Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
231 words
A method of subterranean hydraulic mining comprising the steps of, drilling an input shaft from the terranian surface into a sedimentary deposit to be mined, drilling an output shaft spaced from the input shaft, from the terranian surface into the sedimentary deposit to be mined, using a shaped charge at the lower end of one of the shafts and cracking the sedimentary deposit generally between the input shaft and the output shaft, forcing a fluid down the input shaft and jetting the fluid at a vertical jetting location into the cracked sedimentary deposit with the fluid carrying portions of the sedimentary deposit to the vicinity of the output shaft, positioning the lower end of the output shaft below the fluid level whereby the fluid and sedimentary deposit move by fluid flow to a receiving opening in the lower end of the output shaft, using a pump in the lower end of the output shaft to move the sedimentary deposit and fluid up the output shaft to the terranian surface, selectively moving the jetting location of jetting of the fluid vertically in the sedimentary deposit while maintaining the lower end of the output shaft at or near the bottom of the opening in the sedimentary deposit cut by the fluid flow from the input shaft, and maintaining a cavity around the output shaft and input shaft that is not filled with liquid.
Claim 2
Independent Claim
231 words
A method of subterranean hydraulic mining comprising the steps of, drilling an input shaft from the terranian surface into a sedimentary deposit to be mined, drilling an output shaft spaced from the input shaft, from the terranian surface into the sedimentary deposit to be mined, using a shaped charge at the lower end of one of the shafts and cracking the sedimentary deposit generally between the input shaft and the output shaft, forcing a fluid down the input shaft and jetting the fluid at a vertical jetting location into the cracked sedimentary deposit with the fluid carrying portions of the sedimentary deposit to the vicinity of the output shaft, positioning the lower end of the output shaft below the fluid level whereby the fluid and sedimentary deposit move by fluid flow to a receiving opening in the lower end of the output shaft, using a pump in the lower end of the output shaft to move the sedimentary deposit and fluid up the output shaft to the terranian surface, selectively moving the jetting location of jetting of the fluid vertically in the sedimentary deposit while maintaining the lower end of the output shaft at or near the bottom of the opening in the sedimentary deposit cut by the fluid flow from the input shaft, and maintaining a cavity around the output shaft and input shaft that is not filled with liquid.
Claim 3
Dependent Claim
132 words
The method claimed in claim 1 including the steps of, forcing water down said input shaft and jetting the water out a side directed nozzle, directing air through a high pressured nozzle in the water stream, whereby the air passes into the water stream aiding in the jet action of the fluid and breaking up the sedimentary deposit, and using the air to fill the cavity cut out by the water flow from the input shaft to the output shaft so that the fluid moving out the jet nozzle passes through an air medium rather than a water medium before striking the sedimentary deposit allowing greater jet water force against the inner surface of the deposit to break up the deposit and wash it down to the end of the output shaft.
Claim 4
Dependent Claim
50 words
The method as claimed in claim 1 including the steps of, providing a relatively large opening to the output shaft for passage of relatively large particles of the deposit material, and using a jet pump in moving the water and sedimentary deposit material to the surface through the output shaft.
Claim 5
Dependent Claim
106 words
The method claimed in claim 1 including the steps of, washing out the sedimentary deposits in a given cavity in the sedimentary deposit, plugging the holes in which the output and input shafts were located, drilling new input and output shafts from the terranian surface into a sedimentary deposit to be mined at a location adjacent to the given cavity, forcing a fluid down the input shaft into the cracked sedimentary deposit and washing portions of said sedimentary deposit over to the intake of the output shaft, and leaving a wall of sedimentary deposit material between the adjacent cavities to maintain the support of the formation.
Claim 6
Dependent Claim
98 words
The method as claimed in claim 1, including the steps of: directing air down the input shaft and out the lower end of the shaft, and employding the air to fill the cavity cut out by the water flow from the input shaft to the output shaft so that the fluid moving out the jet nozzle passes through an air medium rather than the water medium before striking the sedimentary deposit allowing greater jet fluid force against the inner surface of the deposit to break up the deposit and wash it to the end of the output shaft.
Claim 7
Dependent Claim
41 words
The method as claimed in claim 5 including the step of, horizontally rotating the jetting of the fluid at the lower end of the input shaft for directing the fluid stream in all directions through the air medium of the cavity.