← Back to Patent Explorer
US4073594A Expired / Lapsed US ⏱️ 0.0 years remaining

Pump starting method for hydraulic machinery

Assignee: Hitachi Ltd
•
Filing: 1976-06-04
•
Granted: 1978-02-14
•
Expires: 1996-06-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A pump starting method for hydraulic machinery such as a pump turbine and a pump having adjustable guide vanes and an inlet valve, by which hydraulic vibrations due to pump no discharge operation can be prevented by beginning pumping-up with said adjustable guide vanes being opened before a main valve included in a said inlet valve is fully opened in starting the pump.

Inventors

  • 👤 Nobuho Takagi
  • 👤 Mituo Takase
  • 👤 Takashi Itoh
  • 👤 Katsumi Seno
  • 👤 Toshihiko Koseki

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 10:49
CPC Classifications
F; F03; F03B; F03B15/00; F03B15/005; F04; F04D; F04D15/00; F04D15/0077; Y; Y02; Y02E; Y02E10/00; Y02E10/20

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 87 words
A pump starting method for hydraulic machinery wherein a runner is brought into no discharge operation in water at flow rate 0 in pump starting, said method comprising the steps of: a main valve included in an inlet valve to the hydraulic machinery disposed on the side of an upper reservoir upstream of said hydraulic machinery being opened when the discharge pressure of the runner reaches a predetermined value; and adjustable guide vanes being opened to begin pumping-up while said main valve moves to be fully opened.
Claim 2
Dependent Claim 87 words
A pump starting method for hydraulic machinery wherein a runner is brought into no discharge operation in water at flow rate 0 in pump starting, said method comprising the steps of: a main valve included in an inlet valve to the hydraulic machinery disposed on the side of an upper reservoir upstream of said hydraulic machinery being opened when the discharge pressure of the runner reaches a predetermined value; and adjustable guide vanes being opened to begin pumping-up while said main valve moves to be fully opened.
Claim 3
Dependent Claim 167 words
A pump starting method for hydraulic machinery comprised of a penstock communicating between an upper and a lower reservoir and adjustable guide vanes, and an inlet valve to the machinery provided at the intermediate portion of the penstock, said inlet valve including a downstream seal portion, and a by-pass valve and a main valve both provided on the side of an upper reservoir upstream of said hydraulic machinery, wherein said method comprises the steps of: said by-pass valve being opened when the rotation speed of the runner of the hydraulic machinery is increased to the rated speed and the discharge pressure of runner reaches a predetermined valve; the downstream seal included in the inlet valve being released when a differential pressure in front and in the rear of the main valve caused by opening of the by-pass valve reaches a predetermined differential pressure; and thereafter, the adjustable guide vanes being opened to begin pumping-up when the main valve reaches a predetermined opening degree less than full open.
Claim 4
Dependent Claim 167 words
A pump starting method for hydraulic machinery comprised of a penstock communicating between an upper and a lower reservoir and adjustable guide vanes, and an inlet valve to the machinery provided at the intermediate portion of the penstock, said inlet valve including a downstream seal portion, and a by-pass valve and a main valve both provided on the side of an upper reservoir upstream of said hydraulic machinery, wherein said method comprises the steps of: said by-pass valve being opened when the rotation speed of the runner of the hydraulic machinery is increased to the rated speed and the discharge pressure of runner reaches a predetermined valve; the downstream seal included in the inlet valve being released when a differential pressure in front and in the rear of the main valve caused by opening of the by-pass valve reaches a predetermined differential pressure; and thereafter, the adjustable guide vanes being opened to begin pumping-up when the main valve reaches a predetermined opening degree less than full open.
Claim 5
Dependent Claim 105 words
A pump starting method of hydraulic machinery consisting of a penstock communicating between an upper and a lower reservoir and adjustable guide vanes and an inlet valve to the machinery provided at the intermediate portion of the penstock, said inlet valve including a downstream seal portion, and a by-pass valve and a main valve both provided on the side of an upper reservoir upstream of said hydraulic machinery, the steps wherein: in starting the pump of said hydraulic machinery, said by-pass valve, downstream seal, main valve and adjustable guide vanes are actuated to open independently of one another by plural pressure detectors, thereby beginning pumping-up.
Claim 6
Dependent Claim 105 words
A pump starting method of hydraulic machinery consisting of a penstock communicating between an upper and a lower reservoir and adjustable guide vanes and an inlet valve to the machinery provided at the intermediate portion of the penstock, said inlet valve including a downstream seal portion, and a by-pass valve and a main valve both provided on the side of an upper reservoir upstream of said hydraulic machinery, the steps wherein: in starting the pump of said hydraulic machinery, said by-pass valve, downstream seal, main valve and adjustable guide vanes are actuated to open independently of one another by plural pressure detectors, thereby beginning pumping-up.
Claim 7
Dependent Claim 28 words
The pump starting method according to claim 3, wherein the step of opening said adjustable vanes is commenced prior to said main valve achieving a fully open position.
Claim 8
Dependent Claim 76 words
A pump starting method comprising the steps of: with adjustable guide vanes being in a fully closed position, bringing a pump runner up to its operational speed; establsihing a predetermined discharge pressure in the runner; opening a by-pass valve when said predetermined pressure is established; opening a seal downstream of said runner; opening a main valve upon said seal reaching a fully open position; starting to open said adjustable guide vanes after said main valve starts
Claim 9
Dependent Claim 76 words
A pump starting method comprising the steps of: with adjustable guide vanes being in a fully closed position, bringing a pump runner up to its operational speed; establsihing a predetermined discharge pressure in the runner; opening a by-pass valve when said predetermined pressure is established; opening a seal downstream of said runner; opening a main valve upon said seal reaching a fully open position; starting to open said adjustable guide vanes after said main valve starts
Claim 10
Dependent Claim 38 words
to open but prior to said main valve reaching a fully opened position. 6. The pump starting method according to claim 5, wherein the step of opening a seal downstream of said runner is commenced when said by-pass
Claim 11
Dependent Claim 34 words
valve reaches a predetermined position. 7. The pump starting method according to claim 6, wherein the step of opening a seal downstream of said runner is commenced when the differential pressure between the front
Claim 12
Dependent Claim 84 words
and rear of said main valve reaches a predetermined value. 8. The pump starting method according to claim 5, wherein the step of bringing said pump runner up to operational speed is commenced after a compressed gas has been introduced into a runner chamber formed by said closed vanes and has depressed the water level in said runner chamber to a level below the runner, and said step of establishing a pedetermined discharge pressure being commenced by discharging said compressed gas from said chamber.

References Cited (Backward Citations)

US3030070A Cited
US3264485A Cited
US3309057A Cited
US3403888A Cited
US3658436A Cited
US3945754A Cited
US3960463A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-02-13 1981-08-15 1982-02-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-02-13 1985-08-15 1986-02-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-02-13 1989-08-15 1990-02-14 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag