← Back to Patent Explorer
US4085594A Expired / Lapsed US ⏱️ 0.0 years remaining

Control system for cooling tower fans

Assignee: Sunoco Inc R&M
•
Filing: 1977-02-14
•
Granted: 1978-04-25
•
Expires: 1997-02-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A control system for automatically controlling the operation of a plurality of fans for a cooling tower so that the minimum number of fans and the lowest speeds are used to provide the required cooling necessary at any one time. The fans are individually controlled in response to the temperature of the working fluid, to be either off or operated at a low or high speed so that as the temperature of the working fluid increases, more fans are turned on first to their low speed and then to their high speed. Safety features are provided for starting the system and for changing the speeds of the fans to prevent damage to the control system and unnecessary wear on the fan motors.

Inventors

  • 👤 Robert Mayer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 05:17
CPC Classifications
F; F04; F04D; F04D27/00; F04D27/004; F04D27/008; G; G05; G05D; G05D23/00; G05D23/19; G05D23/1906; G05D23/1912; G05D23/20; G05D23/24; Y; Y02; Y02B; Y02B30/00; Y02B30/70; Y10; Y10S; Y10S388/00; Y10S388/923; Y10S388/934

Claims Analysis

Total Claims: 9
Claim 1
Independent Claim 156 words
A control system for automatically controlling the operation of a cooling tower fan with a two speed fan motor in response to the temperature of the coolant circuit comprising: (a) means, responsive to the temperature of the coolant being above a predetermined first temperature, for producing a first actuating signal; (b) means, responsive to the first actuating signal, for producing a first energizing signal having a first predetermined time duration; (c) means, responsive to the first energizing signal, for turning the fan motor on at its low speed; (d) means, responsive to the first energizing signal, for producing an energy termination signal having a second predetermined time duration less than said first predetermined time duration; (e) means, responsive to the energy termination signal, for disconnecting power supplied to the fan motor, whereby the fan motor is first disconnected from its power supply for said second predetermined time duration before being turned on at its low speed.
Claim 2
Dependent Claim 156 words
A control system for automatically controlling the operation of a cooling tower fan with a two speed fan motor in response to the temperature of the coolant circuit comprising: (a) means, responsive to the temperature of the coolant being above a predetermined first temperature, for producing a first actuating signal; (b) means, responsive to the first actuating signal, for producing a first energizing signal having a first predetermined time duration; (c) means, responsive to the first energizing signal, for turning the fan motor on at its low speed; (d) means, responsive to the first energizing signal, for producing an energy termination signal having a second predetermined time duration less than said first predetermined time duration; (e) means, responsive to the energy termination signal, for disconnecting power supplied to the fan motor, whereby the fan motor is first disconnected from its power supply for said second predetermined time duration before being turned on at its low speed.
Claim 3
Dependent Claim 64 words
A system as recited in claim 1, further comprising: (a) means, responsive to the temperature of the coolant being above a predetermined second temperature which is higher than said first temperature, for producing a second actuating signal; (b) means, responsive to the second actuating signal, for producing a second energizing signal having a predetermined time duration greater than that of the energy termination signal;
Claim 4
Dependent Claim 48 words
(c) said means for producing an energy termination signal is also responsive to the second energizing signal to produce an energy termination signal, whereby power to the fan motor will be disconnected for a predetermined time interval before the fan motor is turned on to its high speed.
Claim 5
Dependent Claim 48 words
(c) said means for producing an energy termination signal is also responsive to the second energizing signal to produce an energy termination signal, whereby power to the fan motor will be disconnected for a predetermined time interval before the fan motor is turned on to its high speed.
Claim 6
Dependent Claim 44 words
The system recited in claim 2, further comprising means, responsive to the second actuating signal, for preventing the means for producing a first energizing signal from producing a first energizing signal, thereby preventing the fan motor from possibly being energized simultaneously at two speeds.
Claim 7
Dependent Claim 37 words
The system recited in claim 3, wherein the first energizing signal producing means, the second energizing signal producing means, and the energy termination signal producing means each include a time delay circuit followed by a Schmidt-trigger circuit.
Claim 8
Dependent Claim 93 words
The system recited in claim 4, and including: (a) a wheatstone bridge circuit having a temperature sensitive resistor, reference terminal, and two output terminals; (b) said means for producing a first actuating signal is responsive to the voltage on the first output terminal becoming greater than the voltage on the reference terminal for producing the first actuating signal; and (c) said means for producing a second actuating signal is responsive to the voltage on the second output terminal becoming greater than the voltage on the reference terminal for producing the second actuating signal.
Claim 9
Dependent Claim 59 words
The system recited in claim 5, further including a circuit for applying power to said ststem when starting it so that it is preconditioned to operate properly, said start-up circuit comprising means for preventing the formation of the first energizing signal and the second energizing signal for a predetermined duration of time at the start up of the system.

References Cited (Backward Citations)

US2222989A Cited
US3665277A Cited
US3853174A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-04-24 1981-10-24 1982-04-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-04-24 1985-10-24 1986-04-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-04-24 1989-10-24 1990-04-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag