Abstract

Abstract An improved electric power regeneration system, featuring reduced environmental air and thermal pollution. The system employs a method and means whereby during periods of low load demands upon a conventional type electric power generating plant, the excess power then available is employed (at low cost to the system) to pump low temperature ambient air (or any other suitably heat-absorbent gas) at relatively low pressure into a subterranean cavity in a salt deposit which is in thermal communication via an interconnecting spire or dome of salt with a geological "mother bed" occurring at such depths below the earth's surface as to constitute a constant high heat source. The air/gas conduit system is intermittently closed, whereupon the heat intake from the earth's center causes significant storage of heat energy in the entrapped air/gas and substantial increases of the pressures under which it is entrapped. When load requirements upon the generating plant are high, the meantime developed high pressure/temperature air/gas supply within the subterranean cavity is released to operate any suitably responsive turbine, or other engine driving electrical generating equipment so as to contribute to supply of the higher power demand.

Inventors

  • 👤 Charles H. Jacoby

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 16:37
CPC Classifications
F; F02; F02C; F02C6/00; F02C6/14; F02C6/16; F24; F24T; F24T10/00; F24T10/30; H; H02; H02J; H02J3/00; H02J3/28; Y; Y02; Y02E; Y02E10/00; Y02E10/10; Y02E60/00; Y02E60/16

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 196 words
The method not only of augmenting but also increasing the power output of an electrical power generating system, which comprises the steps of: (a) forming an underground cavity in a salt dome at such a depth that the walls of the cavity are substantially continuously at a selected elevated temperature; (b) generating electrical power at a surface facility; (c) diverting a selected amount of the power generated in step (b), during a low demand period and in advance of anticipated peak demand period, by pumping a compressible gas into initially low pressure and low temperature storage within said underground cavity; (d) closing off said cavity at a selected time sufficiently in advance of said anticipated peak demand period to allow the temperature of the gas stored in step (c) substantially to attain said selected elevated temperature and (e) augmenting power generated in step (b) and increasing the total output of said surface facility by opening said cavity during the peak demand period and releasing said gas to drive auxiliary power generating equipment by recovery not only of said selected amount of power diverted in step (c) but also of the heat energy supplied by said cavity.
Claim 2
Independent Claim 196 words
The method not only of augmenting but also increasing the power output of an electrical power generating system, which comprises the steps of: (a) forming an underground cavity in a salt dome at such a depth that the walls of the cavity are substantially continuously at a selected elevated temperature; (b) generating electrical power at a surface facility; (c) diverting a selected amount of the power generated in step (b), during a low demand period and in advance of anticipated peak demand period, by pumping a compressible gas into initially low pressure and low temperature storage within said underground cavity; (d) closing off said cavity at a selected time sufficiently in advance of said anticipated peak demand period to allow the temperature of the gas stored in step (c) substantially to attain said selected elevated temperature and (e) augmenting power generated in step (b) and increasing the total output of said surface facility by opening said cavity during the peak demand period and releasing said gas to drive auxiliary power generating equipment by recovery not only of said selected amount of power diverted in step (c) but also of the heat energy supplied by said cavity.
Claim 3
Dependent Claim 13 words
A method as set forth in claim 1 wherein said gas is air.
Claim 4
Dependent Claim 16 words
A method as set forth in claim 2 wherein said salt deposit essentially comprises sodium chloride.
Claim 5
Independent Claim 211 words
The method of recovering geothermal energy to augment the power output of an electrical power generating system, which comprises the steps of: (a) locating an underground mineral formation which is of high heat conductivity and which extends upwardly towards the earth's surface at least to a level which is accessible by commercially practicable bore hole drilling techniques, while at the same time being in thermal continuity, with a deep-seated heat source which is at such depth as to be totally inaccessible by such techniques; (b) forming a cavern in said mineral formation by said commercially practicable bore hole drilling techniques at such a great depth below the earth's surface that the mineral formation around said cavern is at an elevated temperature and is plastically compressed into air-tight condition; (c) generating electrical power at the earth's surface and periodically diverting some of the generated power to pump relatively cool, ambient air at the earth's surface into said cavern under low pressure; (d) sealing off said cavern for a time sufficient to allow the air trapped in said cavern to attain a pressure higher than said low pressure due to heating of the air within said cavern; and (e) periodically tapping the heated air within said cavern and generating additional electrical power therefrom.
Claim 6
Independent Claim 211 words
The method of recovering geothermal energy to augment the power output of an electrical power generating system, which comprises the steps of: (a) locating an underground mineral formation which is of high heat conductivity and which extends upwardly towards the earth's surface at least to a level which is accessible by commercially practicable bore hole drilling techniques, while at the same time being in thermal continuity, with a deep-seated heat source which is at such depth as to be totally inaccessible by such techniques; (b) forming a cavern in said mineral formation by said commercially practicable bore hole drilling techniques at such a great depth below the earth's surface that the mineral formation around said cavern is at an elevated temperature and is plastically compressed into air-tight condition; (c) generating electrical power at the earth's surface and periodically diverting some of the generated power to pump relatively cool, ambient air at the earth's surface into said cavern under low pressure; (d) sealing off said cavern for a time sufficient to allow the air trapped in said cavern to attain a pressure higher than said low pressure due to heating of the air within said cavern; and (e) periodically tapping the heated air within said cavern and generating additional electrical power therefrom.
Claim 7
Dependent Claim 16 words
The method as defined in claim 4 wherein said mineral formation is a sodium chloride dome.
Claim 8
Dependent Claim 26 words
The method as defined in claim 5 wherein the heated air tapped in step (e) is returned to the earth's surface to generate said additional power.

References Cited (Backward Citations)

US3523192A Cited
US3538340A Cited
US3858397A Cited
US3864917A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-11-06 1982-05-08 1982-11-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-11-06 1986-05-08 1986-11-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-11-06 1990-05-08 1990-11-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag