Steam turbine control system and method of controlling the ratio of steam flow between under full-arc admission mode and under partial-arc admission mode

Assignee: Hitachi Ltd
•
Filing: 1976-10-19
•
Granted: 1978-10-17
•
Expires: 1996-10-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a steam turbine-generator with means for determining a load demand signal in accordance with a load reference signal, means for determining the valve opening under each admission mode of full-arc and partial-arc in accordance with said load demand signal and means for adjusting the ratio between valve openings under the each admission mode in accordance with a load change the ratio of steam flow under each of the admission modes is controlled in accordance with a load change so as to minimize the thermal stresses and thereby reduce the turbine load changing time.

Inventors

  • 👤 Hiroshi Matsumoto
  • 👤 Yoshiyuki Nakano
  • 👤 Toshihiko Higashi
  • 👤 Akihiro Yasumoto

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 05:56
CPC Classifications
F; F01; F01D; F01D19/00; F01D19/02; F01D17/00; F01D17/10; F01D17/12; F01D17/18

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 207 words
In a steam turbine control system having a turbine and a plurality of valves operable to admit steam to a first stage of the turbine through a nozzle arc, the combination of: means for generating a load demand signal according to a speed reference signal, speed feed-back signal, load reference signal, load feed-back signal, and load change rate signal: means for generating a first valve opening signal under a full arc admission mode according to said load demand signal; means for generating a second valve opening signal under a partial arc admission mode according to said load demand signal; means for generating first and second ratio control signals between steam flow under the full arc admission mode and steam flow under the partial arc admission mode according to the load reference signal, the load feed-back signal, the load change rate signal, and a first stage temperature change rate signal; means for adjusting the said first valve opening signal according to said first ratio control signal; means for adjusting the said second valve opening signal according to said second ratio control signal; and load control means arranged to position said valves to admit a desired total steam flow to said turbine according to the adjusting valve opening signals.
Claim 2
Dependent Claim 207 words
In a steam turbine control system having a turbine and a plurality of valves operable to admit steam to a first stage of the turbine through a nozzle arc, the combination of: means for generating a load demand signal according to a speed reference signal, speed feed-back signal, load reference signal, load feed-back signal, and load change rate signal: means for generating a first valve opening signal under a full arc admission mode according to said load demand signal; means for generating a second valve opening signal under a partial arc admission mode according to said load demand signal; means for generating first and second ratio control signals between steam flow under the full arc admission mode and steam flow under the partial arc admission mode according to the load reference signal, the load feed-back signal, the load change rate signal, and a first stage temperature change rate signal; means for adjusting the said first valve opening signal according to said first ratio control signal; means for adjusting the said second valve opening signal according to said second ratio control signal; and load control means arranged to position said valves to admit a desired total steam flow to said turbine according to the adjusting valve opening signals.
Claim 3
Dependent Claim 19 words
The combination according to claim 1 wherein said second ratio control signal is limited under predetermined low turbine load.
Claim 4
Dependent Claim 40 words
The combination according to claim 1, further comprising, means for determining said load change rate signal according to the load reference signal, the load feedback signal, the first ratio control signal and a plurality of predetermined load change rate signals.
Claim 5
Dependent Claim 23 words
The combination according to claim 3, further comprising, means for adjusting the steam temperature of the steam generator furnishing steam to said turbine.
Claim 6
Dependent Claim 177 words
In a steam turbine control method having a turbine and a plurality of valves operable to admit steam to a first stage of the turbine through a nozzle arc, the steps comprising: determining the load demand on the basis of a speed reference signal, speed feedback signal, load reference signal, load feed-back signal, and load change rate signal; determining a valve opening under full arc admission mode according to said load demand; determining a second valve opening under partial arc admission mode according to said load demand; determining a first and second ratio between the steam flow under the full arc admission mode and the steam flow under the partial arc admission mode according to the load reference signal, the load feed-back signal, the load change rate signal, and first stage temperature change rate signal; adjusting the said first valve opening according to said first ratio; adjusting the said second valve opening according to said second ratio; adjusting said valves to admit a desired total steam flow to said turbine according to the adjusted valve opening values.
Claim 7
Dependent Claim 177 words
In a steam turbine control method having a turbine and a plurality of valves operable to admit steam to a first stage of the turbine through a nozzle arc, the steps comprising: determining the load demand on the basis of a speed reference signal, speed feedback signal, load reference signal, load feed-back signal, and load change rate signal; determining a valve opening under full arc admission mode according to said load demand; determining a second valve opening under partial arc admission mode according to said load demand; determining a first and second ratio between the steam flow under the full arc admission mode and the steam flow under the partial arc admission mode according to the load reference signal, the load feed-back signal, the load change rate signal, and first stage temperature change rate signal; adjusting the said first valve opening according to said first ratio; adjusting the said second valve opening according to said second ratio; adjusting said valves to admit a desired total steam flow to said turbine according to the adjusted valve opening values.
Claim 8
Dependent Claim 17 words
The combination according to claim 5, wherein said second ratio is limited under predetermined low turbine load.
Claim 9
Dependent Claim 38 words
The combination according to claim 5, further comprising the steps of: determining the load change rate according to the load reference signal, the load feedback signal, the first ratio, and a plurality of predetermined load change rate signals.
Claim 10
Dependent Claim 24 words
The combination according to claim 7, further comprising the steps of: adjusting the steam temperature of the steam generator furnishing steam to said turbine.

References Cited (Backward Citations)

US3097489A Cited
US3561216A Cited
US3723018A Cited
US3956897A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-10-16 1982-04-17 1982-10-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-10-16 1986-04-17 1986-10-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-10-16 1990-04-17 1990-10-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag