Claim 1
Independent Claim
158 words
The combination with a turbo-set comprising a turbine shaft coupled to an alternating current electrical generator whose output is delivered to a high-voltage power system and wherein valve means are provided for controlling the fluid flow to said turbine of an improved arrangement for effecting a rapid closure of said valve means with minimally delayed closing instructions in the event of a sustained major fault on said power system which comprises; means producing a first provisional signal upon a predetermined drop in the network voltage and which is passed to said valve means for commencing a closing operation of said valve means, means producing a second signal having a level indicative of the acceleration of the turbine shaft within two revolutions thereof following the drop in network voltage, and means responsive upon a failure of said second signal to reach a predetermined level for cancelling out said first signal thereby terminating the closing operation of said valve means.
Claim 2
Dependent Claim
158 words
The combination with a turbo-set comprising a turbine shaft coupled to an alternating current electrical generator whose output is delivered to a high-voltage power system and wherein valve means are provided for controlling the fluid flow to said turbine of an improved arrangement for effecting a rapid closure of said valve means with minimally delayed closing instructions in the event of a sustained major fault on said power system which comprises; means producing a first provisional signal upon a predetermined drop in the network voltage and which is passed to said valve means for commencing a closing operation of said valve means, means producing a second signal having a level indicative of the acceleration of the turbine shaft within two revolutions thereof following the drop in network voltage, and means responsive upon a failure of said second signal to reach a predetermined level for cancelling out said first signal thereby terminating the closing operation of said valve means.
Claim 3
Dependent Claim
248 words
The combination with a turbo-set comprising a turbine shaft coupled to an alternating current electrical generator whose output is delivered to a high-voltage power system and wherein valve means are provided for controlling the fluid flow to said turbine of an improved arrangement for effecting a rapid closure of said valve means with minimally delayed closing instructions in the event of a sustained major fault on said power system which comprises: means for measuring the network voltage, means comparing said measured network voltage with a reference limit voltage and which produces a first provisional valve closing signal when said measured network voltage falls below said reference limit voltage by a predetermined amount, a memory to the set input of which said first provisional valve-closing signal is fed, means for measuring the acceleration of said turbine shaft within two revolutions thereof, means comparing said measured turbine shaft acceleration with a reference limit value of acceleration and which produces a second signal when said measured turbine shaft acceleration exceeds said reference acceleration, means for actuating said valve means to a closed position and which are connected to the output signal from said memory, an AND gate having direct and inverting inputs, means connecting the output signal from said memory through a delay unit to the direct input of said AND gate, means connecting said second signal to the inverting input of said AND gate, and means connecting the output from said AND gate to the reset input of said memory.
Claim 4
Dependent Claim
248 words
The combination with a turbo-set comprising a turbine shaft coupled to an alternating current electrical generator whose output is delivered to a high-voltage power system and wherein valve means are provided for controlling the fluid flow to said turbine of an improved arrangement for effecting a rapid closure of said valve means with minimally delayed closing instructions in the event of a sustained major fault on said power system which comprises: means for measuring the network voltage, means comparing said measured network voltage with a reference limit voltage and which produces a first provisional valve closing signal when said measured network voltage falls below said reference limit voltage by a predetermined amount, a memory to the set input of which said first provisional valve-closing signal is fed, means for measuring the acceleration of said turbine shaft within two revolutions thereof, means comparing said measured turbine shaft acceleration with a reference limit value of acceleration and which produces a second signal when said measured turbine shaft acceleration exceeds said reference acceleration, means for actuating said valve means to a closed position and which are connected to the output signal from said memory, an AND gate having direct and inverting inputs, means connecting the output signal from said memory through a delay unit to the direct input of said AND gate, means connecting said second signal to the inverting input of said AND gate, and means connecting the output from said AND gate to the reset input of said memory.
Claim 5
Dependent Claim
43 words
Apparatus as defined in claim 2 wherein said means comparing said measured network voltage with a reference limit voltage is constituted by a pure voltage discriminator from which said first provisional valve closing signal is fed to the set input of said memory.
Claim 6
Dependent Claim
61 words
Apparatus as defined in claim 2 wherein said means comparing said measured network voltage with a reference limit voltage is constituted by a voltage step-change detector which responds only to a step wise reduction in network voltage that exceeds a predetermined value thereby to produce said first provisional valve closing signal which is fed to the set input of said memory.
Claim 7
Dependent Claim
52 words
Apparatus as defined in claim 2 and which further includes an OR gate through which said first provisional valve closing signal is fed to the set input of said memory and a second OR gate through which the output from said AND gate is fed to the reset input of said memory.