Method and apparatus for the storage of energy in power plants

Assignee: Deutsche Babcock AG
•
Filing: 1977-02-04
•
Granted: 1978-12-12
•
Expires: 1997-02-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An arrangement for the storage of energy in power plants to cover peak-load conditions. Hot water is heated in the feed water preheaters and is stored in a hot water storage tank. The tank is filled and emptied alternately, with a tank receiving cold water. The stored hot water is kept at feed water temperature, so that the temperature is uniform throughout the storage tank level. During peak load, the hot water is fed directly into the feed water line behind the high-pressure water preheaters. A steam cushion is maintained above the water surface in the hot-water storage tank to provide pressure and volume balance. The hot-water line leading to the hot-water storage tank, discharges into the feed water line behind the pressure feed water preheaters. A high-pressure feed pump is located behind this junction, and the hot-water storage tank is located underground in a cavern. The steam cushion and the hot-water storage tank may be connected to one of the bleeder lines of the turbine.

Inventors

  • 👤 Franz Thelen
  • 👤 Henning Weber

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 22:03
CPC Classifications
F; F01; F01K; F01K3/00; F01K3/004

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 130 words
A method for the storage of energy in power plants with a boiler for peak-load coverage comprising the steps of: heating hot water in feed water preheaters; storing the heated water in a hot water storage tank; filling and emptying alternately said storage tank and a tank receiving cold water; holding the stored hot water at feed water temperature and maintaining the temperature uniform throughout the storage tank level; feeding the hot water during peak load directly into a feed water line downstream of the high-pressure water heater preheaters; said hot water storage tank and said tank receiving cold water having substantially the same volume; blocking bleeder lines leading to feed water heaters and supplying said boiler exclusively with hot water from said hot water storage tank during peak-load operation.
Claim 2
Independent Claim 130 words
A method for the storage of energy in power plants with a boiler for peak-load coverage comprising the steps of: heating hot water in feed water preheaters; storing the heated water in a hot water storage tank; filling and emptying alternately said storage tank and a tank receiving cold water; holding the stored hot water at feed water temperature and maintaining the temperature uniform throughout the storage tank level; feeding the hot water during peak load directly into a feed water line downstream of the high-pressure water heater preheaters; said hot water storage tank and said tank receiving cold water having substantially the same volume; blocking bleeder lines leading to feed water heaters and supplying said boiler exclusively with hot water from said hot water storage tank during peak-load operation.
Claim 3
Dependent Claim 31 words
The method as defined in claim 1 including the step of maintaining a steam cushion volume above the water surface in the hot-water storage tank for providing pressure and volume balance.
Claim 4
Dependent Claim 131 words
Apparatus for storing energy in power plants with boiler means for peak-load coverage, comprising a hot-water storage tank; a hot-water line leading to said hot-water storage tank; high-pressure feed water preheaters; a feed water line behind said high-pressure feed water preheaters, said hot-water storage tank discharging into said feed water line; a high-pressure feed pump located behind the discharge of said hot-water storage tank into said feed water line; a cold water storage tank and said hot water storage tank being filled and emptied alternately; said hot water storage tank and said cold water storage tank having substantially the same volume; bleeder lines leading to feed water heaters being blocked during peak-load operation, said boiler means being supplied exclusively with hot water from said hot water storage tank during peak-load operation.
Claim 5
Dependent Claim 131 words
Apparatus for storing energy in power plants with boiler means for peak-load coverage, comprising a hot-water storage tank; a hot-water line leading to said hot-water storage tank; high-pressure feed water preheaters; a feed water line behind said high-pressure feed water preheaters, said hot-water storage tank discharging into said feed water line; a high-pressure feed pump located behind the discharge of said hot-water storage tank into said feed water line; a cold water storage tank and said hot water storage tank being filled and emptied alternately; said hot water storage tank and said cold water storage tank having substantially the same volume; bleeder lines leading to feed water heaters being blocked during peak-load operation, said boiler means being supplied exclusively with hot water from said hot water storage tank during peak-load operation.
Claim 6
Dependent Claim 17 words
Apparatus as defined in claim 3 wherein said hot-water storage tank is located in an underground cavern.
Claim 7
Dependent Claim 43 words
Apparatus as defined in claim 3 including a turbine and bleeder lines; a steam cushion volume above the water surface in the hot-water storage tank for providing pressure and volume balance; said steam cushion volume being connected to one of said bleeder lines.
Claim 8
Dependent Claim 118 words
Apparatus for storing energy in power plants for peak-load coverage, comprising a hot-water storage tank; a hot-water line leading to said hot-water storage tank; high-pressure feed water preheaters; a feed water line behind said high-pressure feed water preheaters, said hot-water storage tank discharging into said feed water line; a high-pressure feed pump located behind the discharge of said hot-water storage tank into said feed water line injector means; a steam cushion volume above the water surface in the hot-water storage tank for providing pressure and volume balance; said injector means being connected to said steam cushion, said hot-water storage tank being located above-ground; said injector means being in said hot water line leading to said hot-water storage tank.
Claim 9
Dependent Claim 118 words
Apparatus for storing energy in power plants for peak-load coverage, comprising a hot-water storage tank; a hot-water line leading to said hot-water storage tank; high-pressure feed water preheaters; a feed water line behind said high-pressure feed water preheaters, said hot-water storage tank discharging into said feed water line; a high-pressure feed pump located behind the discharge of said hot-water storage tank into said feed water line injector means; a steam cushion volume above the water surface in the hot-water storage tank for providing pressure and volume balance; said injector means being connected to said steam cushion, said hot-water storage tank being located above-ground; said injector means being in said hot water line leading to said hot-water storage tank.

References Cited (Backward Citations)

GB381924A Cited
DE818361C Cited
US2942411A Cited
US3448581A Cited
US3448580A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-12-11 1982-06-12 1982-12-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-12-11 1986-06-12 1986-12-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-12-11 1990-06-12 1990-12-12 $7700.00 Window Closed / Lapsed