Abstract

Abstract Power demand control on a plant having a plurality of load units of production, each operating between a starting time and an ending time to provide individual production outputs, is exercised by automatically shedding or restoring such load units in order to maintain power demand within an assigned demand limit. The control system provides adaptive priority determination by storing an image of the ON, or OFF, status of the load units into at least two memories (memory I and memory II) on a last ON, first OFF basis for the loads to be shed, and on a last OFF, first ON basis for the loads to be restored. Loads that are ON are stored in a first (ON) memory (memory I); loads that are being held OFF by the controller are stored in a second (DCOFF) memory (memory III). Also provided is a third memory (OFF) (memory II) to store the status of load units which are out of production and under independent control either after ending production or while being made ready to start production. Such independent control is interfaced with automatic power demand control by storing OFF status load units that were under independent controls but are now available for processing production into the second memory at the lowest priority and those having ended production being stored into the third memory at the highest priority. Load units which change status under power demand control to minimize demand error have their status locations in the first and second memory exchanged in preparation of subsequent automatic demand control during the demand control period. The load position in the first and second memories may be modified by the controller operators to enhance the probability of a given load turning ON or staying ON.

Inventors

  • 👤 II Woodward C. Carter

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 22:39
CPC Classifications
G; G01; G01R; G01R21/00; G01R21/133; G01R21/1333; H; H02; H02J; H02J3/00; H02J3/17; H02J2105/00; H02J2105/50; H02J2105/52; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 274 words
A method of controlling the interruptible loads of a plant facility with a power demand controller assigning a demand limit to energy consumption, where said plant facility includes as said interruptible loads at least two load units of production having when operative a changing characteristic of power consumption from an individual starting time to an individual end time to provide respective production outputs; with said method comprising the steps of: deriving a representation of the total amount of energy accumulated by said plant facility during a control period and of the current power drawn in said plant for predicting a demand at the end of said control period; relating said predicted demand to said assigned demand limit for providing a demand error relative to said demand limit at the end of the control period; selecting loads for switching into one of an ON and an OFF status according to a priority list based on one of the actual ON and OFF status of said loads and the individual power consumption thereof and according to said demand error to minimize the same; switching a selected load and changing one of the actual ON and OFF status thereof in said priority list; measuring the individual power consumption of each of said operative load units; associating the measured individual power consumption with a corresponding operative load unit in said priority list; and assigning a first priority in said priority list among said operative load units to the one having been switched the last in said load switching step, whereby in said load selecting step the first priority operative load unit is selected before another operative load unit.
Claim 2
Independent Claim 274 words
A method of controlling the interruptible loads of a plant facility with a power demand controller assigning a demand limit to energy consumption, where said plant facility includes as said interruptible loads at least two load units of production having when operative a changing characteristic of power consumption from an individual starting time to an individual end time to provide respective production outputs; with said method comprising the steps of: deriving a representation of the total amount of energy accumulated by said plant facility during a control period and of the current power drawn in said plant for predicting a demand at the end of said control period; relating said predicted demand to said assigned demand limit for providing a demand error relative to said demand limit at the end of the control period; selecting loads for switching into one of an ON and an OFF status according to a priority list based on one of the actual ON and OFF status of said loads and the individual power consumption thereof and according to said demand error to minimize the same; switching a selected load and changing one of the actual ON and OFF status thereof in said priority list; measuring the individual power consumption of each of said operative load units; associating the measured individual power consumption with a corresponding operative load unit in said priority list; and assigning a first priority in said priority list among said operative load units to the one having been switched the last in said load switching step, whereby in said load selecting step the first priority operative load unit is selected before another operative load unit.
Claim 3
Dependent Claim 20 words
The method of claim 1 with the last ON of said operative load units being first to be switched OFF.
Claim 4
Dependent Claim 20 words
The method of claim 1 with the last OFF of said operative load units being first to be switched ON.
Claim 5
Dependent Claim 69 words
The method of claim 1 with additional load units existing in said plant facility which are out of production, and each providing an availability signal when ready to enter production; with any said additional load units having an availability signal being added to said priority list; with said selecting step being inoperative on such listed additional load unit until all the operative load units are in the ON status.
Claim 6
Dependent Claim 52 words
The method of claim 4 with an operative load unit becoming an additional unit when its end time has been reached, a no selection signal being generated concurrently to prevent further selection by said selecting step; said no selection signal being overriden by an availability signal occurring when ready to enter production.
Claim 7
Dependent Claim 42 words
The method of claim 1 with a protective status being assigned to an operative load in the OFF status by giving it a priority position in said priority list that precedes an operative load which has been last to be switched OFF.
Claim 8
Dependent Claim 42 words
The method of claim 1 with a protective status being assigned to an operative load in the ON status by giving it a position in said priority list that follows an operative load which has been the first to be switched ON.

References Cited (Backward Citations)

US3296452A Cited
US3522421A Cited
US3652838A Cited
US3659114A Cited
US3697768A Cited
US3862430A Cited
US3987398A Cited
US4023043A Cited
US4034233A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-12-31 1983-07-02 1984-01-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-12-31 1987-07-02 1988-01-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-12-31 1991-07-02 1992-01-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag