← Back to Patent Explorer
US4148123A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and device for producing a spring manometer measuring system as well as a tube spring manometer

Assignee: Alexander Wiegand & Co Armaturen- und Manometerfabrik GmbH
•
Filing: 1977-11-25
•
Granted: 1979-04-10
•
Expires: 1997-11-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for producing a spring manometer measuring system that includes a deviation detector spring connected to an indicator by a tie rod, and the spring is subjected to a reference pressure for spring deflection measurement before producing a tie rod bearing.

Inventors

  • 👤 Kurt Neubeck
  • 👤 Hermann Julien

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 22:27
CPC Classifications
G; G01; G01L; G01L7/00; G01L7/02; G01L7/04; G01L7/041; Y; Y10; Y10T; Y10T29/00; Y10T29/49; Y10T29/49764; Y10T29/49771; Y10T29/49776

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 143 words
A method for producing a spring manometer measuring system consisting of an indicator, a spring serving as a deviation detector and a tie rod connecting the indicator to the spring, a bearing defining an end point being produced on the spring for one end of said tie rod and a second bearing defining a pivot point for the other end of said tie rod being produced on the indicator and the tie rod articulating with both bearings, the spring being subjected to a specific reference pressure while the deflection of said spring is being measured, the deflection of the spring being measured before the bearings are produced for the tie rod and the geometric locations at which the bearing on the spring and the second bearing are produced being determined from the measured deflection on the basis of experimentally ascertained or calculated associations.
Claim 2
Independent Claim 143 words
A method for producing a spring manometer measuring system consisting of an indicator, a spring serving as a deviation detector and a tie rod connecting the indicator to the spring, a bearing defining an end point being produced on the spring for one end of said tie rod and a second bearing defining a pivot point for the other end of said tie rod being produced on the indicator and the tie rod articulating with both bearings, the spring being subjected to a specific reference pressure while the deflection of said spring is being measured, the deflection of the spring being measured before the bearings are produced for the tie rod and the geometric locations at which the bearing on the spring and the second bearing are produced being determined from the measured deflection on the basis of experimentally ascertained or calculated associations.
Claim 3
Dependent Claim 24 words
A method according to claim 1, wherein the deflection of the spring is measured under the reference pressure which is greater than nominal pressure.
Claim 4
Dependent Claim 28 words
A method according to claim 1, wherein the measurement is made after the spring manometer measuring system has been completely assembled with the exception of the tie rod.
Claim 5
Dependent Claim 12 words
A method according to claim 1, wherein both bearings are produced simultaneously.
Claim 6
Dependent Claim 42 words
A method according to claim 1, wherein an end piece is disposed on the spring and the indicator has a segment lever, and the bearings are drilled or punched in the end piece and the segment lever in the form of holes.
Claim 7
Dependent Claim 39 words
A method according to claim 1, wherein an end piece is disposed on the spring and the indicator has a segment lever, and pre-fabricated bearings are affixed and welded to the end piece and segment lever and secured thereto.
Claim 8
Dependent Claim 44 words
A method according to claim 4, wherein the indicator is maintained in a mechanically defined final position during the production of the bearings, while at the same time the spring is subjected to the pressure which is suppressed at point zero of the indicator.
Claim 9
Independent Claim 140 words
A method for producing a spring manometer measuring system consisting of an indicator, a spring serving as a deviation detector and a tie rod connecting the indicator to the spring, a bearing defining an end point being produced on the spring for one end of said tie rod and a second bearing defining a pivot point for the other end of said tie rod being produced on the indicator and the tie rod articulating with both bearings, the spring being subjected to a specific reference pressure while the deflection of said spring is being measured, the deflection of the spring being measured before one of the two bearings is produced for the tie rod and the geometrical location at which this one bearing is produced is determined from the measured deflection on the basis of experimentally ascertained or calculated associations.
Claim 10
Independent Claim 140 words
A method for producing a spring manometer measuring system consisting of an indicator, a spring serving as a deviation detector and a tie rod connecting the indicator to the spring, a bearing defining an end point being produced on the spring for one end of said tie rod and a second bearing defining a pivot point for the other end of said tie rod being produced on the indicator and the tie rod articulating with both bearings, the spring being subjected to a specific reference pressure while the deflection of said spring is being measured, the deflection of the spring being measured before one of the two bearings is produced for the tie rod and the geometrical location at which this one bearing is produced is determined from the measured deflection on the basis of experimentally ascertained or calculated associations.
Claim 11
Dependent Claim 24 words
A method according to claim 8, wherein the deflection of the spring is measured under the reference pressure which is greater than nominal pressure.
Claim 12
Dependent Claim 26 words
A method according to claim 8, wherein the measurement is made after the spring manometer measuring system has been completely assembled except for the tie rod.
Claim 13
Dependent Claim 19 words
A method according to claim 8, wherein the bearing which is produced after the measurement is the second bearing.
Claim 14
Dependent Claim 43 words
A method according to claim 8, wherein an end piece is disposed on the spring and the indicator has a segment lever, and the bearing is drilled or punched in the end piece or the segment lever in the form of a hole.
Claim 15
Dependent Claim 40 words
A method according to claim 8, wherein an end piece is disposed on the spring and the indicator has a segment lever, and a pre-fabricated bearing is affixed or welded to the end piece or segment lever and secured thereto.

References Cited (Backward Citations)

US3452600A Cited
US3805619A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-04-09 1982-10-09 1983-04-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-04-09 1986-10-09 1987-04-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-04-09 1990-10-09 1991-04-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag