← Back to Patent Explorer
US4080784A Expired / Lapsed US ⏱️ 0.0 years remaining

Gas turbine engine power plant with a coal burning fluidized bed

Assignee: Rolls Royce PLC
•
Filing: 1975-10-07
•
Granted: 1978-03-28
•
Expires: 1995-10-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A gas turbine engine power plant having a coal burning fluidized bed utilized as the heating source for the power plant. The fluidized bed comprises inerts and coal in which is immersed a temperature sensitive device, the signal from which is used to control the supply of coal to the bed to thereby maintain the bed at a predetermined temperature and to limit the bed temperature to a predetermined maximum value. The bed can be fluidized by the flow of compressed air from the compressor of the gas turbine engine power plant and the whole of the compressor delivery air flows through the bed in direct chemical contact with the bed materials and is then cleaned prior to delivery to the turbines of the power plant from which it is discharged to atmosphere.

Inventors

  • 👤 Albert Jubb

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 18:52
CPC Classifications
F; F02; F02C; F02C3/00; F02C3/20; F02C3/205; F23; F23N; F23N5/00; F23N5/02

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 279 words
A gas turbine engine power plant comprising: a compressor having a delivery end for discharging compressed air; a coal burning fluidised bed for coal ash and unburnt coal; means for supplying all of the compressed air from the delivery end of said compressor into the coal burning fluidised bed to fluidising the coal ash and unburnt coal therein and to have direct chemical contact with the coal ash and unburnt coal and to be heated thereby; a cleaner for receiving and cleaning all of the heated air and exhaust gases from said fluidised bed; a compressor driving turbine in series with a power turbine which drives a load; means for supplying all of the heated air and exhaust gases from said cleaner first to clean compressor driving turbine and then to said power turbine and from said power turbine to atmosphere; a coal supply means connected to said fluidised bed for supplying coal suspended in compressed air to the fluidised bed; a coal supply control means operatively connected to said coal supply means for controlling the supply of coal delivered by said coal supply means to said fluidised bed; and a bed temperature sensing means operatively connected to said fluidised bed and to said coal supply control means, said sensing means being arranged to produce signals dependent on bed temperature to thereby selectively operate said coal supply control means in response to such signals so as to cause said coal supply means to deliver more coal to said bed when said bed temperature drops below a predetermined minimum value and to cut off delivery of coal to said bed to thereby limit bed temperature to a predetermined maximum value.
Claim 2
Dependent Claim 279 words
A gas turbine engine power plant comprising: a compressor having a delivery end for discharging compressed air; a coal burning fluidised bed for coal ash and unburnt coal; means for supplying all of the compressed air from the delivery end of said compressor into the coal burning fluidised bed to fluidising the coal ash and unburnt coal therein and to have direct chemical contact with the coal ash and unburnt coal and to be heated thereby; a cleaner for receiving and cleaning all of the heated air and exhaust gases from said fluidised bed; a compressor driving turbine in series with a power turbine which drives a load; means for supplying all of the heated air and exhaust gases from said cleaner first to clean compressor driving turbine and then to said power turbine and from said power turbine to atmosphere; a coal supply means connected to said fluidised bed for supplying coal suspended in compressed air to the fluidised bed; a coal supply control means operatively connected to said coal supply means for controlling the supply of coal delivered by said coal supply means to said fluidised bed; and a bed temperature sensing means operatively connected to said fluidised bed and to said coal supply control means, said sensing means being arranged to produce signals dependent on bed temperature to thereby selectively operate said coal supply control means in response to such signals so as to cause said coal supply means to deliver more coal to said bed when said bed temperature drops below a predetermined minimum value and to cut off delivery of coal to said bed to thereby limit bed temperature to a predetermined maximum value.
Claim 3
Dependent Claim 50 words
A gas turbine engine power plant as claimed in claim 1 in which the coal supply means comprises a hopper containing coal, an outlet controlled by the coal supply control means a duct leading to the fluidised bed along which coal can be blown by a supply of compressed air.
Claim 4
Dependent Claim 45 words
A gas turbine engine power plant as claimed in claim 1 in which said bed temperature sensing means comprises a stainless steel tube enclosing a quartz rod movable relative to the tube and operatively connected to said coal supply control means for controlling the same.
Claim 5
Dependent Claim 63 words
A gas turbine engine power plant as claimed in claim 1 in which said bed temperature sensing means comprises a thermocouple having an output signal which is compared with a reference signal to give an error signal, an amplifier for receiving said error signal and amplifying the same, said coal supply means including a motor operatively connected to said amplifier and controlled thereby.

References Cited (Backward Citations)

US2161892A Cited
US2215067A Cited
US2305785A Cited
US2295045A Cited
US2511017A Cited
GB657346A Cited
US2714670A Cited
US3271951A Cited
US3298338A Cited
US3446012A Cited
US3847092A Cited
US3871172A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-03-27 1981-09-26 1982-03-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-03-27 1985-09-26 1986-03-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-03-27 1989-09-26 1990-03-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag