Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
226 words
Process for the manufacture of carriageway slab or the like which comprises at least two sections, each of which are prestressed throughout their length and breadth and including expansion joints between the sections, each expansion joint comprising the end plates of the two sections separated by a groove and covered by a bridging plate attached to one of the end plates and under which plate the end portion of the adjacent section is slidable, the improvement comprising concreting the main portion of a new section except for a relatively small portion adjacent the expansion joint, said main portion containing embedded jacketed tensioning rods extending from the end plate opposite the expansion joint and into the non-concreted portion of the section, tensioning said tensioning rods and fixing them under tension at the end of said concreted portion, said end plate adjacent said expansion joints containing tendons extending toward the ends of the tensioning rods in the non-concreted area, fixing the position of the two end plates at the expansion joint with respect to each other, securing the ends of the tendons to the ends of the corresponding tensioning members and placing the tendons under tension, concreting the space remaining in said section and then releasing the plates at the expansion joints whereby by the tension applied to the tendons is applied to stress the last applied concrete.
Claim 2
Dependent Claim
226 words
Process for the manufacture of carriageway slab or the like which comprises at least two sections, each of which are prestressed throughout their length and breadth and including expansion joints between the sections, each expansion joint comprising the end plates of the two sections separated by a groove and covered by a bridging plate attached to one of the end plates and under which plate the end portion of the adjacent section is slidable, the improvement comprising concreting the main portion of a new section except for a relatively small portion adjacent the expansion joint, said main portion containing embedded jacketed tensioning rods extending from the end plate opposite the expansion joint and into the non-concreted portion of the section, tensioning said tensioning rods and fixing them under tension at the end of said concreted portion, said end plate adjacent said expansion joints containing tendons extending toward the ends of the tensioning rods in the non-concreted area, fixing the position of the two end plates at the expansion joint with respect to each other, securing the ends of the tendons to the ends of the corresponding tensioning members and placing the tendons under tension, concreting the space remaining in said section and then releasing the plates at the expansion joints whereby by the tension applied to the tendons is applied to stress the last applied concrete.
Claim 3
Dependent Claim
26 words
The process as claimed in claim 1 wherein said tensioning rods and said tendons are formed of the same type of rods each with threaded ends.
Claim 4
Dependent Claim
51 words
The process as claimed in claim 2 wherein the position of the two end plates at the expansion joint is fixed by welding at least two restraining bars to the two parts thereof and wherein said tensioning rods are connected to said tendons, the latter stressed by means of a turnbuckle.
Claim 5
Dependent Claim
33 words
The process as claimed in claim 1 wherein said tensioning members are formed by hot rolling and are provided with ribs extending in a spiral line around the rod providing a screw-thread therefor.