Abstract

Abstract Portland cement concrete at a roadbed, bridge deck or the like is quickly and deeply heated and dried by directing microwave energy into the concrete and by applying hot gas to the surface. A layer of thermoplastic sealant is applied to the hot concrete followed by an overlayer of asphaltic concrete having a higher softening temperature than the sealant layer. Compaction then produces a composite pavement which is sealed against water intrusion and which can be quickly, easily and economically resealed and resurfaced at a later time using little or no additional paving materials. Resealing and resurfacing is accomplished by deeply reheating all three layers by microwave irradiation followed by recompaction. If cracking and deterioration are severe, the asphaltic concrete layer may be remixed and rescreeding between the reheating and recompaction steps. Both the initial production of the composite pavement and the restoration processes can be accomplished on a continuous process basis while traveling along the roadbed, bridge deck or the like.

Inventors

  • 👤 Morris R. Jeppson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 10:04
CPC Classifications
E; E01; E01C; E01C7/00; E01C7/08; E01C7/32; E01C7/35; E01C7/353; E01D; E01D19/00; E01D19/08; E01D19/083

Claims Analysis

Total Claims: 21
Claim 1
Independent Claim 114 words
A method for sealing cement concrete pavement comprising the steps: directing microwave energy into said cement concrete pavement to generate heat within sub-surface regions of said concrete pavement, applying a layer of thermoplastic sealant to the surface of said heated cement concrete pavement, said sealant being temporarily in a hot, at least semi-liquid condition while in contact with said heated cement concrete pavement, applying an overlayer of asphaltic concrete on said sealant layer, and compacting said overlayer of asphaltic concrete and said sealant layer against said concrete pavement while still in a heated condition to produce a sealed composite pavement which may be resealed at a later time by a repeated heating and recompaction.
Claim 2
Independent Claim 114 words
A method for sealing cement concrete pavement comprising the steps: directing microwave energy into said cement concrete pavement to generate heat within sub-surface regions of said concrete pavement, applying a layer of thermoplastic sealant to the surface of said heated cement concrete pavement, said sealant being temporarily in a hot, at least semi-liquid condition while in contact with said heated cement concrete pavement, applying an overlayer of asphaltic concrete on said sealant layer, and compacting said overlayer of asphaltic concrete and said sealant layer against said concrete pavement while still in a heated condition to produce a sealed composite pavement which may be resealed at a later time by a repeated heating and recompaction.
Claim 3
Dependent Claim 39 words
The method of claim 1 further comprising the step of directing hot gas to said surface of said cement concrete pavement prior to said application of said sealant layer thereto to supplement the heating effect of said microwave energy.
Claim 4
Dependent Claim 32 words
The method of claim 2 wherein said steps of directing microwave energy into said cement concrete pavement and directing hot gas to said surface thereof are at least in part performed simultaneously.
Claim 5
Dependent Claim 77 words
The method of claim 2 wherein said steps of directing microwave energy into said cement concrete pavement and of directing hot gas to said surface thereof are performed by pre-heating said cement concrete pavement with microwave energy followed by a period of said directing of hot gas to said surface of said cement concrete pavement, followed by further heating of said cement concrete pavement with additional microwave energy prior to said application of said sealant layer thereto.
Claim 6
Dependent Claim 50 words
The method of claim 2 comprising the further steps of producing said microwave energy with electrical power obtained by operating a motor-generator set which has a fuel-burning engine, and utilizing the exhaust gas of said engine as said hot gas which is applied to said surface of said cement concrete.
Claim 7
Dependent Claim 35 words
The method of claim 1 wherein said step of applying an overlayer of asphaltic concrete further comprises applying an asphaltic concrete overlayer having a softening temperature higher than the softening temperature of said sealant layer.
Claim 8
Dependent Claim 24 words
The method of claim 1 further comprising traveling along said cement concrete pavement while simultaneously performing each of said steps at successive portions thereof.
Claim 9
Dependent Claim 62 words
The method of claim 1 wherein said step of directing microwave energy into said cement concrete pavement further comprises heating said cement concrete pavement to a depth of at least about three inches (7 cm) to a temperature within the range from about 170° F. to about 284° F. (77° C. to 140° C.) prior to applying said thermoplastic sealant layer thereto.
Claim 10
Dependent Claim 57 words
The method of claim 1 further comprising the step of directing hot gas having a temperature within the range from about 150° F. to about 400° F. (66° C. to 204° C.) to said surface of said cement concrete pavement at least after initial microwave heating thereof and prior to said application of said sealant layer thereto.
Claim 11
Dependent Claim 47 words
The method of claim 9 further comprising applying said hot gas to said surface of said cement concrete pavement for a period from about 10 minutes to about 60 minutes after initiation of said microwave heating thereof and prior to said application of said sealant layer thereto.
Claim 12
Dependent Claim 139 words
The method of claim 1 further comprising the steps of pre-heating said cement concrete pavement to a depth of at least about three inches (7 cm) to a temperature within the range from about 110° F. to about 160° F. (43° C. to 71° C.) by directing microwave energy into said cement concrete pavement, directing hot gas having a temperature within the range from about 150° F. to about 400° F. (66° C. to 204° C.) to said surface of said cement concrete pavement after initiation of said pre-heating thereof and prior to said application of said sealant layer thereto, and further heating said cement concrete pavement with additional microwave energy to a temperature within the range from about 170° F. to about 284° F. (77° C. to 140° C.) prior to said application of said sealant layer thereto.
Claim 13
Dependent Claim 65 words
The method of claim 1 further comprising resealing and resetting said composite pavement after a period of time and after partial deterioration thereof by the steps comprising: redirecting microwave energy into said composite pavement to reheat said asphaltic concrete overlayer and said thermoplastic sealant layer and at least an upper portion of said cement concrete, and recompacting said composite pavement while in the reheated state.
Claim 14
Dependent Claim 29 words
The method of claim 12 comprising the further step of directing hot gas to the surface of said asphaltic concrete overlayer prior to said recompaction of said composite pavement.
Claim 15
Dependent Claim 57 words
The method of claim 12 wherein said step of redirecting microwave energy into said composite pavement further comprises heating said sealant layer and said asphaltic concrete overlayer and at least an upper portion of said cement concrete pavement to a temperature within the range from about 170° F. to about 284° F. (77° C. to 140° C.).
Claim 16
Dependent Claim 48 words
The method of claim 12 comprising the further steps of: remixing the constituents of said asphaltic concrete overlayer following said reheating with microwave energy and prior to said recompaction of said composite pavement, and screeding said remixed asphaltic concrete overlayer prior to said recompaction of said composite pavement.
Claim 17
Independent Claim 76 words
A method for resealing and resurfacing a deteriorated composite pavement which has a base layer of cement concrete, an intermediate layer of thermoplastic sealant material and an overlayer of asphaltic concrete comprising: directing microwave energy into said composite pavement to generate heat simultaneously within said asphaltic concrete overlayer and said thermoplastic sealant layer and at least an upper portion of said base layer of cement concrete, and recompacting said composite pavement while in the heated state.
Claim 18
Independent Claim 76 words
A method for resealing and resurfacing a deteriorated composite pavement which has a base layer of cement concrete, an intermediate layer of thermoplastic sealant material and an overlayer of asphaltic concrete comprising: directing microwave energy into said composite pavement to generate heat simultaneously within said asphaltic concrete overlayer and said thermoplastic sealant layer and at least an upper portion of said base layer of cement concrete, and recompacting said composite pavement while in the heated state.
Claim 19
Dependent Claim 29 words
The method of claim 16 comprising the further step of directing hot gas to the surface of said asphaltic concrete overlayer prior to said recompaction of said composite pavement.
Claim 20
Dependent Claim 57 words
The method of claim 16 wherein said step of directing microwave energy into said composite pavement further comprises heating said sealant layer and said asphaltic concrete overlayer and at least an upper portion of said cement concrete pavement to a temperature within the range from about 170° F. to about 284° F. (77° C. to 140° C.).
Claim 21
Dependent Claim 48 words
The method of claim 6 comprising the further steps of: remixing the constituents of said asphaltic concrete overlayer following said heating with microwave energy and prior to said recompaction of said composite pavement, and screeding said remixed asphaltic concrete overlayer prior to said recompaction of said composite pavement.

References Cited (Backward Citations)

US1247271A Cited
US1593320A Cited
US2044558A Cited
US2274517A Cited
US2254463A Cited
US2347233A Cited
US3025773A Cited
US3603221A Cited
US3874366A Cited
US3970404A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-11-26 1983-05-28 1983-11-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-11-26 1987-05-28 1987-11-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-11-26 1991-05-28 1991-11-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag