← Back to Patent Explorer
US4155235A Expired / Lapsed US ⏱️ 0.0 years remaining

Production of heavy pure aluminum coatings on small diameter tubing

Assignee: Armco Inc
•
Filing: 1977-07-13
•
Granted: 1979-05-22
•
Expires: 1997-07-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method, and an apparatus for practicing the method, for producing heavy pure aluminum coatings on small diameter steel tubing are disclosed. The coating has an average thickness of 0.004 inch to 0.008 inch (100-200 mu m), to provide outstanding resistance to corrosion, and to maintain integrity in the face of abrasive action, and with coating ductility and adherence sufficient to permit double flaring. The method and apparatus are highly useful in the manufacture of Bundyweld tubing for automotive brake lines, and single wall tubing for refrigeration or air conditioner heat exchangers. Various surface preparations are disclosed; and after surface preparation the tube is uniformly heated to a carefully regulated peak temperature in a non-oxidizing high intensity direct fired furnace, followed by passing the tube vertically upward through a shallow pool of molten aluminum, whereby to cast on a thick coating, followed by "free exit" finishing, air quenching, and, if desired, redrawing.

Inventors

  • 👤 Marvin B. Pierson
  • 👤 Charles Flinchum

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 11:34
CPC Classifications
C; C23; C23C; C23C2/00; C23C2/04; C23C2/12

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 169 words
The method of producing a pure aluminum coating of a thickness of from 0.004 inch to 0.008 inch (100-200 μm) on a continuous interface alloy of about 0.0002 inch, on small diameter steel tubing while continuously moving said tubing in a path, which includes the steps of: (a) passing said tubing through a non-oxidizing, high intensity, direct fired furnace of a fixed length, and having a fixed operating temperature, at a speed such as to uniformly heat the tubing to a peak temperature of from about 800° F. (445° C.) to about 1020° F. (567° C.), (b) passing said tubing through a turn-up chamber heated to about said peak temperature by external means, and containing a hydrogen-nitrogen atmosphere, (c) passing said tubing vertically upward out of said turn-up chamber under an exclusively nitrogen atmosphere with purposeful exclusion of hydrogen, (d) passing said tubing vertically upward through a shallow bath of molten aluminum, and (e) allowing the coated tubing to exit free from said bath and immediately air quenching it.
Claim 2
Independent Claim 169 words
The method of producing a pure aluminum coating of a thickness of from 0.004 inch to 0.008 inch (100-200 μm) on a continuous interface alloy of about 0.0002 inch, on small diameter steel tubing while continuously moving said tubing in a path, which includes the steps of: (a) passing said tubing through a non-oxidizing, high intensity, direct fired furnace of a fixed length, and having a fixed operating temperature, at a speed such as to uniformly heat the tubing to a peak temperature of from about 800° F. (445° C.) to about 1020° F. (567° C.), (b) passing said tubing through a turn-up chamber heated to about said peak temperature by external means, and containing a hydrogen-nitrogen atmosphere, (c) passing said tubing vertically upward out of said turn-up chamber under an exclusively nitrogen atmosphere with purposeful exclusion of hydrogen, (d) passing said tubing vertically upward through a shallow bath of molten aluminum, and (e) allowing the coated tubing to exit free from said bath and immediately air quenching it.
Claim 3
Dependent Claim 26 words
The method of claim 1, which includes the step of performing cleaning operations on said tubing to prepare it to accept a coating of pure aluminum.
Claim 4
Dependent Claim 22 words
The method of claim 1, wherein the speed of travel of the tubing is above about 60 feet per minute (18 mpm).
Claim 5
Dependent Claim 19 words
The method of claim 1 wherein the temperature of the molten aluminum is at least 1300° F. (720° C.).
Claim 6
Dependent Claim 23 words
The method of claim 1 wherein the temperature of the molten aluminum is between about 1400° F. and about 1500° F. (775°-835° C.).
Claim 7
Dependent Claim 25 words
The method of claim 1 wherein the depth of the bath of molten aluminum is between about 1/4 inch and about 3/4 inch (6.35-19 mm).
Claim 8
Dependent Claim 14 words
The method of claim 1 which includes the step of redrawing the finished tubing.
Claim 9
Dependent Claim 11 words
The method of claim 1 wherein the tubing is single-wall tubing.
Claim 10
Dependent Claim 41 words
The method of claim 1 wherein the tubing is double-wall tubing, having a copper plating principally on one side only, so that when formed into tubing, the outside of said tubing will have no more than a flash coating of copper.
Claim 11
Dependent Claim 16 words
The method of claim 1 wherein the tubing exits from said bath with a hydrogen cover.

References Cited (Backward Citations)

US2570906A Cited
US2926103A Cited
US2935420A Cited
US3018194A Cited
US3010844A Cited
US3457097A Cited
US3468695A Cited
US3526529A Cited
US4053663A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-05-21 1982-11-20 1983-05-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-05-21 1986-11-20 1987-05-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-05-21 1990-11-20 1991-05-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag