Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
91 words
A steam turbine system comprising a plurality of turbine sections, a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, a control system having a speed/load control for generating desired valve position signals, means for generating respective signals representative of the actual valve positions, means for comparing each actual valve position signal to the corresponding desired valve position, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 2
Dependent Claim
91 words
A steam turbine system comprising a plurality of turbine sections, a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, a control system having a speed/load control for generating desired valve position signals, means for generating respective signals representative of the actual valve positions, means for comparing each actual valve position signal to the corresponding desired valve position, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 3
Dependent Claim
63 words
A turbine system as set forth in claim 1 wherein said control system includes an automatic speed/load control for generating desired valve position signals and a backup speed/load control for generating desired valve position signals, means are provided for selectively applying the automatic or backup desired position signals to position said valves, and said comparison and contingency generating means function during automatic control.
Claim 4
Dependent Claim
71 words
A turbine system as set forth in claim 2 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.
Claim 5
Dependent Claim
37 words
A turbine system as set forth in claim 3 wherein a comparison difference value is registered in said computer for each valve, and said varying means is operative to register selectable comparison difference values for each valve.
Claim 6
Dependent Claim
74 words
A turbine system as set forth in claim 2 wherein said automatic control includes a digital computer which generates the desired valve position signals in the form of valve position setpoint signals and includes means for sequentially controlling its programmed operation, said control system further includes an electrohydraulic positioning control for each valve, and said electrohydraulic controls responding to the valve position setpoint signals and the actual valve position signals to position said valves.
Claim 7
Dependent Claim
135 words
A steam turbine system comprising a plurality of turbine sections, a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, a control system having an automatic speed/load control for generating desired valve position signals and a backup speed/load control for generating desired valve position signals, means for selectively applying the automatic or backup desired position signals to position said valves, means for responding to said automatic control to cause said backup control to track its desired valve position signals to the corresponding desired valve position signals from said automatic control, means for comparing the corresponding backup and automatic desired valve position signals, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 8
Dependent Claim
135 words
A steam turbine system comprising a plurality of turbine sections, a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, a control system having an automatic speed/load control for generating desired valve position signals and a backup speed/load control for generating desired valve position signals, means for selectively applying the automatic or backup desired position signals to position said valves, means for responding to said automatic control to cause said backup control to track its desired valve position signals to the corresponding desired valve position signals from said automatic control, means for comparing the corresponding backup and automatic desired valve position signals, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 9
Dependent Claim
71 words
A turbine system as set forth in claim 6 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.
Claim 10
Dependent Claim
58 words
A turbine system as set forth in claim 6 wherein means are provided for generating respective signals representative of the actual valve positions, means are provided for comparing each actual valve position signal to the corresponding desired valve position, and means are provided for generating a contingency output if any valve position comparison difference exceeds a predetermined value.
Claim 11
Dependent Claim
71 words
A turbine system as set forth in claim 8 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.
Claim 12
Dependent Claim
89 words
A control system for a steam turbine having a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, said control system comprising a speed/load control for generating desired valve position signals, means for generating respective signals representative of the actual valve positions, means for comparing each actual valve position signal to the corresponding desired valve position, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 13
Dependent Claim
89 words
A control system for a steam turbine having a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, said control system comprising a speed/load control for generating desired valve position signals, means for generating respective signals representative of the actual valve positions, means for comparing each actual valve position signal to the corresponding desired valve position, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 14
Dependent Claim
64 words
A turbine control system as set forth in claim 10 wherein an automatic speed/load control is provided for generating desired valve position signals and a backup speed/load control is provided for generating desired valve position signals, means are provided for selectively applying the automatic or backup desired position signals to position said valves, and said comparison and contingency generating means function during automatic control.
Claim 15
Dependent Claim
72 words
A turbine control system as set forth in claim 11 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.
Claim 16
Dependent Claim
38 words
A turbine control system as set forth in claim 12 wherein a comparison difference value is registered in said computer for each valve, and said varying means is operative to register selectable comparison difference values for each valve.
Claim 17
Dependent Claim
133 words
A control system for a steam turbine having a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, said control system comprising an automatic speed/load control for generating desired valve position signals and a backup speed/load control for generating desired valve position signals, means for selectively applying the automatic or backup desired position signals to position said valves, means for responding to said automatic control to cause said backup control to track its desired valve position signals to the corresponding desired valve position signals from said automatic control, means for comparing the corresponding backup and automatic desired valve position signals, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 18
Dependent Claim
133 words
A control system for a steam turbine having a predetermined arrangement of throttle and governor valves, said throttle and governor valves disposed to control the flow of steam from a steam generating system to the turbine, said control system comprising an automatic speed/load control for generating desired valve position signals and a backup speed/load control for generating desired valve position signals, means for selectively applying the automatic or backup desired position signals to position said valves, means for responding to said automatic control to cause said backup control to track its desired valve position signals to the corresponding desired valve position signals from said automatic control, means for comparing the corresponding backup and automatic desired valve position signals, and means for generating a contingency output if any comparison difference exceeds a predetermined value.
Claim 19
Dependent Claim
75 words
A turbine control system as set forth in claim 14 wherein said automatic control includes a digital computer which generates the desired valve position signals in the form of valve position setpoint signals and includes means for sequentially controlling its programmed operation, said control system further includes an electrohydraulic positioning control for each valve, and said electrohydraulic controls responding to the valve position setpoint signals and the actual valve position signals to position said valves.
Claim 20
Dependent Claim
72 words
A turbine control system as set forth in claim 14 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.
Claim 21
Dependent Claim
31 words
A turbine control system as set forth in claim 16 wherein said operator panel includes a display means and means are provided for coupling the contingency outputs to said display means.
Claim 22
Dependent Claim
59 words
A turbine control system as set forth in claim 14 wherein means are provided for generating respective signals representative of the actual valve positions, means are provided for comparing each actual valve position signal to the corresponding desired valve position, and means are provided for generating a contingency output if any valve position comparison difference exceeds a predetermined value.
Claim 23
Dependent Claim
72 words
A turbine control system as set forth in claim 18 wherein said automatic control includes a digital computer, an operator panel having selection circuit means is coupled to said computer, said computer includes said comparison and contingency generating means and means for sequentially controlling its programmed operation, and means including said operator panel circuit means are provided for varying the comparison difference value at which said contingency generating means generates contingency outputs.