US4150852A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of strip mining
Assignee: Individual
•
Filing: 1977-05-18
•
Granted: 1979-04-24
•
Expires: 1997-05-18
Abstract
Abstract A strip mining technique wherein an active mining area is continuously moved across a mining ground. Overburden is removed from a leading end of the active mining area and conveyed by a conveyor system located on a high-wall of the mining area to a following end of that mining area. The conveyed overburden is dumped adjacent the active mining area following end to form a spoil bank which is landscaped and reclaimed.
Inventors
- 👤 Charles M. McCoy
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 22:39
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/26; E21C41/28; E21C41/32
Claims Analysis
Total Claims: 12
Claim 1
Independent Claim
387 words
A method of strip mining comprising the steps of: defining an elongate active mining area in a mining ground, said active mining area including a longitudinal axis, a leading end at one end of said longitudinal axis, a following end at the other end of said longitudinal axis, and a highwall intersecting said ends; defining a plurality of benches in said active mining area, one of which forms a lowermost bench for supporting earth moving machinery and the other benches being located in said highwall to form a plurality of benches in said highwall above said lowermost bench; positioning earth moving machinery on said lowermost bench; continuously removing overburden from adjacent said leading end; continuously transferring said removed overburden along said longitudinal axis on an overburden removal path which is located in said highwall benches, and which is spaced above said lowermost bench and which is located substantially parallel to said longitudinal axis to a rear location behind said following end, said overburden removal path being spaced apart and above said lowermost bench to be located so that the removed overburden moving in said overburden removal path and equipment used to move that removed overburden in that path does not interfere with the earth moving machinery located on said lowermost bench; elevating that removed overburden which is located in said overburden removal path adjacent said active mining area following end from said overburden removal path in said highwall benches to a position adjacent the top of said highwall; covering the mining area behind said following end by spilling said removed and elevated overburden over the highwall onto said lowermost bench; depositing said spilled overburden into a spoil bank located immediately behind said following end; shaping said spoil bank to match the contour of the mining ground adjacent said active mining area; continuously removing coal from said active mining area while said overburden is being moved from adjacent said leading end to said rear end, said active mining area along with said overburden removal path being continously moved in the direction of said longitudinal axis across a mining ground by said continous overburden removing and transferring steps; and continuously shaping said spoil bank whereby the contour of the land is continuously restored behind the moving active mining area as the active mining area moves across the mining ground.
Claim 2
Independent Claim
387 words
A method of strip mining comprising the steps of: defining an elongate active mining area in a mining ground, said active mining area including a longitudinal axis, a leading end at one end of said longitudinal axis, a following end at the other end of said longitudinal axis, and a highwall intersecting said ends; defining a plurality of benches in said active mining area, one of which forms a lowermost bench for supporting earth moving machinery and the other benches being located in said highwall to form a plurality of benches in said highwall above said lowermost bench; positioning earth moving machinery on said lowermost bench; continuously removing overburden from adjacent said leading end; continuously transferring said removed overburden along said longitudinal axis on an overburden removal path which is located in said highwall benches, and which is spaced above said lowermost bench and which is located substantially parallel to said longitudinal axis to a rear location behind said following end, said overburden removal path being spaced apart and above said lowermost bench to be located so that the removed overburden moving in said overburden removal path and equipment used to move that removed overburden in that path does not interfere with the earth moving machinery located on said lowermost bench; elevating that removed overburden which is located in said overburden removal path adjacent said active mining area following end from said overburden removal path in said highwall benches to a position adjacent the top of said highwall; covering the mining area behind said following end by spilling said removed and elevated overburden over the highwall onto said lowermost bench; depositing said spilled overburden into a spoil bank located immediately behind said following end; shaping said spoil bank to match the contour of the mining ground adjacent said active mining area; continuously removing coal from said active mining area while said overburden is being moved from adjacent said leading end to said rear end, said active mining area along with said overburden removal path being continously moved in the direction of said longitudinal axis across a mining ground by said continous overburden removing and transferring steps; and continuously shaping said spoil bank whereby the contour of the land is continuously restored behind the moving active mining area as the active mining area moves across the mining ground.
Claim 3
Dependent Claim
36 words
The method of strip mining defined in claim 1, wherein the step of locating an overburden conveyor on one of said benches includes a step of orienting the conveyor to accommodate surface curvature in the highwall.
Claim 4
Dependent Claim
24 words
The method of strip mining defined in claim 1, wherein the step of removing coal includes a step of removing coal from said highwall.
Claim 5
Dependent Claim
29 words
The method of strip mining defined in claim 3, wherein the step of removing coal further includes the use of a coal auger which moves coal onto a truck.
Claim 6
Dependent Claim
23 words
The method of strip mining defined in claim 1, further including a step of defining an access road to said active mining area.
Claim 7
Dependent Claim
25 words
The method of strip mining defined in claim 1, wherein the step of defining a plurality of benches includes a step of defining three benches.
Claim 8
Dependent Claim
22 words
The method of strip mining defined in claim 6, further including removing coal from a coal face located adjacent said lowermost bank.
Claim 9
Dependent Claim
62 words
The method of strip mining defined in claim 1, wherein the step of moving overburden onto said overburden conveyor system includes steps of locating said conveyor system on an upper bench above said lowermost bench, moving said overburden onto a feeder chute and then onto a loading conveyor which is upwardly inclined and extends from said feeder chute to said conveyor system.
Claim 10
Dependent Claim
30 words
The method of strip mining defined in claim 8, further including a step of elevating said loading conveyor to accommodate varying heights between said upper bench and said lowermost bench.
Claim 11
Dependent Claim
23 words
The method of strip mining defined in claim 8, further including a step of moving said overburden onto an upwardly inclined unloading conveyor.
Claim 12
Dependent Claim
47 words
The method of strip mining defined in claim 10, further including a step of elevating said unloading conveyor to accommodate various highwall heights, said overburden being unloaded adjacent the top of said highwall so that the mining area adjacent said following end is completely covered with overburden.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-04-23 | 1982-10-23 | 1983-04-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-04-23 | 1986-10-23 | 1987-04-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-04-23 | 1990-10-23 | 1991-04-24 | $7700.00 | Window Closed / Lapsed |