Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
221 words
Apparatus to control the rate of closure or separation and the landing site for cargo or personnel during transfer between first and second platforms while subject to vertical or lateral motion, one with respect to the other, said apparatus including the combination of: a constant tension winch on said first platform, said constant tension winch including means to establish a first constant tension level in the winch cable extending from said first platform, a variable constant tension winch on said second platform, said variable constant tension winch including means to establish second and third constant tension levels in the winch cable extending from said second platform, said second constant tension level being essentially less than said first constant tension level and said third constant tension level being essentially greater than said first constant tension level, engagement means to connect together the cables of said constant tension winch and said variable constant tension winch, carrier means coupled for movement by said cables while connected together by said engagement means, and control means operative to select one of said second and third constant tension levels for establishing the direction of movement of said carrier means between said first platform and said second platform by the relative tension differential between said first constant tension level and the selected second or third constant tension level.
Claim 2
Dependent Claim
221 words
Apparatus to control the rate of closure or separation and the landing site for cargo or personnel during transfer between first and second platforms while subject to vertical or lateral motion, one with respect to the other, said apparatus including the combination of: a constant tension winch on said first platform, said constant tension winch including means to establish a first constant tension level in the winch cable extending from said first platform, a variable constant tension winch on said second platform, said variable constant tension winch including means to establish second and third constant tension levels in the winch cable extending from said second platform, said second constant tension level being essentially less than said first constant tension level and said third constant tension level being essentially greater than said first constant tension level, engagement means to connect together the cables of said constant tension winch and said variable constant tension winch, carrier means coupled for movement by said cables while connected together by said engagement means, and control means operative to select one of said second and third constant tension levels for establishing the direction of movement of said carrier means between said first platform and said second platform by the relative tension differential between said first constant tension level and the selected second or third constant tension level.
Claim 3
Dependent Claim
49 words
The apparatus according to claim 1 wherein said means to establish a first constant tension level includes a control member to adjustably establish a predetermined constant tension level differential with respect to said second and third constant tension levels to provide a desired transfer rate of said carrier means.
Claim 4
Dependent Claim
37 words
The apparatus according to claim 2 wherein said predetermined constant tension level differential established by said control member maintains a take-up acceleration to said carrier means with respect to said second platform to a desired take-up velocity.
Claim 5
Dependent Claim
48 words
The apparatus according to claim 1 wherein said means to establish second and third constant tension levels include a control member to adjustably establish a predetermined constant tension level differential with respect to said first constant tension level to provide a desired transfer rate of said carrier means.
Claim 6
Dependent Claim
37 words
The apparatus according to claim 4 wherein said predetermined constant tension level differential established by said control member maintains a take-up velocity by said carrier means with respect to said second platform to a desired take-up velocity.
Claim 7
Dependent Claim
24 words
The apparatus according to claim 1 wherein said first platform includes a fixed offshore platform and said second platform is supported by a vessel.
Claim 8
Independent Claim
271 words
A method for controlling the rate of closure or separation and the landing site of a carrier for cargo or personnel during transfer from a lifting platform onto a landing platform while said platforms are subject one with respect to the other to vertical and/or lateral movement due to waves and/or wind within an envelope of motion, said method including the steps of: lowering said carrier by the cable of a lifting winch on said lifting platform to an elevation spaced above said landing platform to inhibit contact therewith while said platforms move one with respect to the other pursuant to said envelope of motion, coupling the cable of a downhaul winch on said landing platform to the cable of the lifting winch, eliminating slack in the coupled cables by energizing the downhaul winch while the carrier and landing plaftorms approach each other pursuant to said envelope of motion, energizing said lifting winch to impose a preestablished first constant tension level in the coupled cables to maintain the carrier at a fixed distance above the landing platform, said lifting winch at the preestablished first constant tension level having a wind-up velocity above a prescribed minimum take-up velocity precluding cable slack while said platforms move one with respect to the other pursuant to said envelope of motion, and energizing said downhaul winch to impose a preestablished second constant tension level greater than said first constant tension level and at a controllable wind-up speed on the coupled cables to move the carrier onto the landing platform at a desired rate of closure for landing and support of the carrier on the landing platform.
Claim 9
Independent Claim
271 words
A method for controlling the rate of closure or separation and the landing site of a carrier for cargo or personnel during transfer from a lifting platform onto a landing platform while said platforms are subject one with respect to the other to vertical and/or lateral movement due to waves and/or wind within an envelope of motion, said method including the steps of: lowering said carrier by the cable of a lifting winch on said lifting platform to an elevation spaced above said landing platform to inhibit contact therewith while said platforms move one with respect to the other pursuant to said envelope of motion, coupling the cable of a downhaul winch on said landing platform to the cable of the lifting winch, eliminating slack in the coupled cables by energizing the downhaul winch while the carrier and landing plaftorms approach each other pursuant to said envelope of motion, energizing said lifting winch to impose a preestablished first constant tension level in the coupled cables to maintain the carrier at a fixed distance above the landing platform, said lifting winch at the preestablished first constant tension level having a wind-up velocity above a prescribed minimum take-up velocity precluding cable slack while said platforms move one with respect to the other pursuant to said envelope of motion, and energizing said downhaul winch to impose a preestablished second constant tension level greater than said first constant tension level and at a controllable wind-up speed on the coupled cables to move the carrier onto the landing platform at a desired rate of closure for landing and support of the carrier on the landing platform.
Claim 10
Dependent Claim
32 words
The method according to claim 7 including the further step of positioning the landing platform and carrier into a vertically-aligned relation before said step of coupling the cable of a downhaul winch.
Claim 11
Dependent Claim
34 words
The method according to claim 8 including the further step of displacing the landing platform into a laterally-spaced location from said vertically-aligned relation with the carrier after said step of energizing said lifting winch.
Claim 12
Independent Claim
368 words
A method for controlling the rate of closure or separation and the landing site of a carrier for cargo or personnel during transfer from a landing platform onto a lifting platform while said platforms are subject one with respect to the other to vertical and/or lateral movement due to waves and/or wind within an envelope of motion, said method including the steps of: paying out the cable of a lifting winch on said lifting platform to an elevation for access thereto from said landing platform while said platforms move one with respect to the other pursuant to said envelope of motion, said lifting winch having means to preestablish a first constant tension level in the cable thereof, coupling the cable of a downhaul winch on said landing platform to the cable of the lifting winch, said downhaul winch having means to select one of preestablished second and third constant tension levels in the cable thereof, said second constant tension level being less than said first constant tension level and said third constant tension level being greater than said first constant tension level, imposing the said third constant tension level on the coupled cables by energizing the downhaul winch to maintain the carrier on the landing platform, eliminating slack in the coupled cables by energizing the lifting winch while the carrier and lifting platforms approach each other pursuant to said envelope of motion, energizing said lifting winch to impose the preestablished first constant tension level in the coupled cables to maintain the carrier on the landing platform through continued relative motion pursuant to said envelope of motion, said lifting winch at the preestablished first constant tension level having a wind-up velocity above a prescribed minimum take-up velocity precluding cable slack while said platforms move one with respect to the other, energizing said downhaul winch to impose said preestablished second constant tension level which is less than said first constant tension level and at a controllable wind-up speed on the coupled cables to move the carrier from the landing platform when the carrier recedes away from the lifting platform, and maintaining the cable take-up velocity by the lifting winch at a value exceeding the vertical relative motion between said platforms.
Claim 13
Independent Claim
368 words
A method for controlling the rate of closure or separation and the landing site of a carrier for cargo or personnel during transfer from a landing platform onto a lifting platform while said platforms are subject one with respect to the other to vertical and/or lateral movement due to waves and/or wind within an envelope of motion, said method including the steps of: paying out the cable of a lifting winch on said lifting platform to an elevation for access thereto from said landing platform while said platforms move one with respect to the other pursuant to said envelope of motion, said lifting winch having means to preestablish a first constant tension level in the cable thereof, coupling the cable of a downhaul winch on said landing platform to the cable of the lifting winch, said downhaul winch having means to select one of preestablished second and third constant tension levels in the cable thereof, said second constant tension level being less than said first constant tension level and said third constant tension level being greater than said first constant tension level, imposing the said third constant tension level on the coupled cables by energizing the downhaul winch to maintain the carrier on the landing platform, eliminating slack in the coupled cables by energizing the lifting winch while the carrier and lifting platforms approach each other pursuant to said envelope of motion, energizing said lifting winch to impose the preestablished first constant tension level in the coupled cables to maintain the carrier on the landing platform through continued relative motion pursuant to said envelope of motion, said lifting winch at the preestablished first constant tension level having a wind-up velocity above a prescribed minimum take-up velocity precluding cable slack while said platforms move one with respect to the other, energizing said downhaul winch to impose said preestablished second constant tension level which is less than said first constant tension level and at a controllable wind-up speed on the coupled cables to move the carrier from the landing platform when the carrier recedes away from the lifting platform, and maintaining the cable take-up velocity by the lifting winch at a value exceeding the vertical relative motion between said platforms.
Claim 14
Dependent Claim
35 words
The method according to claim 10 including the further step of displacing the platforms laterally with respect to each other after said step of energizing said lifting winch to the preestablished first constant tension level.
Claim 15
Dependent Claim
36 words
The method according to claim 10 including the further step of positioning said landing platform and said lifting winch cable into a vertically-aligned relation before said step of paying out the cable of a lifting winch.