← Back to Patent Explorer
US4127989A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for separating metal values from brine

Assignee: Union Oil Company of California
•
Filing: 1978-01-25
•
Granted: 1978-12-05
•
Expires: 1998-01-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for separating and recovering metal values and salts from brine, such as brine produced from a subterranean geothermal reservoir, in which the brine is pressurized to above the bubble point pressure and thereafter a precipitating agent, such as a soluble sulfide, is added to the brine to form insoluble metal sulfide precipitates. The precipitates are separated from the brine while maintaining the brine at a pressure above the bubble point pressure, and the hot brine is subsequently utilized to derive energy therefrom. The brine effluent after such energy derivation and the precipitate are optionally processed to primarily recover saleable salts and metal values, respectively.

Inventors

  • 👤 Grant A. Mickelson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 10:29
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/34; C; C01; C01D; C01D3/00; C01D3/14; C01D3/16; C01G; C01G1/00; C01G1/12; Y; Y10; Y10S; Y10S423/00; Y10S423/19

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 121 words
A process for separating and recovering metal values from hot brine containing dissolved heavy metal ions and/or transition metal ions, which comprises: (a) pressurizing said brine to a pressure in excess of the bubble point pressure of said brine; (b) adding an aqueous solution of a soluble sulfur compound to said pressurized brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized brine at a pressure in excess of the bubble point of said brine; (c) separating said insoluble precipitates from said pressurized brine while maintaining said pressurized brine at a pressure in excess of the bubble point pressure of said brine; and (d) recovering metal values from said separated insoluble heavy and/or transition metal sulfide precipitates.
Claim 2
Dependent Claim 121 words
A process for separating and recovering metal values from hot brine containing dissolved heavy metal ions and/or transition metal ions, which comprises: (a) pressurizing said brine to a pressure in excess of the bubble point pressure of said brine; (b) adding an aqueous solution of a soluble sulfur compound to said pressurized brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized brine at a pressure in excess of the bubble point of said brine; (c) separating said insoluble precipitates from said pressurized brine while maintaining said pressurized brine at a pressure in excess of the bubble point pressure of said brine; and (d) recovering metal values from said separated insoluble heavy and/or transition metal sulfide precipitates.
Claim 3
Dependent Claim 13 words
The process of claim 1 wherein said soluble sulfur compound is sodium sulfide.
Claim 4
Dependent Claim 34 words
The process of claim 1 wherein said insoluble precipitates are filtered from said pressurized brine while said pressurized brine is maintained at a pressure in excess of the bubble point pressure of said brine.
Claim 5
Dependent Claim 23 words
The process of claim 1 which further comprises: (e) deriving useful energy from said brine from which said insoluble precipitates have been separated.
Claim 6
Dependent Claim 17 words
The process of claim 1 wherein said metal values are manganese, iron, copper, silver lead and/or zinc.
Claim 7
Dependent Claim 142 words
A process for separating and recovering metal values from hot geothermal brine containing dissolved heavy metal ions and/or transition metal ions, which comprises: (a) pressurizing said geothermal brine to a pressure in excess of the bubble point pressure of said geothermal brine: (b) adding an aqueous solution of a soluble sulfide to said pressurized geothermal brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized brine at a pressure in excess of its bubble point pressure, said soluble sulfide being selected from the group consisting of an alkali metal or ammonium sulfide or polysulfide; (c) separating said insoluble precipitates from said pressurized geothermal brine while maintaining said pressurized brine at a pressure in excess of the bubble point pressure of said geothermal brine; and (d) recovering metal values from said separated insoluble heavy and/or transition metal sulfide precipitates.
Claim 8
Dependent Claim 142 words
A process for separating and recovering metal values from hot geothermal brine containing dissolved heavy metal ions and/or transition metal ions, which comprises: (a) pressurizing said geothermal brine to a pressure in excess of the bubble point pressure of said geothermal brine: (b) adding an aqueous solution of a soluble sulfide to said pressurized geothermal brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized brine at a pressure in excess of its bubble point pressure, said soluble sulfide being selected from the group consisting of an alkali metal or ammonium sulfide or polysulfide; (c) separating said insoluble precipitates from said pressurized geothermal brine while maintaining said pressurized brine at a pressure in excess of the bubble point pressure of said geothermal brine; and (d) recovering metal values from said separated insoluble heavy and/or transition metal sulfide precipitates.
Claim 9
Dependent Claim 12 words
The process of claim 6 wherein said soluble sulfide is sodium sulfide.
Claim 10
Dependent Claim 18 words
The process of claim 6 wherein said insoluble precipitates are separated from said pressurized geothermal brine by filtration.
Claim 11
Dependent Claim 24 words
The process of claim 6 which further comprises: (e) deriving useful energy from said geothermal brine from which said insoluble precipitates have been separated.
Claim 12
Dependent Claim 17 words
A process of claim 6 wherein said metal values are manganese, iron, copper, silver, lead and/or zinc.
Claim 13
Dependent Claim 163 words
A process for separating and recovering metal values from a geothermal brine having at a temperature of about 500° F. or above and containing dissolved heavy metal ions and/or transition metal ions which comprises: (a) pressuring said geothermal brine to a pressure of about 700 p.s.i.g., said pressure being in excess of the bubble point pressure of said geothermal brine; (b) adding an aqueous solution of sodium sulfide and/or sodium polysulfide to said pressurized geothermal brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized geothermal brine at a pressure in excess of its bubble point pressure; (c) filtering said insoluble precipitates from said pressurized geothermal brine in a high pressure filter while maintaining said pressurized geothermal brine at a pressure in excess of its bubble point pressure. (d) recovering metal values from said filtered insoluble heavy and/or transition metal sulfide precipitates; and (e) deriving useful energy from said geothermal brine from which said insoluble precipitates have been filtered.
Claim 14
Dependent Claim 163 words
A process for separating and recovering metal values from a geothermal brine having at a temperature of about 500° F. or above and containing dissolved heavy metal ions and/or transition metal ions which comprises: (a) pressuring said geothermal brine to a pressure of about 700 p.s.i.g., said pressure being in excess of the bubble point pressure of said geothermal brine; (b) adding an aqueous solution of sodium sulfide and/or sodium polysulfide to said pressurized geothermal brine to form insoluble heavy and/or transition metal sulfide precipitates while maintaining said pressurized geothermal brine at a pressure in excess of its bubble point pressure; (c) filtering said insoluble precipitates from said pressurized geothermal brine in a high pressure filter while maintaining said pressurized geothermal brine at a pressure in excess of its bubble point pressure. (d) recovering metal values from said filtered insoluble heavy and/or transition metal sulfide precipitates; and (e) deriving useful energy from said geothermal brine from which said insoluble precipitates have been filtered.
Claim 15
Dependent Claim 17 words
The process of claim 11 wherein said metal values are manganese, iron, copper, silver, lead and/or zinc.

References Cited (Backward Citations)

US1292075A Cited
US1793906A Cited
GB748593A Cited
US3258066A Cited
US3751673A Cited
US3757516A Cited
US3951794A Cited
US4063418A Cited
US4043129A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-12-04 1982-06-05 1982-12-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-12-04 1986-06-05 1986-12-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-12-04 1990-06-05 1990-12-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag