US4140073A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Thermal barrier system for liquefied gas tank
Assignee: Frigitemp Corp
•
Filing: 1977-07-12
•
Granted: 1979-02-20
•
Expires: 1997-07-12
Abstract
Abstract Heat barrier components and improved thermal insulation techniques are provided for an external tank insulation system of ships carrying liquefied natural gas, propane, ammonia, etc. Reduction of liquid boil-off rate or initial cost of insulation through the reduction of radiant heat leak is accomplished by a composite insulation system including a high reflectance component material on the external surface of insulation and/or interior surface of the ship facing the tank. Further, refrigeration in tank boil-off is used to cool a radiation shield located between the tank insulation and surrounding enclosure, and to cool the skirt support.
Inventors
- 👤 John G. Androulakis
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 13:15
CPC Classifications
B; B63; B63B; B63B25/00; B63B25/02; B63B25/08; B63B25/12; B63B25/16; F; F17; F17C; F17C13/00; F17C13/001; F17C3/00; F17C3/02; F17C3/10; F17C2201/00; F17C2201/01; F17C2201/0128; F17C2201/05; F17C2201/052; F17C2203/00; F17C2203/01; F17C2203/014; F17C2203/015; F17C2203/03; F17C2203/0304; F17C2203/0308; F17C2203/0316; F17C2203/032; F17C2203/0329; F17C2203/0333; F17C2203/06; F17C2203/0602; F17C2203/0607; F17C2203/0612; F17C2203/0626; F17C2203/0631; F17C2203/0634; F17C2203/0636; F17C2203/0639; F17C2203/0646; F17C2221/00; F17C2221/03; F17C2221/032; F17C2221/033; F17C2223/00; F17C2223/01; F17C2223/0146; F17C2223/0153; F17C2223/0161; F17C2223/03; F17C2223/033; F17C2227/00; F17C2227/03; F17C2227/0337; F17C2227/0339; F17C2260/00; F17C2260/03; F17C2260/031; F17C2260/033; F17C2265/00; F17C2265/03; F17C2265/031; F17C2270/00; F17C2270/01; F17C2270/0102; F17C2270/0105; Y; Y10; Y10S; Y10S220/00; Y10S220/901
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
77 words
In a tanker vessel containing a tank for storing and transporting cryogenic fluids, said tank having exterior surface insulation thereon and being supported in the vessel on a skirt member; a thermal barrier system comprising high reflectance material positioned between the tank and the interior surfaces of said vessel; high reflectance shield means positioned above the top of said tank; and means for circulating boil-off from said tank about said shield means and about said skirt member.
Claim 2
Dependent Claim
77 words
In a tanker vessel containing a tank for storing and transporting cryogenic fluids, said tank having exterior surface insulation thereon and being supported in the vessel on a skirt member; a thermal barrier system comprising high reflectance material positioned between the tank and the interior surfaces of said vessel; high reflectance shield means positioned above the top of said tank; and means for circulating boil-off from said tank about said shield means and about said skirt member.
Claim 3
Dependent Claim
14 words
A tanker vessel of claim 1, wherein said high reflectance material is aluminum foil.
Claim 4
Dependent Claim
20 words
A tanker vessel of claim 1, wherein said circulating means includes a plurality of coolant paths on said shield means.
Claim 5
Dependent Claim
20 words
A tanker vessel of claim 1, wherein said circulating means includes a plurality of coolant paths on said skirt member.
Claim 6
Dependent Claim
85 words
An LNG tanker containing a spherical tank for storing and transporting LNG, said tank being supported in said tanker on a skirt member wherein the improvement comprises high reflectance material positioned on the outer surface of said tank, and the inner surfaces of said tanker viewed by the tank having a high reflectance coating thereon; a hemispherical shield positioned above said tank; conduit means for directing boil-off from said tank into thermal contact with said shield and said skirt member, whereby heat is removed therefrom.
Claim 7
Dependent Claim
85 words
An LNG tanker containing a spherical tank for storing and transporting LNG, said tank being supported in said tanker on a skirt member wherein the improvement comprises high reflectance material positioned on the outer surface of said tank, and the inner surfaces of said tanker viewed by the tank having a high reflectance coating thereon; a hemispherical shield positioned above said tank; conduit means for directing boil-off from said tank into thermal contact with said shield and said skirt member, whereby heat is removed therefrom.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-02-19 | 1982-08-21 | 1983-02-20 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-02-19 | 1986-08-21 | 1987-02-20 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-02-19 | 1990-08-21 | 1991-02-20 | $7700.00 | Window Closed / Lapsed |