Claims Analysis
Total Claims: 17
Claim 1
Independent Claim
74 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: buoyantly elevating said terminal portion of the pipeline to a position above the bottom of said body of water; and pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 2
Independent Claim
74 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: buoyantly elevating said terminal portion of the pipeline to a position above the bottom of said body of water; and pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 3
Dependent Claim
26 words
The method of claim 1 wherein buoys are attached to the terminal portion of said pipeline along its length to provide said pipeline with buoyant elevation.
Claim 4
Dependent Claim
22 words
The method of claim 1 wherein said pipeline is buoyantly elevated a short distance above the bottom of said body of water.
Claim 5
Dependent Claim
31 words
The method of claim 1 wherein said drag force is applied by dragging means attached to the terminal portion of said pipeline which contacts the bottom of said body of water.
Claim 6
Dependent Claim
27 words
The method of claim 4 wherein said dragging means are chains which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 7
Dependent Claim
28 words
The method of claim 4 wherein said dragging means are heavy cables which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 8
Dependent Claim
28 words
The method of claim 4 wherein said dragging means are clump weights which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 9
Dependent Claim
30 words
The method of claim 1 wherein said pipeline is pulled to a point of termination by a cable extending from the end of said pipeline to said point of termination.
Claim 10
Independent Claim
109 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: elevating said terminal portion of the pipeline to a position above the bottom of said body of water by attaching buoys to said terminal portion; pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc, said drag force being applied by dragging means attached to the terminal portion of said pipeline which contact the bottom of said body of water as the pipeline is pulled.
Claim 11
Independent Claim
109 words
A method of bending a terminal portion of a pipeline submerged in a body of water comprising: elevating said terminal portion of the pipeline to a position above the bottom of said body of water by attaching buoys to said terminal portion; pulling in the end of said elevated portion to a point of termination while simultaneously applying a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc, said drag force being applied by dragging means attached to the terminal portion of said pipeline which contact the bottom of said body of water as the pipeline is pulled.
Claim 12
Dependent Claim
27 words
The method of claim 9 wherein said dragging means are chains which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 13
Dependent Claim
28 words
The method of claim 9 wherein said dragging means are heavy cables which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 14
Dependent Claim
32 words
The method of claim 9 wherein said dragging means are clump weights attached to said pipeline which partially rest on the bottom of said body of water when said pipeline is elevated.
Claim 15
Independent Claim
122 words
A method of bending a terminal portion of a pipeline to effect a subsea connection of said pipeline comprising: attaching buoys and dragging means to the terminal portion of said pipeline prior to laying said terminal portion in a body of water, said buoys providing sufficient buoyancy to elevate the terminal portion of said pipeline a short distance above the bottom of said body of water so that said dragging means contact the bottom of said body of water; and pulling in the end of said elevated portion of pipeline to a point of termination while said dragging means simultaneously apply a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 16
Independent Claim
122 words
A method of bending a terminal portion of a pipeline to effect a subsea connection of said pipeline comprising: attaching buoys and dragging means to the terminal portion of said pipeline prior to laying said terminal portion in a body of water, said buoys providing sufficient buoyancy to elevate the terminal portion of said pipeline a short distance above the bottom of said body of water so that said dragging means contact the bottom of said body of water; and pulling in the end of said elevated portion of pipeline to a point of termination while said dragging means simultaneously apply a drag force to said elevated portion which is sufficient to cause said pipeline to bend along a well defined arc.
Claim 17
Dependent Claim
30 words
The method of claim 13 wherein said pipeline is pulled to a point of termination by a cable extending from the end of said pipeline to said point of termination.