Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
274 words
A method of controlling the interruptible loads of a plant facility with a power demand controller assigning a demand limit to energy consumption, where said plant facility includes as said interruptible loads at least two load units of production having when operative a changing characteristic of power consumption from an individual starting time to an individual end time to provide respective production outputs; with said method comprising the steps of: deriving a representation of the total amount of energy accumulated by said plant facility during a control period and of the current power drawn in said plant for predicting a demand at the end of said control period; relating said predicted demand to said assigned demand limit for providing a demand error relative to said demand limit at the end of the control period; selecting loads for switching into one of an ON and an OFF status according to a priority list based on one of the actual ON and OFF status of said loads and the individual power consumption thereof and according to said demand error to minimize the same; switching a selected load and changing one of the actual ON and OFF status thereof in said priority list; measuring the individual power consumption of each of said operative load units; associating the measured individual power consumption with a corresponding operative load unit in said priority list; and assigning a first priority in said priority list among said operative load units to the one having been switched the last in said load switching step, whereby in said load selecting step the first priority operative load unit is selected before another operative load unit.
Claim 2
Independent Claim
274 words
A method of controlling the interruptible loads of a plant facility with a power demand controller assigning a demand limit to energy consumption, where said plant facility includes as said interruptible loads at least two load units of production having when operative a changing characteristic of power consumption from an individual starting time to an individual end time to provide respective production outputs; with said method comprising the steps of: deriving a representation of the total amount of energy accumulated by said plant facility during a control period and of the current power drawn in said plant for predicting a demand at the end of said control period; relating said predicted demand to said assigned demand limit for providing a demand error relative to said demand limit at the end of the control period; selecting loads for switching into one of an ON and an OFF status according to a priority list based on one of the actual ON and OFF status of said loads and the individual power consumption thereof and according to said demand error to minimize the same; switching a selected load and changing one of the actual ON and OFF status thereof in said priority list; measuring the individual power consumption of each of said operative load units; associating the measured individual power consumption with a corresponding operative load unit in said priority list; and assigning a first priority in said priority list among said operative load units to the one having been switched the last in said load switching step, whereby in said load selecting step the first priority operative load unit is selected before another operative load unit.
Claim 3
Dependent Claim
20 words
The method of claim 1 with the last ON of said operative load units being first to be switched OFF.
Claim 4
Dependent Claim
20 words
The method of claim 1 with the last OFF of said operative load units being first to be switched ON.
Claim 5
Dependent Claim
69 words
The method of claim 1 with additional load units existing in said plant facility which are out of production, and each providing an availability signal when ready to enter production; with any said additional load units having an availability signal being added to said priority list; with said selecting step being inoperative on such listed additional load unit until all the operative load units are in the ON status.
Claim 6
Dependent Claim
52 words
The method of claim 4 with an operative load unit becoming an additional unit when its end time has been reached, a no selection signal being generated concurrently to prevent further selection by said selecting step; said no selection signal being overriden by an availability signal occurring when ready to enter production.
Claim 7
Dependent Claim
42 words
The method of claim 1 with a protective status being assigned to an operative load in the OFF status by giving it a priority position in said priority list that precedes an operative load which has been last to be switched OFF.
Claim 8
Dependent Claim
42 words
The method of claim 1 with a protective status being assigned to an operative load in the ON status by giving it a position in said priority list that follows an operative load which has been the first to be switched ON.