← Back to Patent Explorer
US4170896A Expired / Lapsed US ⏱️ 0.0 years remaining

Balancing of high-speed shafts

Assignee: Boeing Co
•
Filing: 1978-03-20
•
Granted: 1979-10-16
•
Expires: 1998-03-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In some helicopters power is transmitted from a gearbox adjacent the engine to the tail rotor by a long shaft. To minimize weight, a tubular shaft is used, which rotates at supercritical speeds. Vibrations resulting from shaft unbalance are magnified by resonance as the shaft passes through its critical speeds making it essential that the shaft be finely balanced. This is accomplished by slowly rotating the shaft about its axis while measuring at a chosen station along its length both the wall thickness of the tubular shaft and the distance from a fixed reference plane to the outer surface of the shaft. From these data are determined the local cross sectional area and the location of the center of gravity at the chosen station. From the latter two quantities are determined both the amount of counterweight required and its required angular location around the shaft, for the chosen station. The measurements are repeated at a large number of stations along the shaft. Self-adhering aluminum tape is used as the counterweight, which is applied to the outer surface of the shaft in a continuous manner along its length. The number of layers of tape and their width determine the amount of weight applied. It is assumed that the variation in mass density of the shaft is negligible.

Inventors

  • 👤 Gregory J. Korkosz

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 08:28
CPC Classifications
G; G01; G01M; G01M1/00; G01M1/14; G01M1/16; G01M1/24; G01M1/30; G01M1/32

Claims Analysis

Total Claims: 18
Claim 1
Independent Claim 247 words
A method for balancing tubular shafts typically having varying wall thickness and eccentricity at different stations along the shaft, comprising the steps of: (1) mounting the shaft for rotation about an axis parallel to a reference plane surface; (2) rotating the shaft about the axis; (3) positioning at a selected station along the shaft both an X 1 electrical transducer for measuring the separation between the reference plane surface and the external surface of the shaft and an X 1 -X 2 electrical transducer for measuring the thickness of the wall of the shaft along a line extending normally from the reference plane surface to the axis of the shaft at the selected station, the X 1 and X 1 -X 2 transducers continuously measuring as the shaft is rotated and continuously converting the measured quantities into electrical signals as the shaft is rotated; (4) applying the electrical signals generated by the transducers to a computation circuit adapted to determine from the electrical signals generated at the selected station the required amount of counterweight and its required angular location around the shaft to balance the shaft at the selected station; (5) repeating the steps (3) and (4) at each remaining selected station along the shaft until the steps have been performed at all of the selected stations; (6) applying lengthwise along the shaft at the required angular locations a strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft.
Claim 2
Independent Claim 247 words
A method for balancing tubular shafts typically having varying wall thickness and eccentricity at different stations along the shaft, comprising the steps of: (1) mounting the shaft for rotation about an axis parallel to a reference plane surface; (2) rotating the shaft about the axis; (3) positioning at a selected station along the shaft both an X 1 electrical transducer for measuring the separation between the reference plane surface and the external surface of the shaft and an X 1 -X 2 electrical transducer for measuring the thickness of the wall of the shaft along a line extending normally from the reference plane surface to the axis of the shaft at the selected station, the X 1 and X 1 -X 2 transducers continuously measuring as the shaft is rotated and continuously converting the measured quantities into electrical signals as the shaft is rotated; (4) applying the electrical signals generated by the transducers to a computation circuit adapted to determine from the electrical signals generated at the selected station the required amount of counterweight and its required angular location around the shaft to balance the shaft at the selected station; (5) repeating the steps (3) and (4) at each remaining selected station along the shaft until the steps have been performed at all of the selected stations; (6) applying lengthwise along the shaft at the required angular locations a strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft.
Claim 3
Dependent Claim 49 words
The method of claim 1 further comprising the intermediate step between step (5) and step (6) of: preparing a strip of counterweight material for application lengthwise along the shaft and shaped to provide the required amount of counterweight at the required angular position for each station along the shaft.
Claim 4
Dependent Claim 12 words
The strip of counterweight material produced by the method of claim 2.
Claim 5
Dependent Claim 49 words
A balanced tubular shaft comprising: (a) a tubular shaft having an exterior surface; and, (b) a strip of counterweight material produced by the method of claim 2 and attached to the exterior surface of said tubular shaft at the required angular location around said tubular shaft to balance it.
Claim 6
Dependent Claim 20 words
The method of claim 1 further comprising the preliminary step of preparing the shaft for balancing, prior to step (1).
Claim 7
Dependent Claim 13 words
The method of claim 5 wherein the shaft is prepared by annealing it.
Claim 8
Dependent Claim 13 words
The method of claim 5 wherein the shaft is prepared by straightening it.
Claim 9
Dependent Claim 17 words
The method of claim 5 wherein the shaft is prepared by applying a surface treatment to it.
Claim 10
Dependent Claim 17 words
The method of claim 5 wherein the shaft is prepared by applying a surface coating to it.
Claim 11
Independent Claim 170 words
A method for balancing a tubular shaft having irregular wall thickness and some degree of eccentricity at different stations along its length, comprising the steps of: (1) measuring the wall thickness and eccentricity of the tubular shaft at points around the shaft at a selected station along the shaft; and then, (2) determining, for the station, from the measured wall thickness and eccentricity the required amount of counterweight and its required angular location to counterbalance the unbalanced mass at the station; (3) preparing, after step (2), to measure the wall thickness and eccentricity at a different station along the shaft; and then, (4) repeating steps (1)-(3) until measurements have been made at all selected stations along the shaft; (5) preparing, after step (4), a continuous strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft; and then, (6) applying the continuous strip of counterweight material to the shaft at the required angular locations to counterbalance the unbalanced mass at the selected stations.
Claim 12
Independent Claim 170 words
A method for balancing a tubular shaft having irregular wall thickness and some degree of eccentricity at different stations along its length, comprising the steps of: (1) measuring the wall thickness and eccentricity of the tubular shaft at points around the shaft at a selected station along the shaft; and then, (2) determining, for the station, from the measured wall thickness and eccentricity the required amount of counterweight and its required angular location to counterbalance the unbalanced mass at the station; (3) preparing, after step (2), to measure the wall thickness and eccentricity at a different station along the shaft; and then, (4) repeating steps (1)-(3) until measurements have been made at all selected stations along the shaft; (5) preparing, after step (4), a continuous strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft; and then, (6) applying the continuous strip of counterweight material to the shaft at the required angular locations to counterbalance the unbalanced mass at the selected stations.
Claim 13
Dependent Claim 13 words
The continuous strip of counterweight material produced by the method of claim 10.
Claim 14
Dependent Claim 40 words
A balanced tubular shaft comprising: (a) a tubular shaft having an exterior surface; and, (b) a strip of counterweight material produced by the method of claim 10 and attached to the exterior surface of said tubular shaft to balance it.
Claim 15
Independent Claim 155 words
A method for balancing a shaft having some degree of eccentricity at different stations along its length, comprising the steps of: (1) measuring the eccentricity of the shaft at points around the shaft at a selected station along the shaft; and then, (2) determining, for the station, from the measured eccentricity, the required amount of counterweight and its required angular location to counterbalance the unbalanced mass at the station; (3) preparing, after step (2), to measure the eccentricity at a different station along the shaft; and then, (4) repeating steps (1)-(3) until measurements have been made at all selected stations along the shaft; (5) preparing, after step (4), a continuous strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft; and then, (6) applying the continuous strip of counterweight material to the shaft at the required angular locations to counterbalance the unbalanced mass at the selected stations.
Claim 16
Independent Claim 155 words
A method for balancing a shaft having some degree of eccentricity at different stations along its length, comprising the steps of: (1) measuring the eccentricity of the shaft at points around the shaft at a selected station along the shaft; and then, (2) determining, for the station, from the measured eccentricity, the required amount of counterweight and its required angular location to counterbalance the unbalanced mass at the station; (3) preparing, after step (2), to measure the eccentricity at a different station along the shaft; and then, (4) repeating steps (1)-(3) until measurements have been made at all selected stations along the shaft; (5) preparing, after step (4), a continuous strip of counterweight material providing the required amount of counterweight to counterbalance the selected stations of the shaft; and then, (6) applying the continuous strip of counterweight material to the shaft at the required angular locations to counterbalance the unbalanced mass at the selected stations.
Claim 17
Dependent Claim 13 words
The continuous strip of counterweight material produced by the method of claim 13.
Claim 18
Dependent Claim 37 words
A balanced shaft comprising: (a) a shaft having an exterior surface; and, (b) a strip of counterweight material produced by the method of claim 13 and attached to the exterior surface of said shaft to balance it.

References Cited (Backward Citations)

US3071972A Cited
US3426437A Cited
US3604248A Cited
US4114456A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-10-15 1983-04-16 1983-10-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-10-15 1987-04-16 1987-10-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-10-15 1991-04-16 1991-10-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag