependent Claim
56 words
The method according to claim 1 wherein the method further includes the step of waiting a given time period between incremental changes in the values of the two drilling parameters before commencing yet another incremental change in order to permit stabilization of the drilling procedure and in order to compensate for response time of the system.
Claim 7
Dependent Claim
14 words
The method according to claim 5 wherein the period of waiting is five seconds.
Claim 8
Dependent Claim
34 words
The method according to claim 1 wherein the step of applying incremental changes in the value of one parameter may include increases as well as decreases in the value of the parameter being changed.
Claim 9
Dependent Claim
71 words
The method according to claim 7 wherein incremental changes made in the value of one parameter are made in a direction to increase the rate of penetration until the monitored rate of penetration ceases to increase correspondingly, the incremental changes then being reversed or the parameter value being held constant until a maximum monitored penetration rate stabilizes at a relative maximum for the two parameter values being input into the drill.
Claim 10
Dependent Claim
47 words
The method according to claim 1 wherein the method further includes the step of periodically reading torque pressure to the drill and automatically overriding the last parameter incremental change when the change in torque is greater than a given preset value for preventing damage to the drill.
Claim 11
Dependent Claim
16 words
The method according to claim 9 wherein the given preset start up value is 300 psi/sec.
Claim 12
Independent Claim
218 words
A method for drilling and automatically searching for an optimized rate of penetration of a drill within a given medium, based upon a first drilling parameters of drill speed and a second drilling parameter of thrust, for maximizing the efficiency of energy transfer from the drilling equipment to the drill/medium interface, said method comprising: progressing the drill into the medium until the drill is collared; applying a given preset start-up value for each drilling parameter to the drill; monitoring the rate of penetration of the drill into such medium based upon the two parametric values being input into the drill; applying automatic incremental changes in the value of the first of the drilling parameters to the drill while keeping the second parameter value constant until the penetration rate is maximized for such one parameter being incrementally changed; applying automatic incremental changes in the value of the second drilling parameter to the drill, while keeping the first parameter value constant, until the penetration rate is maximized for such second parameter being changed; and continually alternatively applying automatic incremental changes in the value of one of the drilling parameters to the drill while keeping the remaining parameter value constant until a maximized penetration rate is realized for the parameter being changed based upon prior changes made to the other parameter.
Claim 13
Independent Claim
218 words
A method for drilling and automatically searching for an optimized rate of penetration of a drill within a given medium, based upon a first drilling parameters of drill speed and a second drilling parameter of thrust, for maximizing the efficiency of energy transfer from the drilling equipment to the drill/medium interface, said method comprising: progressing the drill into the medium until the drill is collared; applying a given preset start-up value for each drilling parameter to the drill; monitoring the rate of penetration of the drill into such medium based upon the two parametric values being input into the drill; applying automatic incremental changes in the value of the first of the drilling parameters to the drill while keeping the second parameter value constant until the penetration rate is maximized for such one parameter being incrementally changed; applying automatic incremental changes in the value of the second drilling parameter to the drill, while keeping the first parameter value constant, until the penetration rate is maximized for such second parameter being changed; and continually alternatively applying automatic incremental changes in the value of one of the drilling parameters to the drill while keeping the remaining parameter value constant until a maximized penetration rate is realized for the parameter being changed based upon prior changes made to the other parameter.
Claim 14
Dependent Claim
27 words
The method according to claim 11 wherein the incremental changes efforted in the value of one parameter are made independent of the value of the other parameter.
Claim 15
Dependent Claim
62 words
The method according to claim 11 wherein the step of calculating monitoring the rate of penetration of the drill into the medium includes providing for a deadband area of insensitivity for the monitoring of the penetration rate which precludes additional incremental changes in the parameter values due to minor instabilities which occur as a result of the nonlinear process dynamics of drilling.
Claim 16
Dependent Claim
34 words
The method according to claim 11 wherein the incremental changes made to the thrust values are equal to ±100 psi and the incremental changes made to the RPM parameter are equal to ±50 RPM.
Claim 17
Dependent Claim
23 words
The method according to claim 11 wherein the progression of the drill into the medium until the drill is collared is achieved automatically.
Claim 18
Dependent Claim
23 words
The method according to claim 11 wherein the progression of the drill into the medium until the drill is collared is achieved manually.
Claim 19
Dependent Claim
59 words
The method according to claim 11 wherein the method further includes the step of automatically waiting a given time period between incremental changes in the values of the two drilling parameters before commencing yet another automatic incremental change in order to permit stabilization of the drilling procedure and in order to compensate for the response time of the system.
Claim 20
Dependent Claim
14 words
The method according to claim 17 wherein the period of waiting is five seconds.
Claim 21
Dependent Claim
34 words
The method according to claim 11 wherein the step of applying incremental changes in the value of one parameter may include increases as well as decreases in the value of the parameter being changed.
Claim 22
Dependent Claim
71 words
The method according to claim 19 wherein incremental changes made in the value of one parameter are made in a direction to increase the rate of penetration until the monitored rate of penetration ceases to increase correspondingly, the incremental changes then being reversed or the parameter value being held constant until the maximum monitored penetration rate stabilizes at a relative maximum for the two parameter values being input into the drill.
Claim 23
Dependent Claim
47 words
The method according to claim 11 wherein the method further includes the step of periodically reading torque pressure to the drill and automatically overriding the last parameter incremental change when the change in torque is greater than a given preset value for preventing damage to the drill.
Claim 24
Dependent Claim
16 words
The method according to claim 21 wherein the given preset value start up is 300 psi/sec.