← Back to Patent Explorer
US4173519A Expired / Lapsed US ⏱️ 0.0 years remaining

Method, process, system, and apparatus for recovering metal values from ores

Assignee: COMSTOCK GOLD Inc PO BOX 6 BOULDER CITY NEVADA A CORP OF NEVADA
•
Filing: 1978-11-07
•
Granted: 1979-11-06
•
Expires: 1998-11-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method, process, system, and apparatus for recovering metal values such as gold and silver from ores. The process contemplates the prior separation, through appropriate apparatus, of primary slimes from the coarse fraction of ores and each fraction is processed separately and by particular methods most suitable for maximum economic recovery of metal values from each fraction. The coarse fraction materials are routed to constitute one leg of the method to a series of heap-leach piles that are processed in a totally distinct manner by a very low trickle (0.0002 gal/sq.ft./min) of required strength cyanide solution. Metal values are thereby obtained in solution high enough to pass direct to electro-winning cells by-passing expensive intermediate concentrating steps. The primary slime fraction of the ores is routed to constitute a second leg of the process to soak-leach tanks for extraction of metal values without agitation, or by agitation if required, by the carbon-in-pulp adsorption-desorption process with a low cyanide (1 lb. per ton) concentration. In a preferred form of the invention, as to the pregnant solution derived from the heap-leach process and the carbon desorption solution derived through the soak-leach process involving the primary slimes, both are routed to an electro-winning stage for metal values recovery. A sluice box can also be used within the system to provide for separate recovery of large gold particles.

Inventors

  • 👤 Trent J. Parker
  • 👤 Harmel A. Dawson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 17:30
CPC Classifications
C; C22; C22B; C22B3/00; C22B3/04; C22B1/00; C22B11/00; C22B11/08; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 78 words
A method of recovering metal values from mined ore, comprising the steps of: providing a quantity of said ore; separating from said ore quantity a majority of the slime material therein; processing the so-separated slime material in slime soak-leach tanks to recover metal values therefrom; separately processing a remainder of said ore quantity, from which said majority has been removed, in heap-leach piles to derive a pregnant liquor; and processing said pregnant liquor to derive metal values therefrom.
Claim 2
Independent Claim 78 words
A method of recovering metal values from mined ore, comprising the steps of: providing a quantity of said ore; separating from said ore quantity a majority of the slime material therein; processing the so-separated slime material in slime soak-leach tanks to recover metal values therefrom; separately processing a remainder of said ore quantity, from which said majority has been removed, in heap-leach piles to derive a pregnant liquor; and processing said pregnant liquor to derive metal values therefrom.
Claim 3
Independent Claim 77 words
A method of recovering metal values from mined ore, comprising the steps of: separating from said mined ore a majority of slime material contained therein; processing said slime material with a cyanide solution in a soak-leach tank to derive a useful product therefrom from which metal values can be recovered; and processing a remainder of said ore in a heap-leach pile process to derive a pregnant liquor that can be further processed to recover metal values therefrom.
Claim 4
Independent Claim 77 words
A method of recovering metal values from mined ore, comprising the steps of: separating from said mined ore a majority of slime material contained therein; processing said slime material with a cyanide solution in a soak-leach tank to derive a useful product therefrom from which metal values can be recovered; and processing a remainder of said ore in a heap-leach pile process to derive a pregnant liquor that can be further processed to recover metal values therefrom.
Claim 5
Dependent Claim 102 words
A process for recovering precious metal values from mined ore, comprising: wet-classifying some of said ore to separate out a majority of slime material in said ore, whereby to produce a slurry; subjecting said slurry to soak-leaching for producing a product that can be processed to recover metal values therefrom; collecting remaining ore from said wet-classifying step to allow the same to drain in a drain stock pile; and reconstituting said remaining ore into at least one heap-leach pile for subjection to cyanide solution percolation therethrough, whereby to derive a pregnant solution that can be further processed to recover metal values therefrom.
Claim 6
Dependent Claim 102 words
A process for recovering precious metal values from mined ore, comprising: wet-classifying some of said ore to separate out a majority of slime material in said ore, whereby to produce a slurry; subjecting said slurry to soak-leaching for producing a product that can be processed to recover metal values therefrom; collecting remaining ore from said wet-classifying step to allow the same to drain in a drain stock pile; and reconstituting said remaining ore into at least one heap-leach pile for subjection to cyanide solution percolation therethrough, whereby to derive a pregnant solution that can be further processed to recover metal values therefrom.
Claim 7
Dependent Claim 38 words
The process of claim 3 wherein, before said wet-classifying step there is provided an initial step of reducing said ore to crushed material, and depositing at least a portion of said crushed material onto said drain stock pile.
Claim 8
Independent Claim 69 words
A method for recovering at least one precious metal from crushed ores, comprising the steps of separating out and separately processing a majority of slime materials from said ores to produce a soak-leaching product whereby to recover precious metal values therefrom; and heap-leaching a remainder of said ores, from which said majority has been separated, whereby to derive a pregnant liquor from which precious metal values can be recovered.
Claim 9
Independent Claim 69 words
A method for recovering at least one precious metal from crushed ores, comprising the steps of separating out and separately processing a majority of slime materials from said ores to produce a soak-leaching product whereby to recover precious metal values therefrom; and heap-leaching a remainder of said ores, from which said majority has been separated, whereby to derive a pregnant liquor from which precious metal values can be recovered.
Claim 10
Dependent Claim 24 words
The method of claim 5 wherein there is included the final step of alternately and separately electro-winning said pregnant liquor and said soak-leaching product.
Claim 11
Independent Claim 70 words
A method of recovering at least one metal value from crushed ore, comprising the steps of: removing a majority of slime materials from said ore; building a heap-leach pile from a remainder of said ore not including the so-removed materials; leaching said metal value from said heap-leach pile with a leaching solution applied to said pile at the rate of from 0.005 down to 0.0002 gal/sq. ft. pile surface area/min.
Claim 12
Independent Claim 70 words
A method of recovering at least one metal value from crushed ore, comprising the steps of: removing a majority of slime materials from said ore; building a heap-leach pile from a remainder of said ore not including the so-removed materials; leaching said metal value from said heap-leach pile with a leaching solution applied to said pile at the rate of from 0.005 down to 0.0002 gal/sq. ft. pile surface area/min.
Claim 13
Dependent Claim 12 words
The method of claim 7 wherein said leaching solution is intermittently applied.
Claim 14
Dependent Claim 31 words
The method of claim 7 wherein said leaching solution comprises an aqueous cyanide solution having therein one of a class of cyanide salts comprising sodium cyanide, potassium cyanide, and calcium cyanide.
Claim 15
Dependent Claim 92 words
Apparatus for recovering metal values from mined ore, including, in combination: first means for producing ore material; second means operatively disposed with respect to said first means for receiving said material to separately produce two ore-material streams, a first of slime material and a second of essentially deslimed material; third, slime soak-leach tank means for receiving, from said second means, and processing said slime material to derive metal values therefrom in one process; fourth, heap-leach means for receiving and processing said deslimed material in a second process to derive metal values therefrom.
Claim 16
Dependent Claim 92 words
Apparatus for recovering metal values from mined ore, including, in combination: first means for producing ore material; second means operatively disposed with respect to said first means for receiving said material to separately produce two ore-material streams, a first of slime material and a second of essentially deslimed material; third, slime soak-leach tank means for receiving, from said second means, and processing said slime material to derive metal values therefrom in one process; fourth, heap-leach means for receiving and processing said deslimed material in a second process to derive metal values therefrom.
Claim 17
Dependent Claim 28 words
Apparatus according to claim 10 wherein said third and fourth means have a common, electro-winning stage for alternately receiving products derived in said third and fourth means respectively.
Claim 18
Dependent Claim 157 words
Apparatus for recovering precious metal values from crushed ores, including, in combination: first means for receiving crushed ore and for separating out a majority of fines materials; second, wet-classifier means operatively disposed with respect to said first means and receiving said fines materials therefrom for separating therefrom as a first slurry a majority of slime materials; soak-leach means including a thickener operably disposed with respect to said second means and receiving said slime materials therefrom for producing an output, second slurry; means for processing said second slurry, whereby to recover precious-metal values therefrom; means operably disposed with respect to said wet-classifier means for routing oversized material therefrom to a drain stock pile; means for routing a remainder of said ores also to said drain stock pile; means for constituting at least one heap-leach pile from said drain stock pile; and means for deriving a pregnant liquor from said heap-leach pile whereby to derive precious metal values therefrom.
Claim 19
Dependent Claim 157 words
Apparatus for recovering precious metal values from crushed ores, including, in combination: first means for receiving crushed ore and for separating out a majority of fines materials; second, wet-classifier means operatively disposed with respect to said first means and receiving said fines materials therefrom for separating therefrom as a first slurry a majority of slime materials; soak-leach means including a thickener operably disposed with respect to said second means and receiving said slime materials therefrom for producing an output, second slurry; means for processing said second slurry, whereby to recover precious-metal values therefrom; means operably disposed with respect to said wet-classifier means for routing oversized material therefrom to a drain stock pile; means for routing a remainder of said ores also to said drain stock pile; means for constituting at least one heap-leach pile from said drain stock pile; and means for deriving a pregnant liquor from said heap-leach pile whereby to derive precious metal values therefrom.
Claim 20
Dependent Claim 26 words
Structure according to claim 12 wherein said apparatus includes sluice box means operably interposed between said first and second means for recovering large-sized precious metal values.

References Cited (Backward Citations)

US2067014A Cited
US2293066A Cited
US3357823A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-11-05 1983-05-07 1983-11-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-11-05 1987-05-07 1987-11-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-11-05 1991-05-07 1991-11-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag