← Back to Patent Explorer
US4167426A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for annealing silicon steel

Assignee: Allegheny Ludlum Corp
•
Filing: 1978-04-20
•
Granted: 1979-09-11
•
Expires: 1998-04-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Individual charges of silicon steel are passed through a tunnel type furnace provided with charge and discharge vestibules. The annealing takes place in a hydrogen atmosphere and the vestibules are purged with nitrogen and then with hydrogen. The hydrogen used for purging is taken from the hydrogen in the annealing atmosphere and additional new hydrogen is added to the annealing atmosphere at the same time to maintain the pressure constant.

Inventors

  • 👤 Ralph E. Snyder
  • 👤 Philip R. Robinson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 04:25
CPC Classifications
C; C21; C21D; C21D9/00; C21D9/52; C21D9/54; C21D1/00; C21D1/74

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 344 words
An improved method for annealing a plurality of individual silicon steel charges in a tunnel furnace having a charge vestibule and a discharge vestibule at opposite ends of a main annealing chamber of the furnace, with each vestibule having an inner door and an outer door with respect to the main annealing chamber, which method comprises: providing a plurality of silicon steel charges in the main annealing chamber of the furnace with the inner doors of the vestibules closed, providing a hydrogen atmosphere in the main annealing chamber of the furnace, circulating the hydrogen atmosphere through the main annealing chamber of the furnace by continuously feeding the hydrogen atmosphere from the main chamber of the furnace through a reconditioning apparatus and back to the main annealing chamber of the furnace, maintaining a substantially constant pressure in the main annealing chamber of the furnace, placing a cold silicon steel charge in the charge vestibule, with the charge vestibule doors closed, successively purging the charge vestibule first with nitrogen then with hydrogen, opening the inner door of the charge vestibule and moving the cold charge from the vestibule into the main annealing chamber of the furnace, after the charge has been annealed, purging the discharge vestibule with hydrogen, opening the inner door of the discharge vestibule and moving the annealed charge from the main annealing chamber to the discharge vestibule, closing the inner door of the discharge vestibule and purging the discharge vestibule with nitrogen, opening the outer door of the discharge vestibule, and removing the annealed charge from the tunnel furnace, wherein the improvement comprises: intermittently removing a substantial amount of hydrogen from the circulating hydrogen atmosphere at a location upstream of the discharge end of the reconditioning apparatus, feeding the removed hydrogen to the respective charge and discharge vestibules when a hydrogen purge is required therein, and while removing hydrogen from the circulating hydrogen atmosphere, feeding hydrogen from a separate hydrogen source to the circulating hydrogen atmosphere in an amount sufficient to maintain the substantially constant pressure in the main chamber of the furnace.
Claim 2
Dependent Claim 344 words
An improved method for annealing a plurality of individual silicon steel charges in a tunnel furnace having a charge vestibule and a discharge vestibule at opposite ends of a main annealing chamber of the furnace, with each vestibule having an inner door and an outer door with respect to the main annealing chamber, which method comprises: providing a plurality of silicon steel charges in the main annealing chamber of the furnace with the inner doors of the vestibules closed, providing a hydrogen atmosphere in the main annealing chamber of the furnace, circulating the hydrogen atmosphere through the main annealing chamber of the furnace by continuously feeding the hydrogen atmosphere from the main chamber of the furnace through a reconditioning apparatus and back to the main annealing chamber of the furnace, maintaining a substantially constant pressure in the main annealing chamber of the furnace, placing a cold silicon steel charge in the charge vestibule, with the charge vestibule doors closed, successively purging the charge vestibule first with nitrogen then with hydrogen, opening the inner door of the charge vestibule and moving the cold charge from the vestibule into the main annealing chamber of the furnace, after the charge has been annealed, purging the discharge vestibule with hydrogen, opening the inner door of the discharge vestibule and moving the annealed charge from the main annealing chamber to the discharge vestibule, closing the inner door of the discharge vestibule and purging the discharge vestibule with nitrogen, opening the outer door of the discharge vestibule, and removing the annealed charge from the tunnel furnace, wherein the improvement comprises: intermittently removing a substantial amount of hydrogen from the circulating hydrogen atmosphere at a location upstream of the discharge end of the reconditioning apparatus, feeding the removed hydrogen to the respective charge and discharge vestibules when a hydrogen purge is required therein, and while removing hydrogen from the circulating hydrogen atmosphere, feeding hydrogen from a separate hydrogen source to the circulating hydrogen atmosphere in an amount sufficient to maintain the substantially constant pressure in the main chamber of the furnace.
Claim 3
Dependent Claim 27 words
The method of claim 1 in which the amount of hydrogen used for each purging of each vestibule is approximately at least 5% of the circulating hydrogen.
Claim 4
Dependent Claim 31 words
The method of claim 1 in which a charge is added to the charge vestibule approximately every 70 minutes, and each nitrogen and hydrogen purge requires approximately ten to twelve minutes.

References Cited (Backward Citations)

US2955062A Cited
US3606289A Cited
US3778221A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-09-10 1983-03-12 1983-09-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-09-10 1987-03-12 1987-09-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-09-10 1991-03-12 1991-09-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag