← Back to Patent Explorer
US4126008A Expired / Lapsed US ⏱️ 0.0 years remaining

Sea-floor template

Assignee: BP Corp North America Inc
•
Filing: 1977-09-02
•
Granted: 1978-11-21
•
Expires: 1997-09-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A folding sea-floor compactable template for proper positioning and spacing of subsea piles and wells in the sea floor. Anchor pile templates or well templates are provided at the end of long hinged arms which extend radially out from a central section (which may also be used as a well template). The arms are folded back over the central section for transportation. Flotation can be in the main central section. With additional flotation at the outer ends of the arms, installation can be carried out by controlled submergence in stages from a single barge.

Inventors

  • 👤 David A. Dixon

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 15:06
CPC Classifications
E; E21; E21B; E21B41/00; E21B41/08

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 123 words
A subsea template for locating boreholes in the sea bottom of a body of water which comprises: a center base section; arm means with an arm template at the outer end of each such arm means, said arm means and said arm template rigidly connected, said arm template section having vertical guide slots therethrough; hinge means connecting the ends of the arm means opposite said arm template section to said center base section, whereby said arms can be folded back with said arm template over said center base section in a first position and can be unfolded to a second position to extend essentially horizontal away from said center base section; flotation means for supporting said center base section and said arm means.
Claim 2
Dependent Claim 123 words
A subsea template for locating boreholes in the sea bottom of a body of water which comprises: a center base section; arm means with an arm template at the outer end of each such arm means, said arm means and said arm template rigidly connected, said arm template section having vertical guide slots therethrough; hinge means connecting the ends of the arm means opposite said arm template section to said center base section, whereby said arms can be folded back with said arm template over said center base section in a first position and can be unfolded to a second position to extend essentially horizontal away from said center base section; flotation means for supporting said center base section and said arm means.
Claim 3
Dependent Claim 29 words
A subsea template as described in claim 1, in which said center base section has center base flotation sufficient to support both said base section and said arms means.
Claim 4
Dependent Claim 31 words
A subsea template as defined in claim 2, including flotation means incorporated in said arm means sufficient to support said central base section and said arms in said body of water.
Claim 5
Dependent Claim 17 words
A subsea template as defined in claim 3, including vertical well slots through said center base section.
Claim 6
Dependent Claim 29 words
A subsea template as defined in claim 4, including remotely controlled means for ballasting or deballasting said flotation means of said center base section and of said arms means.
Claim 7
Independent Claim 138 words
A method of lowering a subsea template to the floor of a body of water from a barge in which the subsea template includes a center base section having a flotation unit, arms hingedly connected to said base section, and arms flotation means which comprises: connecting a lowering line to each arm; flooding said center base section flotation unit with water to lift said outer ends of said arms from said center base section as it submerges in said body of water; deballasting said arms flotation means and lowering said sub-sea template to said floor while holding said lowering lines taut; and pulling horizontally on each said line and in a direction away from said center base section and then slackening each said line to allow the arms to drop to the sea floor in an extended position.
Claim 8
Independent Claim 138 words
A method of lowering a subsea template to the floor of a body of water from a barge in which the subsea template includes a center base section having a flotation unit, arms hingedly connected to said base section, and arms flotation means which comprises: connecting a lowering line to each arm; flooding said center base section flotation unit with water to lift said outer ends of said arms from said center base section as it submerges in said body of water; deballasting said arms flotation means and lowering said sub-sea template to said floor while holding said lowering lines taut; and pulling horizontally on each said line and in a direction away from said center base section and then slackening each said line to allow the arms to drop to the sea floor in an extended position.
Claim 9
Dependent Claim 39 words
A subsea template as defined in claim 1 in which the vertical dimension of said center base section is approximately the same as that of the vertical dimension of said arm template and less than the depth of water.
Claim 10
Independent Claim 169 words
A method of towing and lowering a subsea template to the floor of a body of water from a barge in which the subsea template includes a center base section having a flotation unit, arms hingedly connected to said base section, and arms flotation means which comprises: folding said arms over said center base section to form a folded template; towing said folded template on said body of water to a selected site; connecting a lowering line to each said arm; flooding said center base section flotation unit with water to lift said outer end of said arms from said center base section as said center base section submerges in said body of water; deballasting said arms flotation means and lowering said subsea template to said floor while holding said lowering lines taut; and pulling horizontally on each said line in a direction away from said center base section and then slackening each said line to allow the arms to drop to the sea floor in an extended position.
Claim 11
Independent Claim 169 words
A method of towing and lowering a subsea template to the floor of a body of water from a barge in which the subsea template includes a center base section having a flotation unit, arms hingedly connected to said base section, and arms flotation means which comprises: folding said arms over said center base section to form a folded template; towing said folded template on said body of water to a selected site; connecting a lowering line to each said arm; flooding said center base section flotation unit with water to lift said outer end of said arms from said center base section as said center base section submerges in said body of water; deballasting said arms flotation means and lowering said subsea template to said floor while holding said lowering lines taut; and pulling horizontally on each said line in a direction away from said center base section and then slackening each said line to allow the arms to drop to the sea floor in an extended position.

References Cited (Backward Citations)

US2772539A Cited
US3934658A Cited
DE2454242A1 Cited
US4000624A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-11-20 1982-05-22 1982-11-21 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-11-20 1986-05-22 1986-11-21 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-11-20 1990-05-22 1990-11-21 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag