Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
166 words
A method of reducing railroad track position errors comprising the steps of passing a measuring system over a section of the track, the measuring system having a first reference line extending between a first leading point and a first trailing point on the track, and measuring track position values relative to the measuring system at a series of points throughout the section; automatically summing and averaging the measured position values to obtain an average position value; passing track correcting means equipped with a track location sensing system through the same section of track, the track location sensing system having a second reference line extending between a second leading point and a second trailing point on the track, obtaining a track location value from the track location sensing system, comparing the track location value with the average position value to obtain a position error value and applying the position error value to control the operation of track position correcting means to reduce an existing track position error.
Claim 2
Independent Claim
166 words
A method of reducing railroad track position errors comprising the steps of passing a measuring system over a section of the track, the measuring system having a first reference line extending between a first leading point and a first trailing point on the track, and measuring track position values relative to the measuring system at a series of points throughout the section; automatically summing and averaging the measured position values to obtain an average position value; passing track correcting means equipped with a track location sensing system through the same section of track, the track location sensing system having a second reference line extending between a second leading point and a second trailing point on the track, obtaining a track location value from the track location sensing system, comparing the track location value with the average position value to obtain a position error value and applying the position error value to control the operation of track position correcting means to reduce an existing track position error.
Claim 3
Dependent Claim
42 words
A method as claimed in claim 1 which further comprises the step of re-measuring a track position value after the operation of the track position correcting means and re-summing and re-averaging the track position values to obtain a new average position value.
Claim 4
Dependent Claim
29 words
A method as claimed in claim 1 in which half of the points at which track position values are measured are on the corrected portion of the track section.
Claim 5
Dependent Claim
48 words
A method as claimed in claim 1 in which a running average position value is obtained by progressively dropping off the value obtained by the measuring system at a first sequential one of the series of points and adding on a new value obtained at a successive point.
Claim 6
Dependent Claim
47 words
A method as claimed in claim 4, in which a track location value is obtained from the track location sensing system at a second series of points on the section and the location value at each of these points is compared with the running average position value.
Claim 7
Dependent Claim
21 words
A method as claimed in claim 5 in which the first series of points and the second series of points coincide.
Claim 8
Dependent Claim
28 words
A method as claimed in claim 1 in which the track correcting means is passed over the track section immediately subsequently to the passing of the measuring system.
Claim 9
Dependent Claim
14 words
A method as claimed in claim 1, in which the chords overlap each other.
Claim 10
Dependent Claim
21 words
A method as claimed in claim 8 in which the first trailing point is located adjacent the track position correcting means.
Claim 11
Dependent Claim
33 words
A method as claimed in claim 9, in which the location at which the track location value is obtained is midway between the first and last points of the first series of points.
Claim 12
Independent Claim
245 words
An apparatus for reducing railroad track position errors comprising: a first measuring system having a leading point and a trailing point and means for establishing a reference line between said points; a measuring means located between said points for measuring a track position value relative to said reference line; means to move said first measuring system over a section of track for enabling said measuring means to measure a series of said track position values at a series of points extending over a specified distance along the track; means connected to said measuring means to store the series of track position values and to average them; a track correcting means attached to and trailing said first measuring system along the track; an independent track location sensing system for said track correcting means, which locating sensing system includes a leading point and a trailing point and means for establishing a second reference line between said lastmentioned points; sensor means located between the said points of the second reference line, for sensing a track location value relative to said second reference line; comparator means connected to said means to store and average the track position values and to said sensor means to compare said average position value with said location value and provide a position error value; and means connected to said comparator means for applying said position error value to control the operation of the track position correcting means to reduce an existing track position error.
Claim 13
Independent Claim
245 words
An apparatus for reducing railroad track position errors comprising: a first measuring system having a leading point and a trailing point and means for establishing a reference line between said points; a measuring means located between said points for measuring a track position value relative to said reference line; means to move said first measuring system over a section of track for enabling said measuring means to measure a series of said track position values at a series of points extending over a specified distance along the track; means connected to said measuring means to store the series of track position values and to average them; a track correcting means attached to and trailing said first measuring system along the track; an independent track location sensing system for said track correcting means, which locating sensing system includes a leading point and a trailing point and means for establishing a second reference line between said lastmentioned points; sensor means located between the said points of the second reference line, for sensing a track location value relative to said second reference line; comparator means connected to said means to store and average the track position values and to said sensor means to compare said average position value with said location value and provide a position error value; and means connected to said comparator means for applying said position error value to control the operation of the track position correcting means to reduce an existing track position error.
Claim 14
Dependent Claim
50 words
An apparatus as claimed in claim 6, wherein the first reference line is a chord extending between the leading and trailing points of the first measuring system and in which the second reference line is a chord extending between the leading and trailing points of the track location sensing system.
Claim 15
Dependent Claim
14 words
An apparatus as claimed in claim 6, in which the chords overlap each other.
Claim 16
Dependent Claim
23 words
Apparatus as claimed in claim 13, in which the trailing point of the first chord is located adjacent the track position correcting means.
Claim 17
Dependent Claim
41 words
Apparatus as claimed in claim 11, in which the measuring means is positioned remote from the leading and trailing points of the first chord and the sensor means is positioned remote from the leading and trailing points of the second chord.