← Back to Patent Explorer
US4105252A Expired / Lapsed US ⏱️ 0.0 years remaining

Solution mining of minerals from vertically spaced zones

Assignee: Atlantic Richfield Co
•
Filing: 1976-12-20
•
Granted: 1978-08-08
•
Expires: 1996-12-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention relates to an improved method for the solution mining of a mineral from a subterranean formation. More specifically, the invention relates to an improved method which enhances significantly the recovery of a mineral via solution mining with an injection and production well from a subterranean formation which contains the mineral in a zone of low permeability having a zone of higher permeability both above and below it. The improvement comprises locating an injection well in one zone of high permeability and a production well in the other zone of high permeability.

Inventors

  • 👤 Thomas F. Moore

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 08:43
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/28

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 131 words
An improved method for the solution mining of a mineral from a subterranean formation containing same in a zone of low permeability have a zone of higher permeability both above and below it in which an injection and production well are drilled and completed, leach solution is injected through said injection well into said formation to dissolve said mineral, and said dissolved mineral is recovered via said production well, wherein the improvement comprises locating one of said wells in one high permeability zone and the other of said wells in the other high permeability zone to establish a potential difference between said high permeability zones and thereby apply a vertical component of flow of said leach solution to said zone of low permeability facilitating the recovery of said mineral present therein.
Claim 2
Dependent Claim 131 words
An improved method for the solution mining of a mineral from a subterranean formation containing same in a zone of low permeability have a zone of higher permeability both above and below it in which an injection and production well are drilled and completed, leach solution is injected through said injection well into said formation to dissolve said mineral, and said dissolved mineral is recovered via said production well, wherein the improvement comprises locating one of said wells in one high permeability zone and the other of said wells in the other high permeability zone to establish a potential difference between said high permeability zones and thereby apply a vertical component of flow of said leach solution to said zone of low permeability facilitating the recovery of said mineral present therein.
Claim 3
Dependent Claim 24 words
The improvement of claim 1 wherein said mineral is selected from the group consisting of copper, nickel, silver, vanadium, molybdenum, rhenium, selenium and uranium.
Claim 4
Dependent Claim 13 words
The improvement of claim 1 wherein said leach solution is acidic in nature.
Claim 5
Dependent Claim 21 words
The improvement of claim 3 wherein said acid leach solution is selected from the group consisting of hydrochloric and sulfuric acid.
Claim 6
Dependent Claim 13 words
The improvement of claim 1 wherein said leach solution is alkaline in nature.
Claim 7
Dependent Claim 35 words
The improvement of claim 5 wherein said alkaline leach solution is an aqueous solution of one or more salts selected from the group consisting of ammonium carbonate, sodium carbonate, potassium carbonate and their respective bicarbonates.
Claim 8
Dependent Claim 25 words
The improvement of claim 1 wherein said mineral containing zone has a permeability of at least 10 to 30% less than said higher permeability zones.
Claim 9
Dependent Claim 20 words
The improvement of claim 1 wherein said low permeability zone is clay and said high permeability zones are porous sand.

References Cited (Backward Citations)

US3278232A Cited
US3679264A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-08-07 1982-02-06 1982-08-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-08-07 1986-02-06 1986-08-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-08-07 1990-02-06 1990-08-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag