Abstract

Abstract The forward movement of a pipe-laying vessel when laying pipe offshore is controlled to maintain the position of the pipe as laid on the sea bed as close as possible to the desired track. The position of the touch down point on the sea bed of the pipeline suspended from the vessel is measured at periodic intervals by driving a survey vessel fitted with an echo location device along the already laid line. The measured position of a touch down point is compared with the desired track and any deviation is computed. Further movements of the pipe-laying vessel are adapted to minimize this deviation.

Inventors

  • 👤 Lee Richard Denman
  • 👤 William Randolph Abrams

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 11:19
CPC Classifications
F; F16; F16L; F16L1/00; F16L1/12; F16L1/16; F16L1/18; B; B63; B63B; B63B35/00; B63B35/03; B63H; B63H25/00

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 114 words
A method of laying pipeline offshore, comprising driving a pipe-laying barge along a predetermined right-of-way, feeding a continuous length of pipe from the barge to the underlying marine bottom so that the pipe is laid approximately along a predetermined path in the right-of-way, driving a vessel substantially over and along the track of the pipe as laid, ascertaining, by means of an echo sounder, the position of the touch-down point of the pipeline, computing the lateral deviation of the touch-down point from the predetermined path, and controlling the lateral displacement of the pipe-laying barge in accordance with the computed deviation of the touch-down point from the path so as to reduce the aforementioned deviation.
Claim 2
Independent Claim 114 words
A method of laying pipeline offshore, comprising driving a pipe-laying barge along a predetermined right-of-way, feeding a continuous length of pipe from the barge to the underlying marine bottom so that the pipe is laid approximately along a predetermined path in the right-of-way, driving a vessel substantially over and along the track of the pipe as laid, ascertaining, by means of an echo sounder, the position of the touch-down point of the pipeline, computing the lateral deviation of the touch-down point from the predetermined path, and controlling the lateral displacement of the pipe-laying barge in accordance with the computed deviation of the touch-down point from the path so as to reduce the aforementioned deviation.
Claim 3
Dependent Claim 59 words
A method as claimed in claim 1 wherein the vessel is repeatedly driven along the track of the pipe as laid from a point behind the touch-down point until the vessel passes over the touch-down point, whereupon the position of the touch-down point is ascertained, and thereafter driven back again behind the touch-down point to start a fresh run.
Claim 4
Dependent Claim 40 words
A method as claimed in claim 1 wherein the position of the touch-down point is ascertained by ascertaining the geographical or grid coordinates of the vessel when it is immdediately above the touch-down point as indicated by the echo sounder.
Claim 5
Dependent Claim 49 words
A method as claimed in claim 1 wherein the lateral deviation of the touch-down point from the predetermined path is computed by storing an indication of the path and computing the deviation of the position of the touch-down point as ascertained by the echo sounder from this stored path.
Claim 6
Dependent Claim 226 words
An offshore pipe-laying system comprising a pipe-laying barge including means for feeding a pipeline off of the barge to the sea bed, a system of anchors, a system of winches, and an automatic control apparatus for controlling the operation of the winches in accordance with input data so as to propel the barge as the pipeline is fed off of the barge to a touch-down point on the sea bed; means for storing an indication of a predetermined path in the right-of-way for a pipeline; a vessel which includes means capable of guiding the vessel along a course; an echo sounder on said vessel, the echo sounder being arranged to obtain data to ascertain the touch-down point of the pipeline being fed off of said barge; an automatic computing apparatus which is arranged to obtain an indication of the deviation of the touch-down point as detected by the echo sounder from said predetermined path and data transfer means having portions thereof on each of said barge and said vessel for transferring data from said vessel to said barge to provide an input for said automatic control apparatus on said barge which is a function of said deviation indication from said computing apparatus to control the automatic winch control apparatus of the pipe-laying barge to propel the pipe-laying barge in a direction to reduce the aforementioned deviation.
Claim 7
Dependent Claim 226 words
An offshore pipe-laying system comprising a pipe-laying barge including means for feeding a pipeline off of the barge to the sea bed, a system of anchors, a system of winches, and an automatic control apparatus for controlling the operation of the winches in accordance with input data so as to propel the barge as the pipeline is fed off of the barge to a touch-down point on the sea bed; means for storing an indication of a predetermined path in the right-of-way for a pipeline; a vessel which includes means capable of guiding the vessel along a course; an echo sounder on said vessel, the echo sounder being arranged to obtain data to ascertain the touch-down point of the pipeline being fed off of said barge; an automatic computing apparatus which is arranged to obtain an indication of the deviation of the touch-down point as detected by the echo sounder from said predetermined path and data transfer means having portions thereof on each of said barge and said vessel for transferring data from said vessel to said barge to provide an input for said automatic control apparatus on said barge which is a function of said deviation indication from said computing apparatus to control the automatic winch control apparatus of the pipe-laying barge to propel the pipe-laying barge in a direction to reduce the aforementioned deviation.
Claim 8
Dependent Claim 32 words
An offshore pipe-laying system as claimed in claim 5 wherein the pipe-laying barge includes a navigational aid which is capable of providing an indication of the geographical coordinates of the pipe-laying barge.
Claim 9
Dependent Claim 33 words
An offshore pipe-laying system as claimed in claim 5 wherein the indication of the predetermined path in the right-of-way consists of a storage of a multiplicity of geographical locations which the path traverses.
Claim 10
Dependent Claim 34 words
An offshore pipe-laying system as claimed in claim 5 wherein the vessel includes a navigational aid and means for determining the geographical coordinates of the vessel and the geographical coordinates of the touchdown point.
Claim 11
Dependent Claim 50 words
An offshore pipe-laying system as claimed in claim 5 wherein said data transfer means comprises a radio link between the vessel and the pipe-laying barge for transmitting data relating to the touch-down point ascertained by the echo sounder to the barge for use in controlling the automatic winch control apparatus.
Claim 12
Dependent Claim 32 words
An offshore pipe-laying apparatus as claimed in claim 9 wherein the radio link is arranged to transmit data defining the ascertained touch-down points and the automatic computing apparatus is on the barge.

References Cited (Backward Citations)

US3922632A Cited
US3668878A Cited
US3953827A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-10-16 1982-04-17 1982-10-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-10-16 1986-04-17 1986-10-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-10-16 1990-04-17 1990-10-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag