Claims Analysis
Total Claims: 6
Claim 1
Independent Claim
225 words
An improved thermally active submarine conductor for the transmission of high voltage electrical power within a body of water the maximum depth of which exceeds the maximum depth operative capacity of practically viable available conductors for the said transmission; and which comprises a number of elements comprising at least a single semi-flexible thermally active linear high voltage conductor element; a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element completely disposed about the said conductor element; a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as required completely disposed about the aforesaid elements; a number of buoyant compensation elements disposed proximately about the aforesaid elements in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising therealong a number of tethering/mooring and anchoring stabilisation elements sufficient to provide at least a partially scoped non-tensioned deployment geometry for a prescribed degree of controlled free-flotation of the aforesaid elements; as well as a required number of elements for interconnecting all of the aforesaid elements into a complete functional entity, following a specified submarine routing suspended within the said body of water at a depth or linear plurality thereof following therealong, within a prescribed variance range circumscribing the said routing according to ambient sea conditions and said tethering/mooring prescribed geometry.
Claim 2
Dependent Claim
225 words
An improved thermally active submarine conductor for the transmission of high voltage electrical power within a body of water the maximum depth of which exceeds the maximum depth operative capacity of practically viable available conductors for the said transmission; and which comprises a number of elements comprising at least a single semi-flexible thermally active linear high voltage conductor element; a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element completely disposed about the said conductor element; a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as required completely disposed about the aforesaid elements; a number of buoyant compensation elements disposed proximately about the aforesaid elements in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising therealong a number of tethering/mooring and anchoring stabilisation elements sufficient to provide at least a partially scoped non-tensioned deployment geometry for a prescribed degree of controlled free-flotation of the aforesaid elements; as well as a required number of elements for interconnecting all of the aforesaid elements into a complete functional entity, following a specified submarine routing suspended within the said body of water at a depth or linear plurality thereof following therealong, within a prescribed variance range circumscribing the said routing according to ambient sea conditions and said tethering/mooring prescribed geometry.
Claim 3
Independent Claim
257 words
A method of interconnecting at least two high voltage electrical utility systems which are intersected by a body of water the maximum depth of at least some intervening portion of which exceeds the maximum depth operative capacity of practically viable available conductive means for the said installation, and which comprises: installing a number of elements comprising at least a single semi-flexible thermally active high voltage submarine conductor element completely disposed within a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element, as well as a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as may be required completely diposed about the aforesaid elements, and which follow a specified routing between the said systems, and which further comprises a number of buoyant compensation elements disposed proximately about the aforesaid elements in at least those excessive depth portions of the installation in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising a number of tethering/mooring elements disposed therealong in at least partially scoped non-tensioned geometry so as to provide a prescribed degree of controlled free-flotation of the aforesaid elements when anchored to the sea floor, following the said routing and suspended within the said body of water at a depth or linear plurality thereof following therealong, within the operative capacity of the said elements, and within a prescribed variance range circumscribing the said routing within the said excessive depth portions according to ambient sea conditions and said tethering/mooring prescribed geometry.
Claim 4
Independent Claim
257 words
A method of interconnecting at least two high voltage electrical utility systems which are intersected by a body of water the maximum depth of at least some intervening portion of which exceeds the maximum depth operative capacity of practically viable available conductive means for the said installation, and which comprises: installing a number of elements comprising at least a single semi-flexible thermally active high voltage submarine conductor element completely disposed within a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element, as well as a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as may be required completely diposed about the aforesaid elements, and which follow a specified routing between the said systems, and which further comprises a number of buoyant compensation elements disposed proximately about the aforesaid elements in at least those excessive depth portions of the installation in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising a number of tethering/mooring elements disposed therealong in at least partially scoped non-tensioned geometry so as to provide a prescribed degree of controlled free-flotation of the aforesaid elements when anchored to the sea floor, following the said routing and suspended within the said body of water at a depth or linear plurality thereof following therealong, within the operative capacity of the said elements, and within a prescribed variance range circumscribing the said routing within the said excessive depth portions according to ambient sea conditions and said tethering/mooring prescribed geometry.
Claim 5
Dependent Claim
257 words
An installation for interconnecting at least two high voltage electrical utility systems which are intersected by a body of water the maximum depth of at least some intervening portion of which exceeds the maximum depth operative capacity of practically viable available conductive means for the said installation, and which comprises: installing a number of elements comprising at least a single semi-flexible thermally active high voltage submarine conductor element completely disposed within a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element, as well as a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as may be required completely disposed about the aforesaid elements, and which follow a specified routing between the said systems, and which further comprises a number of buoyant compensation elements disposed proximately about the aforesaid elements in at least those excessive depth portions of the installation in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising a number of tethering/mooring elements disposed therealong in at least partially scoped non-tensioned geometry so as to provide a prescribed degree of controlled free-flotation of the aforesaid elements when anchored to the sea floor, following the said routing and suspended within the said body of water at a depth or linear plurality thereof following therealong, within the operative capacity of the said elements, and within a prescribed variance range circumscribing the said routing within the said excessive depth portions according to ambient sea conditions and said tethering/mooring prescribed geometry.
Claim 6
Dependent Claim
257 words
An installation for interconnecting at least two high voltage electrical utility systems which are intersected by a body of water the maximum depth of at least some intervening portion of which exceeds the maximum depth operative capacity of practically viable available conductive means for the said installation, and which comprises: installing a number of elements comprising at least a single semi-flexible thermally active high voltage submarine conductor element completely disposed within a number of elements comprising at least a single semi-flexible thermally active high voltage insulation element, as well as a number of elements comprising at least a single semi-flexible sheathing and mechanical armoring element as may be required completely disposed about the aforesaid elements, and which follow a specified routing between the said systems, and which further comprises a number of buoyant compensation elements disposed proximately about the aforesaid elements in at least those excessive depth portions of the installation in number, size and buoyant capacity so as to maintain at approximately specific gravity, when further comprising a number of tethering/mooring elements disposed therealong in at least partially scoped non-tensioned geometry so as to provide a prescribed degree of controlled free-flotation of the aforesaid elements when anchored to the sea floor, following the said routing and suspended within the said body of water at a depth or linear plurality thereof following therealong, within the operative capacity of the said elements, and within a prescribed variance range circumscribing the said routing within the said excessive depth portions according to ambient sea conditions and said tethering/mooring prescribed geometry.