← Back to Patent Explorer
US4131511A Expired / Lapsed US ⏱️ 0.0 years remaining

Nuclear fuel element

Assignee: Combustion Engineering Inc
•
Filing: 1977-02-04
•
Granted: 1978-12-26
•
Expires: 1997-02-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A nuclear fuel pin is formed of an elongated metallic tube, closed at each end, containing stacked fuel pellets and material including little, or no, fissionable material, and formed into porous, or bubbled, microspheres placed in the annulus between the pellets and the internal wall of the tube.

Inventors

  • 👤 Walter J. Mordarski
  • 👤 Jerome Roth

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 15:08
CPC Classifications
G; G21; G21C; G21C3/00; G21C3/02; G21C3/26; G21C3/04; G21C3/16; G21C3/20; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 78 words
A fuel pin for a nuclear reactor, including, a casing of zirconium alloy formed into a tube which is closed at each end, a stack of axially aligned nuclear fuel pellets positioned within the casing, and material formed into microspheres which are friable with a controlled crushing strength and which are porous with a controlled density and having substantially no fissionable components positioned in the annulus between the stack of pellets and the internal wall of the casing.
Claim 2
Dependent Claim 78 words
A fuel pin for a nuclear reactor, including, a casing of zirconium alloy formed into a tube which is closed at each end, a stack of axially aligned nuclear fuel pellets positioned within the casing, and material formed into microspheres which are friable with a controlled crushing strength and which are porous with a controlled density and having substantially no fissionable components positioned in the annulus between the stack of pellets and the internal wall of the casing.
Claim 3
Dependent Claim 19 words
The fuel pin of claim 1, wherein, the microspheres are of uranium oxide in which the uranium is depleted.
Claim 4
Dependent Claim 18 words
The fuel pin of claim 1, including, a tracer isotope distributed in the body formed into the microspheres.
Claim 5
Dependent Claim 13 words
The fuel pin of claim 1, wherein, the microspheres are of zirconium oxide.
Claim 6
Dependent Claim 13 words
The fuel pin of claim 1, wherein, the microspheres are of cesium oxide.
Claim 7
Dependent Claim 20 words
The fuel pin of claim 1, wherein, the microspheres are mixtures of depleted uranium and cesium oxide and zirconium oxide.
Claim 8
Dependent Claim 14 words
The fuel pin of claim 1, including, helium included in the annulus and microspheres.
Claim 9
Dependent Claim 21 words
The fuel pin of claim 1, including, getter material for iodine and cesium distributed in the body formed into the microspheres.
Claim 10
Dependent Claim 18 words
The fuel pin of claim 1, including, a burnable poison distributed in the body formed into the microspheres.

References Cited (Backward Citations)

US3042598A Cited
US3106520A Cited
US3180804A Cited
US3666846A Cited
US3880769A Cited
US3887486A Cited
US3778348A Cited
DE2237676A1 Cited
US3804708A Cited
US3926832A Cited
US3926832B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-12-25 1982-06-26 1982-12-26 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-12-25 1986-06-26 1986-12-26 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-12-25 1990-06-26 1990-12-26 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag