Method for constructing a rectangularly shaped tunnel

Assignee: Dowa Engineering Co Ltd
•
Filing: 1978-02-01
•
Granted: 1979-04-03
•
Expires: 1998-02-01
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A rectangularly shaped tunnel is constructed to include an artificial roof, side wall pillars, a center wall pillar and floor portions all extending along the length of tunnel. The artificial roof is formed by sequentially excavating cross cut shafts and by subsequently plugging the thus formed cavities with concrete. Then the portions directly beneath opposite sides and the center of the roof are excavated and filled with concrete to form side wall pillars and a center wall pillar. Thereafter the rock portions covered by the roof and the wall pillars are excavated to form inner hollow tunnel chambers, the bottoms of which are covered by concrete to form floor portions. Iron frames are embedded in the concrete.

Inventors

  • 👤 Toshiya Ogasawara
  • 👤 Norimasa Kubo
  • 👤 Hiroshi Nagino
  • 👤 Mamoru Takeda
  • 👤 Masanori Ochiishi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 04:12
CPC Classifications
E; E21; E21D; E21D9/00; E21D11/00; E21D11/04; E21D11/10

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 251 words
A method for constructing a rectangularly shaped tunnel through an earth body, said method comprising: constructing an artificial tunnel roof by: excavating a gateway shaft through an earth body in a direction along the length of an intended tunnel; sequentially excavating a plurality of cross cut shafts through said earth body from opposite sides of said gateway shaft in opposite lateral directions transverse to the length of the intended tunnel, and sequentially filling said cross cut shafts with concrete, whereby a given said cross cut shaft is excavated immediately adjacent a preceding said cross cut shaft after the said concrete therein has solidified; and filling said gateway shaft with concrete, whereby said concrete filling said cross cut shafts and said gateway shaft together form an integral tunnel roof; constructing vertical wall pillars directly beneath opposite lateral edge and central portions of said tunnel roof by: sequentially excavating portions of said earth body directly beneath said opposite lateral edge and central portions of said tunnel roof, to thereby form vertical wall cavities extending along the length of the intended tunnel; and filling said vertical wall cavities with concrete, to thereby form vertical wall pillars, which together with said tunnel roof cover inner block portions of said earth body; removing said inner block portions of said earth body, to thereby form rectangularly shaped hollow tunnel chambers extending along the length of the intended tunnel; and forming concrete layers on the bottom surfaces of said hollow tunnel chambers, to thereby form tunnel floor portions.
Claim 2
Independent Claim 251 words
A method for constructing a rectangularly shaped tunnel through an earth body, said method comprising: constructing an artificial tunnel roof by: excavating a gateway shaft through an earth body in a direction along the length of an intended tunnel; sequentially excavating a plurality of cross cut shafts through said earth body from opposite sides of said gateway shaft in opposite lateral directions transverse to the length of the intended tunnel, and sequentially filling said cross cut shafts with concrete, whereby a given said cross cut shaft is excavated immediately adjacent a preceding said cross cut shaft after the said concrete therein has solidified; and filling said gateway shaft with concrete, whereby said concrete filling said cross cut shafts and said gateway shaft together form an integral tunnel roof; constructing vertical wall pillars directly beneath opposite lateral edge and central portions of said tunnel roof by: sequentially excavating portions of said earth body directly beneath said opposite lateral edge and central portions of said tunnel roof, to thereby form vertical wall cavities extending along the length of the intended tunnel; and filling said vertical wall cavities with concrete, to thereby form vertical wall pillars, which together with said tunnel roof cover inner block portions of said earth body; removing said inner block portions of said earth body, to thereby form rectangularly shaped hollow tunnel chambers extending along the length of the intended tunnel; and forming concrete layers on the bottom surfaces of said hollow tunnel chambers, to thereby form tunnel floor portions.
Claim 3
Dependent Claim 51 words
A method as claimed in claim 1, further comprising, before filling said concrete in each of said cross cut shafts, said gateway shaft, said vertical wall cavities and the volumes occupied by said tunnel floor portions, constructing metal frames therein, such that said metal frames are thereafter imbedded in said concrete.
Claim 4
Dependent Claim 38 words
A method as claimed in claim 2, wherein said metal frames in said tunnel roof are connected, said metal frames in said vertical wall pillars are connected, and said metal frames in said tunnel floor portions are connected.
Claim 5
Dependent Claim 18 words
A method as claimed in claim 1, wherein said vertical wall cavities are sequentially excavated in plural layers.
Claim 6
Dependent Claim 39 words
A method as claimed in claim 1, wherein said inner block portions are removed by forming longitudinal shafts through lower central portions of said inner block portions, and then blasting away said inner block portions from said longitudinal shafts.
Claim 7
Dependent Claim 29 words
A method as claimed in claim 1, further comprising forming another tunnel above said rectangularly shaped tunnel by using said tunnel roof as a floor for said another tunnel.
Claim 8
Dependent Claim 31 words
A method as claimed in claim 1, further comprising forming another tunnel below said rectangularly shaped tunnel by using said tunnel floor portions as a tunnel roof for said another tunnel.
Claim 9
Dependent Claim 128 words
A method as claimed in claim 1, wherein said step of constructing said artificial tunnel roof further comprises evacuating a lower gateway shaft at a position below said first-mentioned gateway shaft, excavating a plurality of longitudinally spaced upper connecting shafts laterally from opposite sides of said first-mentioned gateway shaft in opposite lateral directions transverse to the length of the intended tunnel, evacuating a plurality of lower connecting shafts below said upper connecting shafts from opposite sides of said lower gateway shaft in opposite lateral directions transverse to the length of the intended tunnel, excavating vertical service shafts between vertically aligned outer ends of said upper and lower connecting shafts, and excavating a plurality of longitudinally spaced vertically extending evacuation chutes between said first-mentioned and said lower gateway shafts.

References Cited (Backward Citations)

US960940A Cited
US1242217A Cited
US1338030A Cited
US1785096A Cited
DE1658735A1 Cited
US4009579A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-04-02 1982-10-02 1983-04-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-04-02 1986-10-02 1987-04-03 $3760.00 Window Closed / Lapsed