Offshore pipe laying

Assignee: Individual
•
Filing: 1977-11-14
•
Granted: 1979-08-14
•
Expires: 1997-11-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An offshore pipe laying system and method employs a remotely controllable submersible to track along the pipe line as laid on the sea bed. A sonic location device on the submersible enables the position of the touch down point of the pipe being laid to be determined. The deviation of this position from the intended track of the pipeline is computed and the pipe laying vessel is controlled to reduce this deviation.

Inventors

  • 👤 Lee R. Denman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 01:44
CPC Classifications
F; F16; F16L; F16L1/00; F16L1/12; F16L1/20; F16L1/235; G; G05; G05D; G05D1/00; G05D1/02; G05D1/0206

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 146 words
A method of laying pipeline offshore comprising the steps of guiding a pipe laying barge along, or parallel with, a predetermined right of way, feeding a continuous length of pipe from the barge to the sea bed so that the pipe is laid in the right of way, driving, by control from a surface vessel, a remotely controlled submersible along the track of the pipe as laid, determining the position of the submersible relative to the surface vessel, ascertaining, by means of sonic location apparatus on the submersible, the position of the touch down point of the pipeline, computing lateral deviation of the touch down point from the desired predetermined track of laid pipe within the right of way, and controlling lateral displacement of the pipe laying barge in accordance with the computed deviation of the touch down point so as to reduce the aforementioned deviation.
Claim 2
Independent Claim 146 words
A method of laying pipeline offshore comprising the steps of guiding a pipe laying barge along, or parallel with, a predetermined right of way, feeding a continuous length of pipe from the barge to the sea bed so that the pipe is laid in the right of way, driving, by control from a surface vessel, a remotely controlled submersible along the track of the pipe as laid, determining the position of the submersible relative to the surface vessel, ascertaining, by means of sonic location apparatus on the submersible, the position of the touch down point of the pipeline, computing lateral deviation of the touch down point from the desired predetermined track of laid pipe within the right of way, and controlling lateral displacement of the pipe laying barge in accordance with the computed deviation of the touch down point so as to reduce the aforementioned deviation.
Claim 3
Dependent Claim 62 words
A method as claimed in claim 1 wherein the sonic location apparatus on the submersible is an echo sounder and the position of the touch down point is ascertained by driving the submersible immediately above the pipe laid on the sea bed and noting the position of the submersible when the echo sounder indicates the pipe just lifting from the sea bed.
Claim 4
Dependent Claim 91 words
A method as claimed in claim 1 wherein the sonic location apparatus on the submersible is a side scan sonar transmitter and there is a complementary receiver on the surface vessel, and the position of the touch down point is ascertained by driving the submersible above and to one side of the pipe laid on the sea bed ascertaining with the side scan sonar apparatus the position relative to the submersible of the point where the pipe just lifts off the sea bed and simultaneously noting the position of the submersible.
Claim 5
Dependent Claim 56 words
A method as claimed in claim 1 wherein the desired predetermined track of the laid pipe is stored as a multiplicity of geographical coordinates along the desired track and the lateral deviation of the touch down point is computed by ascertaining the geographical position of the touch down point and comparing this with said stored co-ordinates.
Claim 6
Dependent Claim 85 words
A method as claimed in claim 3 wherein the desired predetermined track for the pipe being laid is substantially parallel with and a predetermined distance from a previously laid pipeline, and the submersible is driven along so that the side scan sonar apparatus detects simultaneously both the pipeline being laid and the previously laid line, and the duration of the touch down point is computed by comparing the lateral distance of the touch down point from the previously laid pipeline with the desired predetermined distance.
Claim 7
Dependent Claim 219 words
An offshore pipe laying system comprising a pipe laying barge having means for locating and propelling the barge; said barge also having means for feeding a continuous length of pipe from the barge to the seabed; automatic control apparatus for controlling said locating and propelling means in accordance with input data; storage means for storing an indication of a desired predetermined track on said seabed for a pipe line being laid by said barge; a surface vessel; a remotely controllable submersible; means on said surface vessel for controlling said submersible from said surface vessel; means for determining the position of the submersible relative to the surface vessel; said controlling means on said surface vessel including means driving said submersible along the track of the pipe laid by said pipe laying barge; sonic location apparatus on the submersible for ascertaining the position of the seabed touch-down point of the pipe line laid by said pipe laying barge; automatic computing apparatus arranged for obtaining an indication of lateral deviation of said touch-down point position, as ascertained by said sonic location apparatus, from the desired predetermined track of the pipe line stored in said storage means, and for computing in accordance with such lateral deviation input data for said automatic control apparatus of the pipe laying barge to reduce the aforementioned deviation.
Claim 8
Dependent Claim 219 words
An offshore pipe laying system comprising a pipe laying barge having means for locating and propelling the barge; said barge also having means for feeding a continuous length of pipe from the barge to the seabed; automatic control apparatus for controlling said locating and propelling means in accordance with input data; storage means for storing an indication of a desired predetermined track on said seabed for a pipe line being laid by said barge; a surface vessel; a remotely controllable submersible; means on said surface vessel for controlling said submersible from said surface vessel; means for determining the position of the submersible relative to the surface vessel; said controlling means on said surface vessel including means driving said submersible along the track of the pipe laid by said pipe laying barge; sonic location apparatus on the submersible for ascertaining the position of the seabed touch-down point of the pipe line laid by said pipe laying barge; automatic computing apparatus arranged for obtaining an indication of lateral deviation of said touch-down point position, as ascertained by said sonic location apparatus, from the desired predetermined track of the pipe line stored in said storage means, and for computing in accordance with such lateral deviation input data for said automatic control apparatus of the pipe laying barge to reduce the aforementioned deviation.
Claim 9
Dependent Claim 49 words
A system as claimed in claim 6 wherein the sonic location apparatus on the submersible is an echo sounder capable of distinguishing between the pipe lying on the seabed and the seabed as said submersible is driven along the track of said pipe laid by said pipe laying barge.
Claim 10
Dependent Claim 62 words
A system as claimed in claim 7 wherein the sonic location apparatus on the submersible is a side scan sonar transmitter and there is a complimentary receiver on the surface vessel, the side scan sonar apparatus being capable of distinguishing between the pipe lying on the seabed and the seabed when driven along, above and to one side of said pipe line.
Claim 11
Dependent Claim 30 words
A system as claimed in claim 8 wherein the means for determining the position of the submersible relative to the surface vessel is a sonar apparatus on the surface vessel.
Claim 12
Dependent Claim 211 words
An offshore pipe laying system comprising a pipe laying barge having means for locating and propelling the barge and automatic control apparatus for controlling said locating and propelling means in accordance with input data; means for storing an indication of a desired predetermined track for a pipe line; a surface vessel; a remotely controllable submersible arranged to be controlled from the surface vessel; means for determining the position of the submersible relative to the surface vessel; sonic location apparatus on the submersible arranged for ascertaining, when the submersible is driven along the track of the pipe as laid, the position of the seabed touch-down point of the pipe line; automatic computing apparatus arranged for obtaining an indication of lateral deviation of said touch-down position, as ascertained by the sonic location apparatus, from the predetermined track of the pipe line and for computing in accordance with such lateral deviation input data for said automatic control apparatus of the pipe laying barge to reduce the aforementioned deviation; the sonic location apparatus on the submersible being a side scan sonar transmitter; and a complimentary receiver on the surface vessel, the side scan sonar apparatus being capable of resolving the pipe lying on the seabed when driven along above and to one side of it.
Claim 13
Dependent Claim 211 words
An offshore pipe laying system comprising a pipe laying barge having means for locating and propelling the barge and automatic control apparatus for controlling said locating and propelling means in accordance with input data; means for storing an indication of a desired predetermined track for a pipe line; a surface vessel; a remotely controllable submersible arranged to be controlled from the surface vessel; means for determining the position of the submersible relative to the surface vessel; sonic location apparatus on the submersible arranged for ascertaining, when the submersible is driven along the track of the pipe as laid, the position of the seabed touch-down point of the pipe line; automatic computing apparatus arranged for obtaining an indication of lateral deviation of said touch-down position, as ascertained by the sonic location apparatus, from the predetermined track of the pipe line and for computing in accordance with such lateral deviation input data for said automatic control apparatus of the pipe laying barge to reduce the aforementioned deviation; the sonic location apparatus on the submersible being a side scan sonar transmitter; and a complimentary receiver on the surface vessel, the side scan sonar apparatus being capable of resolving the pipe lying on the seabed when driven along above and to one side of it.

References Cited (Backward Citations)

US3902155A Cited
US3105453A Cited
US3962726A Cited
US4037189A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-08-13 1983-02-12 1983-08-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-08-13 1987-02-12 1987-08-14 $3760.00 Window Closed / Lapsed