← Back to Patent Explorer
US4194574A Expired / Lapsed US ⏱️ 0.0 years remaining

Draft power sensor and method for improving performance in earthmoving equipment

Assignee: Southwest Research Institute
•
Filing: 1977-09-13
•
Granted: 1980-03-25
•
Expires: 1997-09-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A draft power sensor is shown which is capable of determining the amount of power being applied to the soil in earthmoving equipment. The effective draft force and the true ground speed of the earthmoving equipment are measured. This information is processed electronically to provide the product of the two values, which is the draft power. Production from earthmoving equipment can be maximized if the highest value of the draft power is maintained.

Inventors

  • 👤 Harvey S. Benson
  • 👤 Charles D. Wood, III

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 20:12
CPC Classifications
G; G01; G01L; G01L3/00; G01L3/24; G01L3/247; E; E02; E02F; E02F3/00; E02F3/04; E02F3/76; E02F9/00; E02F9/20; E02F9/2025; E02F9/2029

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 76 words
Apparatus for determining the draft power of earth-moving equipment, said apparatus comprising: (a) a detecting means to measure the true ground speed of said earthmoving equipment; (b) detecting means to measure the draft force applied to the soil by said earthmoving equipment; (c) means for processing information obtained from said detecting means to measure true ground speed and information obtained from said detecting means to measure draft force, to derive a product which is draft power.
Claim 2
Dependent Claim 76 words
Apparatus for determining the draft power of earth-moving equipment, said apparatus comprising: (a) a detecting means to measure the true ground speed of said earthmoving equipment; (b) detecting means to measure the draft force applied to the soil by said earthmoving equipment; (c) means for processing information obtained from said detecting means to measure true ground speed and information obtained from said detecting means to measure draft force, to derive a product which is draft power.
Claim 3
Dependent Claim 53 words
The apparatus of claim 1 wherein the detecting means to determine the true ground speed of said earthmoving equipment includes means to detect the doppler frequency shift of a signal where said doppler frequency shift is caused by the motion of said earthmoving equipment relative to the surface over which it is moving.
Claim 4
Dependent Claim 26 words
The apparatus of claim 1 wherein the detecting means to measure the draft force applied to the soil by said earthmoving equipment includes a strain gauge.
Claim 5
Dependent Claim 23 words
The apparatus of claim 1 further including means to provide the operator of said earthmoving equipment with an indication of said draft power.
Claim 6
Dependent Claim 26 words
The apparatus of claim 4 wherein the means to provide the operator of said earthmoving equipment with an indication of said draft power includes aural means.
Claim 7
Dependent Claim 26 words
The apparatus of claim 4 wherein the means to provide the operator of said earthmoving equipment with an indication of said draft power includes visual means.
Claim 8
Independent Claim 55 words
A method for determining the draft power of earthmoving equipment comprising the steps of (a) measuring the true ground speed of said earthmoving equipment; (b) measuring the draft force applied by said earthmoving equipment (c) processing the measured value of said true ground speed and the value of said draft force to obtain draft power.
Claim 9
Independent Claim 55 words
A method for determining the draft power of earthmoving equipment comprising the steps of (a) measuring the true ground speed of said earthmoving equipment; (b) measuring the draft force applied by said earthmoving equipment (c) processing the measured value of said true ground speed and the value of said draft force to obtain draft power.
Claim 10
Dependent Claim 21 words
The method of claim 7 including the additional step of displaying the draft power to the operator of said earthmoving equipment.
Claim 11
Dependent Claim 48 words
The method of claim 7 wherein the true ground speed of said earthmoving equipment is measured by determining the doppler frequency shift of a signal where said doppler frequency shift is caused by the motion of said earthmoving equipment relative to the surface over which it is moving.
Claim 12
Dependent Claim 15 words
The method of claim 7 wherein said draft force is measured by a strain gauge.
Claim 13
Dependent Claim 34 words
The method of claim 7 wherein said processing includes multiplying the measured value of the true ground speed and the measured value of the draft force to obtain a product which is draft power.

References Cited (Backward Citations)

US2654301A Cited
US2585605A Cited
US2605393A Cited
US3094693A Cited
US3246701A Cited
US3716104A Cited
US3686941A Cited
US3803574A Cited
DE2508620A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-03-25 1983-09-24 1984-03-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-03-25 1987-09-24 1988-03-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1991-03-25 1991-09-24 1992-03-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag