← Back to Patent Explorer
US4119488A Expired / Lapsed US ⏱️ 0.0 years remaining

Nuclear reactor fuel element employing Zr2 Ni as a getter metal

Assignee: SAES Getters SpA
•
Filing: 1977-05-02
•
Granted: 1978-10-10
•
Expires: 1997-05-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Zr 2 Ni sorbs both oxygen and hydrogen from water making its use advantageous as a getter metal in a nuclear reactor fuel element.

Inventors

  • 👤 Aldo Barosi

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 15:25
CPC Classifications
C; C01; C01B; C01B3/00; C01B3/02; C01B3/04; C01B3/042; C01B13/00; C01B13/02; C01B13/0229; C01B13/0248; C01B13/0259; C01B13/0281; C01B3/0005; C01B3/001; C01B3/0018; C01B3/0031; C01B3/50; C01B3/508; G; G21; G21C; G21C3/00; G21C3/02; G21C3/04; G21C3/16; G21C3/17; Y; Y02; Y02E; Y02E30/00; Y02E30/30; Y02E60/00; Y02E60/30; Y02E60/32; Y02E60/36

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 35 words
A nuclear reactor fuel element comprising: A. a container defining a chamber, B. a fissionable material in the chamber, C. a getter metal within the chamber, said getter metal consisting essentially of Zr 2 Ni
Claim 2
Dependent Claim 35 words
A nuclear reactor fuel element comprising: A. a container defining a chamber, B. a fissionable material in the chamber, C. a getter metal within the chamber, said getter metal consisting essentially of Zr 2 Ni
Claim 3
Dependent Claim 16 words
The nuclear reactor fuel element of claim 1 wherein the fissionable material is UO 2 .
Claim 4
Dependent Claim 21 words
The nuclear reactor fuel element of claim 1 wherein the Zr 2 Ni is present in the form of finely-divided particles.
Claim 5
Dependent Claim 25 words
The nuclear reactor fuel element of claim 1 wherein the Zr 2 Ni is present as particles having a size between 1 and 100 microns.
Claim 6
Dependent Claim 18 words
The nuclear reactor fuel element of claim 4 wherein the particles are pressed into a coherent porous mass.
Claim 7
Dependent Claim 21 words
The nuclear reactor fuel element of claim 1 wherein the greater metal is present in the chamber near one end cap.
Claim 8
Dependent Claim 22 words
The nuclear reactor fuel element of claim 1 wherein the getter metal is maintained at a temperature of 200° to 500° C.
Claim 9
Dependent Claim 30 words
The nuclear reactor fuel element of claim 1 having helium in the chamber to an extent such that the total gas pressure in the chamber is 1 to 30 atmospheres.
Claim 10
Dependent Claim 129 words
A nuclear reactor fuel element of claim 1 comprising: A. a sealed container comprising a tube and two end caps closing the tube and defining a chamber, B. uo 2 in the chamber, C. a getter metal in the chamber said getter metal consisting essentially of Zr 2 Ni wherein: 1. the Zr 2 Ni is present as finely-divided particles, 2. the particles have a size between 1 and 120 microns, 3. the particles are pressed into a coherent porous mass, 4. the getter metal is in the chamber near one end cap, 5. the getter metal is maintained at a temperature of 200° to 500° C., D. helium in the chamber to an extent such that the total gas pressure in the chamber is 1 to 20 atmospheres.

References Cited (Backward Citations)

US1958967A Cited
US3104049A Cited
US3620645A Cited
US3899392A Cited
US4065352A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-10-09 1982-04-10 1982-10-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-10-09 1986-04-10 1986-10-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-10-09 1990-04-10 1990-10-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag