Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
169 words
The method of producing a pure aluminum coating of a thickness of from 0.004 inch to 0.008 inch (100-200 μm) on a continuous interface alloy of about 0.0002 inch, on small diameter steel tubing while continuously moving said tubing in a path, which includes the steps of: (a) passing said tubing through a non-oxidizing, high intensity, direct fired furnace of a fixed length, and having a fixed operating temperature, at a speed such as to uniformly heat the tubing to a peak temperature of from about 800° F. (445° C.) to about 1020° F. (567° C.), (b) passing said tubing through a turn-up chamber heated to about said peak temperature by external means, and containing a hydrogen-nitrogen atmosphere, (c) passing said tubing vertically upward out of said turn-up chamber under an exclusively nitrogen atmosphere with purposeful exclusion of hydrogen, (d) passing said tubing vertically upward through a shallow bath of molten aluminum, and (e) allowing the coated tubing to exit free from said bath and immediately air quenching it.
Claim 2
Independent Claim
169 words
The method of producing a pure aluminum coating of a thickness of from 0.004 inch to 0.008 inch (100-200 μm) on a continuous interface alloy of about 0.0002 inch, on small diameter steel tubing while continuously moving said tubing in a path, which includes the steps of: (a) passing said tubing through a non-oxidizing, high intensity, direct fired furnace of a fixed length, and having a fixed operating temperature, at a speed such as to uniformly heat the tubing to a peak temperature of from about 800° F. (445° C.) to about 1020° F. (567° C.), (b) passing said tubing through a turn-up chamber heated to about said peak temperature by external means, and containing a hydrogen-nitrogen atmosphere, (c) passing said tubing vertically upward out of said turn-up chamber under an exclusively nitrogen atmosphere with purposeful exclusion of hydrogen, (d) passing said tubing vertically upward through a shallow bath of molten aluminum, and (e) allowing the coated tubing to exit free from said bath and immediately air quenching it.
Claim 3
Dependent Claim
26 words
The method of claim 1, which includes the step of performing cleaning operations on said tubing to prepare it to accept a coating of pure aluminum.
Claim 4
Dependent Claim
22 words
The method of claim 1, wherein the speed of travel of the tubing is above about 60 feet per minute (18 mpm).
Claim 5
Dependent Claim
19 words
The method of claim 1 wherein the temperature of the molten aluminum is at least 1300° F. (720° C.).
Claim 6
Dependent Claim
23 words
The method of claim 1 wherein the temperature of the molten aluminum is between about 1400° F. and about 1500° F. (775°-835° C.).
Claim 7
Dependent Claim
25 words
The method of claim 1 wherein the depth of the bath of molten aluminum is between about 1/4 inch and about 3/4 inch (6.35-19 mm).
Claim 8
Dependent Claim
14 words
The method of claim 1 which includes the step of redrawing the finished tubing.
Claim 9
Dependent Claim
11 words
The method of claim 1 wherein the tubing is single-wall tubing.
Claim 10
Dependent Claim
41 words
The method of claim 1 wherein the tubing is double-wall tubing, having a copper plating principally on one side only, so that when formed into tubing, the outside of said tubing will have no more than a flash coating of copper.
Claim 11
Dependent Claim
16 words
The method of claim 1 wherein the tubing exits from said bath with a hydrogen cover.