← Back to Patent Explorer
US4145909A Expired / Lapsed US ⏱️ 0.0 years remaining

Pipeline bending method

Assignee: ExxonMobil Upstream Research Co
•
Filing: 1978-03-13
•
Granted: 1979-03-27
•
Expires: 1998-03-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for the controlled bending of a submerged pipeline is disclosed. The section of the pipeline which is to be bent is slightly elevated off the sea floor, preferably by buoys attached to the pipeline along its length. The end of the elevated section of pipeline is pulled in to the desired point of termination while a drag force is simultaneously applied to the elevated portion of the pipeline. The applied drag force should be sufficient to create a bending moment which causes the pipeline to bend along a well defined arc. Preferably, dragging means such as chains, cables, or clump weights extending from the pipeline to the sea floor are used to impose the necessary drag force on the pipeline and to control elevation of the pipeline above the sea floor.

Inventors

  • 👤 Arthur C. Daughtry

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-02 13:23
CPC Classifications
F; F16; F16L; F16L1/00; F16L1/12; F16L1/14; F16L1/16

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 74 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: buoyantly elevating said terminal portion of the pipeline to a position above the bottom of said body of water; and pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 2
Independent Claim 74 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: buoyantly elevating said terminal portion of the pipeline to a position above the bottom of said body of water; and pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 3
Dependent Claim 26 words
The method of claim 1 wherein buoys are attached to the terminal portion of said pipeline along its length to provide said pipeline with buoyant elevation.
Claim 4
Dependent Claim 22 words
The method of claim 1 wherein said pipeline is buoyantly elevated a short distance above the bottom of said body of water.
Claim 5
Dependent Claim 31 words
The method of claim 1 wherein said drag force is applied by dragging means attached to the terminal portion of said pipeline which contacts the bottom of said body of water.
Claim 6
Dependent Claim 27 words
The method of claim 4 wherein said dragging means are chains which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 7
Dependent Claim 28 words
The method of claim 4 wherein said dragging means are heavy cables which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 8
Dependent Claim 28 words
The method of claim 4 wherein said dragging means are clump weights which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 9
Dependent Claim 30 words
The method of claim 1 wherein said pipeline is pulled to a point of termination by a cable extending from the end of said pipeline to said point of termination.
Claim 10
Independent Claim 109 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: elevating said terminal portion of the pipeline to a position above the bottom of said body of water by attaching buoys to said terminal portion; pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc, said drag force being applied by dragging means attached to the terminal portion of said pipeline which contact the bottom of said body of water as the pipeline is pulled.
Claim 11
Independent Claim 109 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: elevating said terminal portion of the pipeline to a position above the bottom of said body of water by attaching buoys to said terminal portion; pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc, said drag force being applied by dragging means attached to the terminal portion of said pipeline which contact the bottom of said body of water as the pipeline is pulled.
Claim 12
Dependent Claim 27 words
The method of claim 9 wherein said dragging means are chains which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 13
Dependent Claim 28 words
The method of claim 9 wherein said dragging means are heavy cables which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 14
Dependent Claim 32 words
The method of claim 9 wherein said dragging means are clump weights attached to said pipeline which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 15
Independent Claim 122 words
A method of bending a terminal portion of a pipeline to effect a subsea connection of said pipeline comprising: attaching buoys and dragging means to the terminal portion of said pipeline prior to laying said terminal portion in a body of water, said buoys providing sufficient buoyancy to elevate the terminal portion of said pipeline a short distance above the bottom of said body of water so that said dragging means contact the bottom of said body of water; and pulling in the end of said elevated portion of pipeline to a point of termination while said dragging means simultaneously apply a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 16
Independent Claim 122 words
A method of bending a terminal portion of a pipeline to effect a subsea connection of said pipeline comprising: attaching buoys and dragging means to the terminal portion of said pipeline prior to laying said terminal portion in a body of water, said buoys providing sufficient buoyancy to elevate the terminal portion of said pipeline a short distance above the bottom of said body of water so that said dragging means contact the bottom of said body of water; and pulling in the end of said elevated portion of pipeline to a point of termination while said dragging means simultaneously apply a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 17
Dependent Claim 30 words
The method of claim 13 wherein said pipeline is pulled to a point of termination by a cable extending from the end of said pipeline to said point of termination.

References Cited (Backward Citations)

US3431739A Cited
US3466882A Cited
US3524325A Cited
US3650114A Cited
US3765185A Cited
US3955599A Cited
US4063430A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-03-26 1982-09-25 1983-03-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-03-26 1986-09-25 1987-03-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-03-26 1990-09-25 1991-03-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag