← Back to Patent Explorer
US4166709A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for vaulting hazardous chemical waste materials

Assignee: STABATROL CORP
•
Filing: 1978-08-03
•
Granted: 1979-09-04
•
Expires: 1998-08-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Hazardous chemical waste materials can be vaulted for permanent disposal by encapsulation in a water-impermeable film and a soil cement.

Inventors

  • 👤 Richard E. Valiga

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 11:47
CPC Classifications
E; E02; E02D; E02D31/00; E02D31/002; E02D31/004; B; B09; B09B; B09B1/00

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 71 words
A method for vaulting hazardous chemical waste materials which comprises: (1) selecting a vault area; (2) applying a first soil cement layer over the said vault area; (3) applying a second soil cement layer over the said first soil cement layer; (4) applying a first water-impermeable film to the top of the said second soil cement layer; (5) depositing the said hazardous chemical waste materials on the said first water-impermeable film;
Claim 2
Independent Claim 71 words
A method for vaulting hazardous chemical waste materials which comprises: (1) selecting a vault area; (2) applying a first soil cement layer over the said vault area; (3) applying a second soil cement layer over the said first soil cement layer; (4) applying a first water-impermeable film to the top of the said second soil cement layer; (5) depositing the said hazardous chemical waste materials on the said first water-impermeable film;
Claim 3
Dependent Claim 78 words
(6) applying a second water-impermeable film over the compacted hazardous chemical waste materials; (7) sealing the edges of the said first and second films; (8) applying a third soil cement layer over the said second film; (9) sealing the perimeter of said third layer to the perimeter of said second layer; (10) covering the said third soil cement layer with filler materials and grading the said filler materials to conform to the terrain surrounding the said vault area.
Claim 4
Dependent Claim 78 words
(6) applying a second water-impermeable film over the compacted hazardous chemical waste materials; (7) sealing the edges of the said first and second films; (8) applying a third soil cement layer over the said second film; (9) sealing the perimeter of said third layer to the perimeter of said second layer; (10) covering the said third soil cement layer with filler materials and grading the said filler materials to conform to the terrain surrounding the said vault area.
Claim 5
Dependent Claim 13 words
The method of claim 1 wherein the said water-impermeable film is polyethylene film.
Claim 6
Dependent Claim 24 words
The method of claim 1 wherein the said first and second soil cement layers together have a total thickness of 9 to 15 inches.

References Cited (Backward Citations)

US3466873A Cited
US3586624A Cited
DE2152172A1 Cited
DE2430371A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-09-03 1983-03-05 1983-09-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-09-03 1987-03-05 1987-09-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-09-03 1991-03-05 1991-09-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag